| 1 | 1 | Picking up & remove old bituminous layer ................... Where thickness of layer is. KMDA,(W.S)2012, P-61, It- 1.3 a,b,c ii) 50mm to 100mm | | 325 | M2 |
|---|
| 2 | 2 | Dismantling all types of plain cement concrete……..directed. Up to 150 mm thick. Ref: P.W.D (Bldg) Sch. -2017, page -10 It- 2(a) | | 4 | M3 |
|---|
| 3 | 3 | Earth work in excavation in trenches .................of the E.I.C a) Upto 1.5 M below G.L KMDA,(W.S)2012, P-61, It- 1.1.a | | 455 | M3 |
|---|
| 4 | 4 | Hire and labour charges 75 mm dia bamboo railing …………timber. Railing with 3 rows. Ref: P.W.D (Bldg) w.e.f- 1.11.2017, page -271, It- 4(ii) | | 80 | M |
|---|
| 5 | 5 | Hire and labour charges for shoring work …………….of the E.I.C KMDA,(W.S)2012, P-61, It- 1.5a, (1&2) (a) Depth up to 1.5M | | 50 | M2 |
|---|
| 6 | 6 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm............. complete. Ref: P.W.D (Bldg) Sch. -2017, page -2, It- 4(a) | | 16.31 | M3 |
|---|
| 7 | 7 | Lowering and type D.I pipes………….of the E.I.C. KMDA(WS)2012, P-63, IT-2.2.b,c&d (c) 200 mm dia.& 250mm dia | | 150 | M |
|---|
| 8 | 8 | Rubber gasket joints to D.I pipes……of the E.I.C. KMDA(WS)2012, P-66, IT-2.5b,c&d,e,f (c) 200 mm dia. | | 30 | Each |
|---|
| 9 | 9 | Lead jointing to C.I pipes……….of the E.I.C KMDA(WS)2012, P-64, IT-2.3.b,d &e,f,g (c) 200 mm dia. | | 4 | Each |
|---|
| 10 | 10 | Flange joints to D.I pipes and specials………….of the E.I.C.KMDA(WS)2012’, P-67, IT-2.6, b,d &e,f,g (b) 150 mm dia. | | 4 | Each |
|---|
| 11 | 11 | Flange joints to D.I pipes and specials………….of the E.I.C.KMDA(WS)2012’, P-67, IT-2.6, b,d &e,f,g (c) 200 mm dia. | | 2 | Each |
|---|
| 12 | 12 | Cutting C.I/D.I pipes for fittings with pipes……….of the E.I.C. KMDA(WS)2012’, P-68, IT-2.7, b,c &d,e,f (b) 150 mm dia. | | 1 | Each |
|---|
| 13 | 13 | Cutting C.I/D.I pipes for fittings with pipes……….of the E.I.C. KMDA(WS)2012’, P-68, IT-2.7, b,c &d,e,f (c) 200 mm dia. | | 8 | Each |
|---|
| 14 | 14 | Chamfering the spigot end to C.I/D.I pipes of the E.I.C. KMDA(WS)2012’, P-69, IT-2.8, c,d,e,f (b) 200 mm dia. | | 30 | Each |
|---|
| 15 | 15 | Lowering fitting and fixing all types of valves………of the E.I.C. KMDA(WS)2012’, P-81, IT-5.2, b,d,e,f.g (b) 150 mm dia. | | 2 | Each |
|---|
| 16 | 16 | Lowering fitting and fixing all types of valves………of the E.I.C. KMDA(WS)2012’, P-81, IT-5.2, b,d,e,f.g (c) 200 mm dia. | | 1 | Each |
|---|
| 17 | 17 | Shifting house connection or stand post …………of the E.I.C............................. KMDA(WS)2012’, P-85, IT-6.7 | | 52 | Each |
|---|
| 18 | 18 | C.I. Sluice Valve cast iron double flanged …………..I.S 1538:1993 KMDA(WS)2012’, P-99, IT-10.7, ii,iv,v,vi,vii(b) 150 mm dia. | | 2 | Each |
|---|
| 19 | 19 | C.I. Sluice Valve cast iron double flanged …………..I.S 1538:1993 KMDA(WS)2012’, P-99, IT-10.7, ii,iv,v,vi,vii(c) 200 mm dia. | | 1 | Each |
|---|
| 20 | 20 | Dewatering by pumps .........of the E.I.C. KMDA(WS)2012’, P-119, IT-13.1 | | 800 | HP/HR |
|---|
| 21 | 21 | Centrifugally cast (Spun) D.I pipe…………….coating class K9 KMDA(WS)2012’, P-94, 95 IT-10.4 A,c,d,e & B, a,ba) 200 mm dia. | | 150 | Mtr. |
|---|
| 22 | 22 | Providing lighting arrangements…………….etc complete. Rate approved by HMC | | 2 | Night |
|---|
| 23 | 23 | Drilled & taping C.I main up to 15mm PWD(S&P) w.e.f 1.11.17 P-27 It-18(i) | | 4 | Set |
|---|
| 24 | 24 | Supplying, fitting & fixing G.I pipe of TATA make underground…………..in all respect. PWD(S&P) w.e.f 1.11.17 P-2 It-3(ii) (a) 15 mm dia(M.Q). | | 2 | M |
|---|
| 25 | 25 | Hydraulically testing of C.I/D.I pipes………….of the E.I.C. KMDA(WS)2012’, P-88, IT-8.1b,c,d,e,f (b) 150 mm dia. | | 600 | M |
|---|
| 26 | 26 | Hydraulically testing of C.I/D.I pipes………….of the E.I.C. KMDA(WS)2012’, P-88, IT-8.1b,c,d,e,f (c) 200 mm dia. | | 150 | M |
|---|
| 27 | 27 | Disinfection of water main by filling with water ……………….of the E.I.C. KMDA(WS)2012’, P-90, IT-9.1 b,c,d,e,f (b) 150 mm dia. | | 600 | M |
|---|
| 28 | 28 | Disinfection of water main by filling with water ……………….of the E.I.C. KMDA(WS)2012’, P-90, IT-9.1 b,c,d,e,f (c) 200 mm dia. | | 150 | M |
|---|
| 29 | 29 | Supplying including cost of installation of C.I Mechanical compression ………………C.I/D.I pipes. [Ref:-K.M.D.A (ws)2012,Page-123,It-13.25]b,d,e,f,g (e) 150 mm dia. | | 4 | EACH |
|---|
| 30 | 30 | Supplying including cost of installation of C.I Mechanical compression ………………C.I/D.I pipes. [Ref:-K.M.D.A (ws)2012,Page-123,It-13.25]b,d,e,f,g (f) 200 mm dia. | | 2 | EACH |
|---|
| 31 | 31 | All types of C.I specials ………1538 to 1993. KMDA(WS)2012’, P-93, IT-10.3 a&b (a) Socket and Spigot ended. 92 80 mm to 300 mm | | 275 | Kg. |
|---|
| 32 | 32 | Earth Work in filling in foundation trenches…………from excavation KMDA(WS)2012’, P-61, IT-1.2 | | 487.5 | M3 |
|---|
| 33 | 33 | Removal of rubbish/Earth……….of the E.I.C. K.M.A.D (WS)2012 Sch. -2014, page -118, It- 12.8 | | 325 | M3 |
|---|
| 34 | 34 | Supply H.D.P.E pipe confirming to I.S-4984/1985.P.E-100 Rate accepted by H.M.C(a) 160 mm dia. | | 600 | M |
|---|
| 35 | 35 | Lowering and jointing labour charges for laying and jointing of 4984.P.E-100 Rate accepted by H.M.C (a)160 mm dia. | | 600 | M |
|---|
| 36 | 36 | Supply H.D.P.E pipe fittings………….P.E-100 Rate accepted by H.M.C (a) 160 mm dia bend. | | 2 | Each |
|---|
| 37 | 37 | Supply H.D.P.E pipe fittings………….P.E-100 Rate accepted by H.M.C (b) 160 mm dia pipe end | | 30 | Each |
|---|
| 38 | 38 | Supply H.D.P.E pipe fittings………….P.E-100 Rate accepted by H.M.C (c) 160 mm dia equal tee | | 2 | Each |
|---|
| 39 | 39 | Supply H.D.P.E pipe fittings………….P.E-100 Rate accepted by H.M.C (d) 160 mm dia sand with flange | | 30 | Each |
|---|
| 40 | 40 | Single brick soling………..sand Ref: P.W.D (Bldg) Sch. -2017, page -14, It- 1 | | 390 | M2 |
|---|
| 41 | 41 | Repair of Air valve supply Ebonite and rubber bell gasket, Nuts and bolts with washers and labour all complete. C.M.D.A (WS) 2012’,P-120, It-13.11(b),(c),(d) (a) 100 mm dia. | | 2 | Each |
|---|
| 42 | 42 | GST 12% | | 1 | LS |
|---|
| 43 | 43 | Labour wellfare Cess 1% | | 1 | LS |
|---|