| 1 | Civil Works | ? | 57.96 | cum | 310.07 | 17972.00 |
| Filling with gravel (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and tamping including cost and Cost and Conveyance of water to site and all operational, incidental, labour charges, sales and other taxes etc, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309) For Side berms |
| 2 | Civil Works | ? | 110.25 | cum | 6841.81 | 754310.00 |
| Construction of un-reinforced, plain cement concrete pavement, thickness as per design using 20mm metal 2/3 and 12mm metal 1/3 over a prepared sub base with 43 grade cement or any other type caluse 1501.2.2, M20 grade coarse and fine aggregate conforming to IS 383, maximum in a concrete mixer of not less than 0.20cum capacity and approriate weigh batcher using approved mix design, laid in approved fixed side form work (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as oer drawing), spreading the concrete with shovels, rakes, compacted using needle scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer sealant, dowel bar, near approaches, admixtures as approved, curing of concrete slabs for 14 days etc., complete. |
| 3 | Civil Works | ? | 69.30 | cum | 1974.69 | 136846.00 |
| Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 4 | Civil Works | ? | 126.00 | cum | 488.56 | 61559.00 |
| (5)Laying of CC Road at BC Colony, at Munipally (V) in Division No. 55:- Construction of Gravel sub-base by providing with 100% gravel, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 MORTH. |
| 5 | Civil Works | ? | 33.12 | cum | 310.07 | 10270.00 |
| Filling with gravel (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and tamping including cost and Cost and Conveyance of water to site and all operational, incidental, labour charges, sales and other taxes etc, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309) For Side berms |
| 6 | Civil Works | ? | 54.90 | cum | 6841.81 | 375615.00 |
| Construction of un-reinforced, plain cement concrete pavement, thickness as per design using 20mm metal 2/3 and 12mm metal 1/3 over a prepared sub base with 43 grade cement or any other type caluse 1501.2.2, M20 grade coarse and fine aggregate conforming to IS 383, maximum in a concrete mixer of not less than 0.20cum capacity and approriate weigh batcher using approved mix design, laid in approved fixed side form work (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as oer drawing), spreading the concrete with shovels, rakes, compacted using needle scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer sealant, dowel bar, near approaches, admixtures as approved, curing of concrete slabs for 14 days etc., complete. |
| 7 | Civil Works | ? | 39.60 | cum | 1974.69 | 78198.00 |
| Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 8 | Civil Works | ? | 96.00 | cum | 488.56 | 46902.00 |
| (4)Laying of CC Road Veternaty Hospital to End of the Road at Yellapur (V) in Division No. 55. :- Construction of Gravel sub-base by providing with 100% gravel, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 MORTH. |
| 9 | Civil Works | ? | 33.12 | cum | 310.07 | 10270.00 |
| Filling with gravel (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and tamping including cost and Cost and Conveyance of water to site and all operational, incidental, labour charges, sales and other taxes etc, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309) For Side berms |
| 10 | Civil Works | ? | 54.90 | cum | 6841.81 | 375615.00 |
| Construction of un-reinforced, plain cement concrete pavement, thickness as per design using 20mm metal 2/3 and 12mm metal 1/3 over a prepared sub base with 43 grade cement or any other type caluse 1501.2.2, M20 grade coarse and fine aggregate conforming to IS 383, maximum in a concrete mixer of not less than 0.20cum capacity and approriate weigh batcher using approved mix design, laid in approved fixed side form work (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as oer drawing), spreading the concrete with shovels, rakes, compacted using needle scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer sealant, dowel bar, near approaches, admixtures as approved, curing of concrete slabs for 14 days etc., complete. |
| 11 | Civil Works | ? | 39.60 | cum | 1974.69 | 78198.00 |
| Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 12 | Civil Works | ? | 96.00 | cum | 488.56 | 46902.00 |
| (3)Laying of CC Road from PACS Office to Hanuman Temple at Yellapur (V) in Division No. 55 :- Construction of Gravel sub-base by providing with 100% gravel, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 MORTH. |
| 13 | Civil Works | ? | 33.12 | cum | 310.07 | 10270.00 |
| Filling with gravel (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and tamping including cost and Cost and Conveyance of water to site and all operational, incidental, labour charges, sales and other taxes etc, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309) For Side berms |
| 14 | Civil Works | ? | 54.90 | cum | 6841.81 | 375615.00 |
| Construction of un-reinforced, plain cement concrete pavement, thickness as per design using 20mm metal 2/3 and 12mm metal 1/3 over a prepared sub base with 43 grade cement or any other type caluse 1501.2.2, M20 grade coarse and fine aggregate conforming to IS 383, maximum in a concrete mixer of not less than 0.20cum capacity and approriate weigh batcher using approved mix design, laid in approved fixed side form work (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as oer drawing), spreading the concrete with shovels, rakes, compacted using needle scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer sealant, dowel bar, near approaches, admixtures as approved, curing of concrete slabs for 14 days etc., complete. |
| 15 | Civil Works | ? | 39.60 | cum | 1974.69 | 78198.00 |
| Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 16 | Civil Works | ? | 96.00 | cum | 488.56 | 46902.00 |
| (2)Laying of CC Road from H. No. 53-2-49/1 to Pochamma Temple at Yellapur Village in Division No. 55 :- Construction of Gravel sub-base by providing with 100% gravel, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 MORTH. |
| 17 | Civil Works | ? | 75.90 | cum | 310.07 | 23534.00 |
| Filling with gravel (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and tamping including cost and Cost and Conveyance of water to site and all operational, incidental, labour charges, sales and other taxes etc, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309) For Side berms |
| 18 | Civil Works | ? | 154.69 | cum | 6841.81 | 1058360.00 |
| Construction of un-reinforced, plain cement concrete pavement, thickness as per design using 20mm metal 2/3 and 12mm metal 1/3 over a prepared sub base with 43 grade cement or any other type caluse 1501.2.2, M20 grade coarse and fine aggregate conforming to IS 383, maximum in a concrete mixer of not less than 0.20cum capacity and approriate weigh batcher using approved mix design, laid in approved fixed side form work (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as oer drawing), spreading the concrete with shovels, rakes, compacted using needle scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer sealant, dowel bar, near approaches, admixtures as approved, curing of concrete slabs for 14 days etc., complete. |
| 19 | Civil Works | ? | 104.50 | cum | 1974.69 | 206355.00 |
| Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 20 | Civil Works | ? | 220.00 | cum | 488.56 | 107483.00 |
| (1)Laying of CC Road from H. No. 53-2-65 to H. No. 53-2-40/2 at Yellapur Village in Division No. 55 :- Construction of Gravel sub-base by providing with 100% gravel, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 MORTH. |