Kerala State Electricity Board-KSEB has published Drawing 2 . 7 Km 11 Kv Ht Abc From Udhayathara To Kgn . Under Es , Pallimukku. Submission Date for this Tender is 09-03-2021. Electronic Circuit Design Tenders in Pallimukku Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 23-Feb-2021 | Date extension | Date | 09-03-2021 |
2 | 24-Feb-2021 | Format of Bounden Agreement | Other | 09-03-2021 |
Name of WorkDrawing 2.7 km 11kV ABC from Udayathara to KGN under Electrical Section, Pallimukku, ED Kollam. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Labour data key-702\nLoading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | 8 | No | |
2 | 2 | Labour data key-703\nLoading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle). | 4 | No | |
3 | 3 | Labour data key-726\nTransporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | 4 | Trip | |
4 | 4 | Labour data key-307\nRenewal of existing damaged 11kV 'A' pole with new 'A' pole in place and refitting of all items incl. conveyance (except pole). | 2 | No | |
5 | 5 | Labour data key-504\nDismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 2 | No | |
6 | 6 | Labour data key-554\nDismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 5 | No | |
7 | 7 | Labour data key-125\nInsertion of one HT 'A' type pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. | 2 | No | |
8 | 8 | Labour data key-186\nInsertion of one HT PSC pole in existing HT/LT line incl. digging & back filling pit, fitting cross arm, insulator, binding etc. | 9 | No | |
9 | 9 | Labour data key-119\nFitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | 9 | No | |
10 | 10 | Labour data key-120\nFitting and providing one Strut using HT PSC pole incl. digging & back filling pit. | 1 | No | |
11 | 11 | Labour data key-348\nStraightening one slanted 11kV Cut pole after lowering down the existing line and stringing the line after work. | 3 | No | |
12 | 12 | Labour data key-420\nTransferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | 10 | No | |
13 | 13 | Labour data key-128\nAdditional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | 4 | No | |
14 | 14 | Labour data key-127\nAdditional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 8 | No | |
15 | 15 | Labour data key-132\nAdditional rate for excavation of Pit for 'A' type pole in Hard Laterite. | 2 | No | |
16 | 16 | Labour data key-405\nAdditional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole. | 12 | No | |
17 | 17 | Labour data key-451\nDismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. | 35 | No | |
18 | 18 | Labour data key-452\nDismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. | 10 | No | |
19 | 19 | Labour data key-158\nProviding one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil. | 25 | No | |
20 | 20 | Labour data key-163\nProviding one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | 60 | No | |
21 | 21 | Labour data key-170\nFitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | 22 | No | |
22 | 22 | Labour data key-171\nFitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. | 3 | No | |
23 | 23 | Labour data key-167\nFitting one set AB switch and giving connection | 1 | No | |
24 | 24 | Labour data key-174\nFitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | 6 | No | |
25 | 25 | Labour data key-179\nFitting one additional HT pin with insulator | 5 | No | |
26 | 26 | Labour data key-1001\nStringing of 11 kV Ariel bunched cable XLPE insulated of size 3 x 150+ 1 x 120 sqmm with bare/insulated Messenger | 2700 | Mtr | |
27 | 27 | Labour data key-1007\nErection of Anchor clamp / dead end clamp of 11 KV ABC suitable for 70 to 120 sqmm bare/insulated Messenger | 60 | Nos. | |
28 | 28 | Labour data key-1008\nErection of suspension clamp of 11KV ABC suitable for 70 to 120 sq mm bare/insulated messenger | 100 | Nos. | |
29 | 29 | Labour data key-1013\nErection of Stainless Steel Strap and Buckles | 300 | Nos | |
30 | 30 | Labour data key-1035\n11 KV AB Cable T- joint instalation for 3 Core | 20 | Nos | |
31 | 31 | Labour data key-1037\n11 KV AB Cable Termination instalation for 3 Core | 40 | Nos | |
32 | 32 | Labour data key-1038\nSurge Arrestors for ABC | 40 | Nos | |
33 | 33 | Labour data key-1014\nProviding Cable Tie | 300 | Nos | |
34 | 34 | Labour data key-1033\nT- Connector | 100 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail