Construction Of Affordable Housing Project 3234 Ews-A Type Dwelling Units In Sector 12 Of Pcntda
Tender Overview
Project Description
Construction Of Affordable Housing Project 3234 Ews-A Type Dwelling Units In Sector 12 Of Pcntda
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-Feb-2021 | CSC/CSD DRAWINGS PDF ROAD | Other | 24-Feb-2021 |
| 2 | 11-Feb-2021 | CSC/CSD DRAWINGS PLUMBING PDF | Other | 24-Feb-2021 |
| 3 | 17-Feb-2021 | Common set of deviations(CSD) No.2 as Addendum | Technical Bid | 24-Feb-2021 |
| 4 | 18-Feb-2021 | COMMON SET OF DEVIATIONS (CSD) NO. 3 AS ADDENDUM | Technical Bid | 24-Feb-2021 |
| 5 | 22-Feb-2021 | Cpmmon set of Clarifications (CSC) No.2 | Other | 24-Feb-2021 |
BOQ
| Name of Work: Project 3:- Construction Of Affordable Housing Project 3234 EWS-A Type Dwelling Units In Sector 12 Of PCNTDA | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | SUB ESTIMATE I,II,III,IV,VII\nNotes on e financial Bidding for Measureable sub estimates : - \nThe bidder shall decide percentage +X on the total amount for measureable sub estimates, in the item rate BOQ he should enter 1+X%. \nThe bidder shall decide percentage -X on the total amount for measureable sub estimates, in the item rate BOQ he should enter 1-X%. \nFor example - If X is +9%, the rate in BOQ = 1+9/100 = 1.09\nIf X is -9%, the rate in BOQ = 1-9/100 = 0.91 | 1.11513e+09 | INR | |
| 2 | 2 | SUB ESTIMATE V, VI\nNote : - \n1) The Bidders will be reimbursed royalty amount after production of receipt showing amount deposited with government\n2) The Contract Will Carry Out Tests As Per Frequency Mentioned In The Specifications And Quality Control Manual. In The Site Laboratory Set As Per Provisions Of The Agreement. However 10% Of The Tests Shall Be Carried Out By 3rd Party Institute Like PWD/COEP/GPP/NABL Lab. Charges Of This 3rd Party Testing Only Will Be Reimbursed On Submission of Proof Of Payment\n3) The Bidder shall quote project cost without GST. Employer will reimburse GST in every R.A. bill and final bill at then prevailing GST rates applicable from time to time .\n4) The bidder shall note that the cost of constructing one refuse area / building (42 nos. for project) as shown in the drawing (as per NBC 2016) is incidental to work. Employer will not consider any payment against this work. \n5) Payment agains the dwelling units shall be made as per payment breakdown schedule enclosed in Volume II | 3234 | No. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents