Shipping Boards / Undertakings / PSU Closing in 0 days TDR #26726989

Electrical Works At Various Location On Mfv Matsya Drushti

Issued by Boards / Undertakings / PSU · HSL Visakhapatnam, Andhra Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
01 Feb 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
HSL Visakhapatnam → Andhra Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Electrical Works At Various Location On Mfv Matsya Drushti , To Undertake Complete Electrical Works As Per The Following Sow And Annexure-A To The Satisfaction Of Hsl & Shipstaff . ( Job Nos . 702/737 , 704/705 , 710/735 , 723 , 712/713/714 , 716/733/736 , 720/721 , 724/738 & 711 ) , Port Side Freezer Room Manlock Alarm Not Working To Be Made Operational Along With 07Nos . Man Trap Alarms . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 1 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 1 . 1 ) Against Third Party/Oem Invoice . , Two Way Communication From Anchor Station To Wheel House Not Working To Be Replaced With New Storage Box / Mk Station Along With Checking Of Cables And To Made Operational . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 2 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 2 . 1 ) Against Third Party/Oem Invoice . , Automative Telephone ( Intercom ) 10Nos . Not Working To Be Repaired / Renewed And Connected Telephone Exchange To Be Checked / Repaired . Intercom System & Battery Telephone System To Be Made Operational . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 3 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 3 . 1 ) Against Third Party/Oem Invoice . , Main Engine , Auxiliary Engine , Gear Box Alarms Are To Be Checked Along With System Alarm Panel Along With Checking Of Safety Cut-Outs . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 4 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 4 . 1 ) Against Third Party/Oem Invoice . , Pa System Is To Be Serviced & 12Nos . Speakers Are To Be Checked / Renewed Along With Any Defective Cabling . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 5 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 5 . 1 ) Against Third Party/Oem Invoice . , Fire Alarm Panel Malfunction To Be Rectified Along With Checking Of All Smoke Detectors , Manual Call Points And Heat Detectors . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 6 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 6 . 1 ) Against Third Party/Oem Invoice . , Navigation Panel Obsolete Relays To Be Renewed Along With Nreneal Of Corroded Lights . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 7 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 7 . 1 ) Against Third Party/Oem Invoice . , All Bilge Alarms To Be Checked / Proved . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 8 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 8 . 1 ) Against Third Party/Oem Invoice . , All The Panel In Bridge Are To Be Serviced . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 9 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 9 . 1 ) Against Third Party/Oem Invoice .

BOQ

Name / Description: Electrical works at various locations on MFV Matsya Drushti
Sl.No.Item DescriptionJob NosQtyUnits
11To undertake complete Electrical works as per the following SoW and Annexure-A to the satisfaction of HSL & ShipStaff. (Job Nos. 702/737, 704/705, 710/735, 723, 712/713/714, 716/733/736, 720/721, 724/738 & 711)
21.01Port side freezer room manlock alarm not working to be made operational along with 07Nos. man trap alarms.1LS
31.02Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for materilas/spares/consumables for above entire Sow(Sl.No.1)\nThe taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered \" on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (1.1) against third party/OEM invoice.1LS
42Two way communication from anchor station to wheel house not working to be replaced with new storage box / MK station along with checking of cables and to made operational.1LS
52.1Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for materilas/spares/consumables for above entire Sow(Sl.No.2)\nThe taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered \" on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (2.1) against third party/OEM invoice.1LS
63Automative telephone (Intercom) 10Nos. Not working to be repaired / renewed and connected telephone exchange to be checked / repaired. Intercom system & battery telephone system to be made operational.1LS
73.1Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for materilas/spares/consumables for above entire Sow(Sl.No.3)\nThe taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered \" on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (3.1) against third party/OEM invoice.1LS
84Main engine, auxiliary engine, gear box alarms are to be checked along with system alarm panel along with checking of safety cut-outs.1LS
94.1Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for materilas/spares/consumables for above entire Sow(Sl.No.4)\nThe taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered \" on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (4.1) against third party/OEM invoice.1LS
105PA System is to be serviced & 12Nos. Speakers are to be checked / renewed along with any defective cabling.1LS
115.1Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for materilas/spares/consumables for above entire Sow(Sl.No.5)\nThe taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered \" on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (5.1) against third party/OEM invoice.1LS
126Fire alarm panel malfunction to be rectified along with checking of all smoke detectors, manual call points and heat detectors.1LS
136.1Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for materilas/spares/consumables for above entire Sow(Sl.No.6)\nThe taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered \" on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (6.1) against third party/OEM invoice.1LS
147Navigation panel obsolete relays to be renewed along with nreneal of corroded lights.1LS
157.1Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for materilas/spares/consumables for above entire Sow(Sl.No.7)\nThe taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered \" on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (7.1) against third party/OEM invoice.1LS
168All bilge alarms to be checked / proved.1LS
178.1Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for materilas/spares/consumables for above entire Sow(Sl.No.8)\nThe taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered \" on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (8.1) against third party/OEM invoice.1LS
189All the panel in bridge are to be serviced.1LS
199.1Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for materilas/spares/consumables for above entire Sow(Sl.No.9)\nThe taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered \" on not exceeding basis of total lumpsum cost mentioned in the BOQ'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (9.1) against third party/OEM invoice.1LS

AI Tender Summary

OUR REF NO 26726989
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 01-02-2021
Authority
Authority Name Hindustan Shipyard Limited
Work Description Electrical Works At Various Location On Mfv Matsya Drushti , To Undertake Complete Electrical Works As Per The Following Sow And Annexure-A To The Satisfaction Of Hsl & Shipstaff . ( Job Nos . 702/737 , 704/705 , 710/735 , 723 , 712/713/714 , 716/733/736 , 720/721 , 724/738 & 711 ) , Port Side Freezer Room Manlock Alarm Not Working To Be Made Operational Along With 07Nos . Man Trap Alarms . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 1 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 1 . 1 ) Against Third Party/Oem Invoice . , Two Way Communication From Anchor Station To Wheel House Not Working To Be Replaced With New Storage Box / Mk Station Along With Checking Of Cables And To Made Operational . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 2 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 2 . 1 ) Against Third Party/Oem Invoice . , Automative Telephone ( Intercom ) 10Nos . Not Working To Be Repaired / Renewed And Connected Telephone Exchange To Be Checked / Repaired . Intercom System & Battery Telephone System To Be Made Operational . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 3 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 3 . 1 ) Against Third Party/Oem Invoice . , Main Engine , Auxiliary Engine , Gear Box Alarms Are To Be Checked Along With System Alarm Panel Along With Checking Of Safety Cut-Outs . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 4 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 4 . 1 ) Against Third Party/Oem Invoice . , Pa System Is To Be Serviced & 12Nos . Speakers Are To Be Checked / Renewed Along With Any Defective Cabling . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 5 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 5 . 1 ) Against Third Party/Oem Invoice . , Fire Alarm Panel Malfunction To Be Rectified Along With Checking Of All Smoke Detectors , Manual Call Points And Heat Detectors . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 6 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 6 . 1 ) Against Third Party/Oem Invoice . , Navigation Panel Obsolete Relays To Be Renewed Along With Nreneal Of Corroded Lights . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 7 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 7 . 1 ) Against Third Party/Oem Invoice . , All Bilge Alarms To Be Checked / Proved . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 8 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 8 . 1 ) Against Third Party/Oem Invoice . , All The Panel In Bridge Are To Be Serviced . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 9 ) The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 9 . 1 ) Against Third Party/Oem Invoice .
Basic Detail
Tender No 20/20010/085/2020-21
Bidding Type Tender
Location
City HSL Visakhapatnam
State Andhra Pradesh
Key Dates
Publish Date 25 Jan 2021
Submission Date 01 Feb 2021
Open Date 01 Feb 2021
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
Tendernotice_1.pdf
CQ_GTC_GSTCompliance_CL085.pdf
F43D57DC-2DF2-4C24-84E4-3E097D0E503A.html
AnnexureA085.pdf
BOQ_94124.xls
TBID085.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 25, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Feb 01, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 01, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

pdf

CQ_GTC_GSTCompliance_CL085.pdf

html

F43D57DC-2DF2-4C24-84E4-3E097D0E503A.html

pdf

AnnexureA085.pdf

xls

BOQ_94124.xls

pdf

TBID085.pdf

TenderDetail
Loading tenders