Fertilisers And Chemicals Travancore Limited has published Repair Or Replacement Of Corroded Pipelines In Main Tank Farm And Lactam Plant Areas In Petro Plants Uc . . Submission Date for this Tender is 04-02-2021. Pipe Laying Tenders in FACT UDYOGAMANDAL Kerala. Bidders can get complete Tender details and download the document.
Name of Work: Repair/Replacement of corroded pipelines in MAIN TANK FARM & LACTAM Plant areas in Petro Plants-UC. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | MECHANICAL WORK IN MAIN TANK FARM & LACTAM Plant areas in PETRO PLANTS-UC | |||
2 | 1.01 | Fabrication & welding of pipelines (CS/GI)having different thickness for repair/replacement of damaged pipelines/ installing new lines/modification along with valves and fittings / re-routing of various pipelines, etc. in Petro Plants - sizes of pipes vary from 10 NB up to and including 50 NB at all elevations and all locations. | item1 | 1400 | Inch Dia |
3 | 1.02 | Fabrication & welding of pipelines (CS/GI) having different thickness for repair/replacement of damaged pipelines / installing new lines / modification along with valves and fittings / re-routing of various pipelines, etc. in Petro Plants - sizes of pipes vary from 65 NB and up to and including 350NB at all elevations and all locations. | item2 | 600 | Inch Dia |
4 | 1.03 | Erection of the fabricated pipelines (Items No.1 & 2 above) with necessary fittings like valves, flanges, etc. and with proper structural supports & clamping, after dismantling the existing old pipelines, wherever necessary. Providing guides& shoes and welding of pads also shall be done as per requirement. (The rate is inclusive of steel structural work) | item3 | 1100 | Inch Meter |
5 | 1.04 | Applying one coat of primer, after thorough cleaning by mechanical means, using Epoxy primer of FACT approved brand & quality, at all elevations. This includes cost of all consumables, tools & materials, labour, and scaffoldings etc. as per the departmental instructions. | item4 | 220 | M2 |
6 | 1.05 | Applying one coat of finish paint, after thorough cleaning, using Epoxy finish paint of FACT approved brand & quality, at all elevations(over the priming coat specified in schedule-4 above).This includes cost of all consumables, tools &materials, labour, scaffoldings etc. complete, as per the departmental instructions. (colour will be specified at time of execution of work). | item5 | 220 | M2 |