Address
Project Description
Construction Of Basket Ball Court At Ppa Phillaur .
BOQ
| NAME OF WORK : CONSTRUCTION OF BASKET BALL COURT AT PPA PHILLAUR. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Supply and Installation of One Synthetic Basket Ball Court of size 32m x 19 m which include the following items as per given specification. | |||
| 2 | 2 | PROVIDING AND LAYING SYNTHETIC (ACRYLIC) SURFACE | |||
| 3 | 3 | Providing One layer of resurfacer, five layers of cushion & three layer of color and court markings as per Standard and quality. The Surface are 100% acrylic and UV resistant, cushioned courts are designed to provide maximum comfort for players. | 6542 | Sft | |
| 4 | 4 | PROVIDING AND FIXING ASPHALT BASE SURFACE FOR OUTDOOR BASKET BALL COURT | |||
| 5 | 5 | Synthetic surface is laid over an Asphalt base which is prepared as per the specifications given below: | 6542 | Sft | |
| 6 | 6 | Base Surface - A typical asphalt base consists of a 8\" pavement over different layers as detailed below. | |||
| 7 | 7 | Excavation to a depth between 3\" to 6\" to remove all weeds and grass from its roots, create a slope of 1\" in every 10' in the sub base on the shorter axis (without any grass or weeds). Extreme care would need to be taken to ensure a correct slope of 1\" in every 10'. | |||
| 8 | 8 | Compaction of the sub base will be by 8-10 ton roller. | |||
| 9 | 9 | Carry out anti termite and weedicide on the total area by making 9\" deep holes spaced 12\" apart and injecting the Chemicals and also spraying. | |||
| 10 | 10 | Lay a Ist layer of 3\" compacted water bound mecadam with stone size of 55 mm -65 mm . Well graded WBM to be densely compacted by keying and interlocking the stone to ensure that no settlement takes place | |||
| 11 | 11 | Laying a second layer of 3\" compacted water bound mecadam with stone size of 22 mm -53 mm . Well graded WBM to be densely compacted by keying and interlocking the stone to ensure that no settlement takes place | |||
| 12 | 12 | Laying a 30mm compacted thick Hot mix BM course with 12 mm to 20 mm chips well graded up to 10 mm and stone dust . Use bitumen 80/100 graded 1.5 to 2 % by Wt. of the Mix. Compact preferably with 8-10 tonnes road roller . Use 0.4 Kg/M2 of hot bitumen as tack coat before laying Hot Mix. | |||
| 13 | 13 | Laying a 20mm compacted thick Hot mix AC course with 6 mm stone chips well graded up to 2 mm size & stone dust and finally powdered lime. | |||
| 14 | 14 | Use Bitumen 80/100 grade 2 to 2.5% by wt. for the Hot Mix use 0.25 kg/sqm for Tack coat, Seal coat with stone dust. | |||
| 15 | 15 | Spreading manually Grit powder on the finished surface. | |||
| 16 | 16 | Seal coat with stone dust. | |||
| 17 | 17 | BASKET BALL ACCESSORIES – One set | |||
| 18 | 18 | Providing & fixing 8” Round pipe 5.2mm (W.T) with 3.2 meter distance from the board. Plus 25mm back board transparent Acrylic with International Standard die made frame coated die made frame with built in brackets for mounting. Plus Dunking Rim with three Spring Mechanism. | 1 | Per Set | |
| 19 | 19 | PROVIDING WATER REMOVING ROLLER : As per specification given below:- | |||
| 20 | 20 | Supply of seamed polyurethane foam roller, light weight all aluminium width 36\". Imported from USA which will be required for removing rain or washing water from the synthetic (Acrylic) surfaced Courts. | 1 | Each | |
| 21 | 21 | EDGE WALL : Construction of Edge Wall consisting of 1' high brick wall ( 6 inches below and above the ground) and all visible surface plastered and painted with snowcem in colour of user choice. | 335 | Rft | |
| 22 | 22 | DRAIN : Construction of drain as per darwing. | 2 | Each |
AI Tender Summary
Tender Timeline
Jan 19, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 03, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 04, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender