Department Of Irrigation-DOI has published Re-Construction Of D . R . Bridge At Rd 23822 Of Jln Feeder . . Submission Date for this Tender is 25-01-2021. Bridge Work Tenders in Rohtak Haryana. Bidders can get complete Tender details and download the document.
Name of Work: Re-construction of D.R Bridge at RD 23822 of JLN Feeder. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Dismentalling of RCC work HSR Item No. 8.6 (e) & note | 153.5 | Cum | |
2 | 2 | Dismentling of Concrete work HSR Item No. 8.6 (d) | 184.29 | Cum | |
3 | 3 | Dismentling of Brick Work HSR Item No. 8.5 (b) & note | 716.53 | Cum | |
4 | 4 | Earthwork excavation for foundation as per pit with in combined lead upto 75 Mtr. HSR Item No. 6.2 (b) & c (ii) | 3297.67 | 100 Cum | |
5 | 5 | Preparation of subgrade for laying concrete on surface HSR Item No. 10.122 | 14564.6 | Sqm. | |
6 | 6 | Design Mix concrete of grade M-15 with minimum cement concrete 240kg. / cum HSR Item No. 10.64 | 838.2 | Cum | |
7 | 7 | Design Mix concrete of grade M-20 with minimum cement concrete 300kg. / cum for main slabe HSR Ittem No. 10.65 | 256.21 | Cum | |
8 | 8 | Design Mix concrete of grade M-25 with minimum cement concrete of 330 kg. / cum HSR Item No. 10.66 | 1019.62 | Cum | |
9 | 9 | Shuttering for faces of concrete works HSR No. 9.13 & Note | 483.24 | Sqm. | |
10 | 10 | Centering & shuttering for main slab HSR Item No. 9.18 (b) | 413.74 | Sqm. | |
11 | 11 | Centering & shuttering for wall HSR Item No. 9.5 \n | 887.88 | Sqm. | |
12 | 12 | Brick Masonary 1:3 in foundation & plinth HSR Item No. 11.5 | 392.93 | Cum | |
13 | 13 | Brick Masonary 1:3 in super structure HSR Item No. 11.10 | 62.26 | Cum | |
14 | 14 | Reinforcement steel yield strength deformed bars grade FC-500 conformining to B.I.S Code HSR Item No. 18.22 | 1304.02 | Qtl. | |
15 | 15 | Local sand filling behind abutment & wing walls with in lead upto 495 mtr lead HSR Item No. 6.2 (b), (c) (ii), (iii), 6.3 (i) & 14.83 | 333.93 | Cum | |
16 | 16 | Rehandling of earthwork for filling with in lead upto 60 Mtr. HSR Item No. 6.2 (b), 6.2 (i) & note | 1918.19 | 100 Cum | |
17 | 17 | Extra for puddling of earthwork as per specification HSR Item No. 6.2 (f) | 1319.07 | 100 Cum | |
18 | 18 | Relining in bed as per specification complete in all respect Design Mix M-15 | 501.86 | Sqm. | |
19 | 19 | Relining in side slope as per specification | 338.59 | Sqm. | |
20 | 20 | Providing & fixing premoulding bitumen joint filling for expension joint 25 mm I/C cost of ceiling compound & primer coat HSR Item No. 24.35 (ii) | 4674.41 | Mtr./Cm/Depth | |
21 | 21 | Providing & fixing rain water pipe of 3" dia pipe iron L.S. 50/- per Mtr. | 7.25 | Mtr. | |
22 | 22 | Dry Brick on edge paving sand grouted over 50 MM th. Earth plaster as per HSR Item No. 14.20 | 11816.9 | Sqm. | |
23 | 23 | First Class Brick Work in Mud Mortaer as per HSR Item No. 11.35 | 11.3 | Cum | |
24 | 24 | Painting two coat as per HSR Item No. 16.26 | 250.75 | Sqm. | |
25 | 25 | Credit of Brick bats | 716.53 | Cum | |
26 | 26 | Credit of old and used steel of slab | 136.62 | Qtl. |