Kerala Water Authority-KWA has published Jjm 2020 21 Setting Up Upgradation Operation Of Laboratories For Wqms Procurement Of 9 Nos Fume Hood And Erection Of Motor And Duct Pipes For Various Quality Control Laboratories Of Kerala Water Authority. Submission Date for this Tender is 27-01-2021. Storage Chests and Cabinets and Trunks Tenders in Nettoor Kerala. Bidders can get complete Tender details and download the document.
Name of Work : JJM-2020-21-JJM-2020-21-Setting up / Up-gradation /Operation of Laboratories for WQM&S-Procurement of 9 nos. Fume hood and erection of motor and duct pipesfor various Quality Control Laboratories of Kerala Water Authority. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | JJM-2020-21-JJM-2020-21-Setting up / Up-gradation /Operation of Laboratories for WQM&S-Procurement of 9 nos. Fume hood and erection of motor and duct pipesfor various Quality Control Laboratories of Kerala Water Authority | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Supply of Fume hood and erection of motor and duct pipes with the following specifications\n\nHood of size L = 1200mm,D = 940 mm, H= 2300 mm or more fabricated with 1 mm GI sheet powder coated body, with a working table of size 1200x600x900mm minimum and bottom stand provided with cupboard and drawers. \nThe inner surface to be covered with 3 mm thick heat resistant acid proof, corrosion resistant material vinyl/FRP. \nThe working table to be covered with acid proof granite slab of thickness 20 mm provided with water tap and poly propylene sink.\nThe equipment shall be provided with acid proof fittings, gas/air cock, additional power points, and diffused fluorescent tube.\nThe exhaust system to be consisted of dynamically balanced epoxy PP/ FRP coated impeller coupled with suitable TEFC industrial/Crompton make or equivalent minimum 1 HP motor with motor cover fitted outside the fume hood, so as to avoid sound and improve suction. \nSuction should be from the bottom of the fume hood .\nThe duct to be provided with 200/300 mm Dia Poly propylene/FRP pipe and provided with rain hood.\nThe face velocity shall be 0.5m/s to 0.75m/s. \nThe front glass shutter to be provided with auto lifting door having opening height min 0.75 m. \nPower Supply 415 V, 50Hz.\nCE/ISO Certificate to be Provided.\nIQ,OQ and PQ documents to be submitted. \nHard Copy of instrument manual with specification details to be submitted.\nWarranty 3 year for the entire unit. \nErection\nErection of fume hood and pump as per direction of departmental officers in respective labs. Erection of exhaust duct pipes as per above specifications which shall be extended upto the top storey of the building ensuring occupational safety and health\n | BI01010001010000000000000515BI0100001113 | 9 | No |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail