Kerala State Electricity Board-KSEB has published Pole Erection And Stantadization Of 11Kv Line Pole Erection And Standarization For Converting 11Kv Oh Portionof Kel Feeder To Abc In Ksd Section Area. Submission Date for this Tender is 29-01-2021. Feeder Pillar Tenders in vidyanager,chettumkuzhy,parakkata Kerala. Bidders can get complete Tender details and download the document.
Name of Work: POLE ERECTION AND STANDARIZATION FOR CONVERTING 11KV OH PORTIONOF KEL FEEDER TO ABC IN KSD SECTION AREA | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Fitting and erecting one HT PSC Pole inposition incl. fitting cross arm, digging andback filling pit, drawing earth leads. | 8 | NOS | |
2 | 2 | Fitting and erecting one HT 'A' type Pole inposition incl. fitting cross arm, digging andback filling pit, drawing earth leads. | 8 | NOS | |
3 | 3 | Fitting and erecting one HT DP using 'A'type pole in position incl. fitting 2 channelcross arms, digging and back filling pit,drawing earth leads | 8 | NOS | |
4 | 4 | Fitting and providing one HT Stay for 11kVpole incl. digging and back filling pit. | 110 | NOS | |
5 | 5 | Fitting and providing one Strut using HTPSC pole incl. digging and back filling pit | 4 | NOS | |
6 | 6 | Insertion of one HT PSC pole in existingline incl. digging and backfilling pit, fittingcross arm, insulators, binding etc | 36 | NOS | |
7 | 7 | Insertion of one HT 'A' type pole in existingline incl. digging and backfilling pit, fittingcross arm, insulators, binding etc. | 54 | NOS | |
8 | 8 | Additional rate for excavation of one Pit forHT Pole/HT Stay in Hard Laterite. | 108 | NOS | |
9 | 9 | Additional rate for excavation of one Pit forHT Pole/HT Stay in Soft Rock. | 50 | NOS | |
10 | 10 | Additional rate for excavation of Pit for 'A'type pole in Hard Laterite. | 42 | NOS | |
11 | 11 | Additional rate for excavation of Pit for 'A'type pole in Soft Rock. | 30 | NOS | |
12 | 12 | Stringing of one km 11kV line with ACSRRaccoon (3 conductors) incl. cutting andremoving tree branches wherever necessary | 1.9 | KM | |
13 | 13 | Providing one Earth using earth pipe incl.digging separate pit at standard distanceaway from the pole/structure andbackfilling. | 12 | NOS | |
14 | 14 | Additional rate for excavation of one EarthPit (2.5m depth) in Hard Laterite | 12 | NOS | |
15 | 15 | Providing one Coil Earth using GI earthwire, digging separate pit at standarddistance away from the pole/structure andbackfilling | 10 | NOS | |
16 | 16 | Fitting one set (3No.) 11kV LA and givingconnections excluding earthing. | 6 | NOS | |
17 | 17 | Fitting one set AB switch, giving connectionand earthing the same using one earth pipeincl. digging and back filling pit. | 7 | NOS | |
18 | 18 | Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single poleincl. conveyance of materials. | 14 | NOS | |
19 | 19 | Fitting one Additional 3m Channel crossarm (75x40x6mm), in existing 11kV DPincl. conveyance of materials. | 16 | NOS | |
20 | 20 | Replacing/inserting HT Stay insulator on theexisting stay | 110 | NOS | |
21 | 21 | Reconductoring one km 11kV old line of 3conductors with new ACSR Raccoon incl.cutting of tree branches and conveyance. | 1.9 | km | |
22 | 22 | Drilling hole of various sizes on existingChannel/Cross Arm. | 120 | NOS | |
23 | 23 | Drilling oval shaped hole of various sizes onexisting Channel/Cross Arm/GI/MS cleatetc. | 30 | NOS | |
24 | 24 | Cutting Channel/Cross Arm/Angle Iron intotwo pieces. | 10 | NOS | |
25 | 25 | Transferring LT Sph 2/3 wire OH line tonewly erected HT/LT pole and refitting allitems to the new pole. | 15 | NOS | |
26 | 26 | Transferring LT 3ph 4/5 wire OH line tonewly erected HT/LT pole and refitting allitems to the new pole. | 47 | NOS | |
27 | 27 | Dismantling and reconnecting Sph serviceconnection from the OH line incl. loweringdown the WP portion | 40 | NOS | |
28 | 28 | Dismantling and reconnecting 3ph serviceconnection from the OH line incl. loweringdown the WP portion | 10 | NOS | |
29 | 29 | Dismantling (without damage) one No.11kV TW/RSJ/Rail pole after disconnectingstays, strut etc. and stacking the same. | 7 | NOS | |
30 | 30 | Dismantling one damaged 11kV PSC/RCCpole after disconnecting stays, strut etc. andstacking the same | 30 | NOS | |
31 | 31 | Dismantling (without damage) one 11kVPSC/RCC pole after disconnecting stays,strut etc. and stacking the same. | 10 | NOS | |
32 | 32 | Dismantling (without damage) one km11kV line (3 conductors), cross arm,insulators, disc, rolling the conductor andstacking. | 3.8 | km | |
33 | 33 | Dismantling (without damage) one ABswitch from existing structure and bringingback to section store. | 1 | NOS | |
34 | 34 | Dismantling one damaged LT TW/RSJ/Railpole after disconnecting stays, strut etc. andstacking the same. | 4 | NOS | |
35 | 35 | Dismantling one damaged LT PSC/RCCpole after disconnecting stays, strut etc. andstacking the same. | 10 | NOS | |
36 | 36 | Dismantling (without damage) one LTPSC/RCC pole after disconnecting stays,strut etc. and stacking the same. | 5 | NOS | |
37 | 37 | Dismantling (without damage) one LTPSC/RCC Strut pole incl. removal of clampsand stacking. | 1 | NOS | |
38 | 38 | Dismantling one ordinary streetlight/CFL/LED fitting from existing poleand refitting the same on newly erected poleand reconnecting | 18 | NOS | |
39 | 39 | Loading HT PSC pole from the stackingplace and unloading the same at work site(transport by vehicle). | 48 | NOS | |
40 | 40 | Loading HT 'A' type pole from the stackingplace and unloading the same at work site(transport by vehicle) | 78 | NOS | |
41 | 41 | Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4 polesexcluding loading & unloading. | 32 | Trip | |
42 | 42 | Providing concrete muffing(0.45x0.45x1.5m) inclusive of cost of allmaterial (as per specification). | 78 | NOS |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail