Repairing/Maintenance Of 9X40 M . Covered Apf , Office Bulding , Boundary Wall Etc At Smy Laherpur . , SMY Laherpur.-Uttar Pradesh

Rajya Krishi Utpadan Mandi Parishad has published Repairing/Maintenance Of 9X40 M . Covered Apf , Office Bulding , Boundary Wall Etc At Smy Laherpur . . Submission Date for this Tender is 28-01-2021. Wall construction Tenders in SMY Laherpur. Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

26610895
Repairing/Maintenance Of 9X40 M . Covered Apf , Office Bulding , Boundary Wall Etc At Smy Laherpur .
Open Tender
Indian
Uttar Pradesh
SMY Laherpur.
28-01-2021

Tender Details

Repairing/Maintenance Of 9X40 M . Covered Apf , Office Bulding , Boundary Wall Etc At Smy Laherpur .

Key Value

Document Fees
INR 590 /-
EMD
INR 100000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Repairing/Maintenance of 9x40 M. covered APF, Office bulding, boundary wall etc at SMY Laherpur.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 (SI No. 641+642)Painting Ist coat \nover Priming coat(but including cost \nof Priming coat)on steel and other \nMetal surfaces up to 10cm. Two Coat \nwidth or girth or smallarticles Not \nexceeding 0.10Sqm. in area white \nsuperior synthetic enamelsuch as \nLUXOL-3, Hi-Glass apcolite superlac,\nDULUX Specified brushing to give an \neven shade and including cleaning the\nsurface of all dirt, dustand other\nforeign matter sand papering and \nstoping including cost of all \nmaterials, labour T&P etc. required \nfor proper completionof the work.\n BI01010001010000000000000515BI0100001113 670.57 Sqm
2 2 Providing corrugated G.S. \nsheet roofing including \nvertical / curved surface \nfixed with polymer coated \nJ or L hooks, bolts and nuts \n8 mm diameter with bitumen \nand G.I limpet washers or \nwith G.I. limpet washers filled \nwith white lead, including a \ncoat of approved steel primer \nand two coats of approved \npaint on overlapping of sheets \ncomplete (up to any pitch in \nhorizontal/vertical or curved \nsurfaces), excluding the cost \nof purlins, rafters and trusses \nand including cutting to size \nand shape wherever required. \n1.00mm thickwith zinc coating \nnot less than 275 gm/m²\n BI01010001010000000000000515BI0100001114 240 sqm
3 3 S/F fixing of 6mm thick A.C. sheets \nroofing in position including supply \nof all materials, labour, T&P etc. \ncompletion of the work.\n BI01010001010000000000000515BI0100001115 52.8 sqm
4 4 S/F of A.C. Ridge valley and gutter. \nincluding supply of all materials \nlabour T&P etc required for proper \ncompletion of work.\n BI01010001010000000000000515BI0100001116 5 Rm.
5 5 284 R.C.C work with cement apporved \ncoarse sand and 2 cm (3/4") gauge \napporved stone ballast in the \nproportion of 1:2:4 in SLAB of\ndoor and window,excluding supply of\nreinforcement and its binding but \nincluding its fixiing and binding the\nsame with 24 B.W.G.G.I,binding wire\nand including supply of all material\nlabour and T&P etc. requires for\nproper completion of work strenght \nof the concrete shall not be less \nthan M-15 \n .\n BI01010001010000000000000515BI0100001117 4.06 cum.
6 6 504 Mild steel or Iron in plain work \nsuch as reinforced concrete or \nreinforced brick work (included \nin an over all rates) wrought to \nrequired shape as necessary and\nwastage, over lapping and hooks \nproper completion work. \n BI01010001010000000000000515BI0100001118 3.26 Qtl
7 7 "14.New item DSR NO.-11.46.1 \nProviding and laying Vitrifide tiles\nin floor of 500 x 500 mm sizes\n(thickness 10mm), with water \nabsorption less than 0.08% and\nconforming to IS : 15622, of approved\nbrand & manufacturer, in desired\ncolours and shades laid with\ncementbased high polymer modified \nquick set tile adhesive (water based)\nconforming to IS: 15477, including \ngrouting of joints. P.W.D Spec.11.46.1\n BI01010001010000000000000515BI0100001119 106.1 sqm
8 8 "11.New N.B.O. 11.22 P/L integral \ncement based waterproofing treatment\nBRICK KOBA including preparation\nof surface as required for treatment\nof roofs, consisting of following \noperations: a)Applying a slurry coat\nof neat cement admixed with water\nproofing compound confirming to IS.\n2645including adjoining walls upto \n300 mm height. b) Laying brick bats \nwithmortar with 50% of cement mortar\n1:5(1 cement :5 coarse sand) admixed\nwith water proofing compound \nconfirming to IS: 2645 over 20mm \nthicklayer of cement mortar of mix \n1:5 (1cement :5 coarse sand)admixed \nwithwater proofing compound \nconfirming to IS: 2645 to required\nslopeincluding rounding of junction\nof walls and slabs c)After two days\nof proper curing applying a second \ncoat of cement slurry using 2.75\nkg/sqm of cementadmixed with water \nproofing compound confirming to IS:\n2645.d)Finishing the surface with\n20 mm thick jointless cementy mortar\nof mix1:4(1 cement : 4 coarse sand)\nadmixed with water proofing compound\nconfirming to IS: 2645 including \nlaying glass fiber cloth of approved\nquality in top layer of plaster and\nfinally finishing the surface with \ntrowel with neat cement slurry and \nmaking pattern of 300x300mm square \n3mm deep. e) The whole terrace so\nfinished shall be flooded with\nwaterfor a minimum period of two \nweeks for curing and for final be \nfloodedwith water for a minimum \nperiod f two weeks for curing and \nfor finaltest.With average thickness\nof 120mm and minimum thickness at \nkhurra as 65 mm. "\n\n BI01010001010000000000000515BI0100001120 272.5 sqm
9 9 Dismantling of exiting plaster \nincluding disposal of refuse \nmaterials as directed E/I with \nin a distance of 60m. SI No. 706\n BI01010001010000000000000515BI0100001121 24.22 sqm
10 10 628 Supply And Fixing 6mm (1/4") thick \nchina white glazed tiles inflooring \nor dado laid with 1:3 cement and \napproved coarse sand mortar finished\nwith whitecement slurry jointing and\npolishing completeincluding supply\nof all materials labour and T&P etc, \nrequired for proper completion of \nthe work.\n BI01010001010000000000000515BI0100001122 32.3 sqm
11 11 12 mm thick plaster with cement \napproved coarse sand in 1:4 including\nsupply of all material, labour &T&P \netc required for completion of the\nwork.\n BI01010001010000000000000515BI0100001123 25.17 sqm
12 12 (SI No. 303+309+310A) Class -150 \nbrick work in 1:4 cement and Coarse \nsand mortar in superstructure for\nwall thicknes One Brick including \nsupply of all material,labour and \nT&Petc required forproper Completion\nof work.\n BI01010001010000000000000515BI0100001124 2.87 Cum.
13 13 Oiling & greasing of rolling \nshutters & channels etc. including \nsupply of all materials labour \nT&P etc. required for proper \ncompletion of the work \n BI01010001010000000000000515BI0100001125 4 No
14 14 NBO.11.24 Supply and fixing of Kota \nStone in Flooring 20mm thick and \njoints filled with 1:2 cement and \ncoarse sand with approved colouring \nmaterail to be give an even shade \nwith 12mm base coat (beeding) of 1:2\ncement & coarse sand mortar and \npolish by hand ormachine and finaaly \nfinished with french manson polish or\nother approved polish including\nsupply of all material, labour,\nTool & palnt etc. required for\nproper compoletion of work\n BI01010001010000000000000515BI0100001126 160.96 sqm
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail