| 1 | 1 | SUPPLY of PDB1 3PHASES SUPPLY DISTRIBUTION BY FOLLOWING FEEDER CONFIGURATIONS:-PANEL SHEET THICKNESS 2MM,IC/OG CABLE TOP ENTRY, INCOMER FEEDER SIZE:-250AMPS,4POLE MCCB, OG 6x63A 4P MCCBwith inbuild relay for EF OL,415V,Compartmentlized , | | 1 | Number |
|---|
| 2 | 2 | Erection commissioning and testing of PDB-1 inside shop floor, with incomming and OG cable glanding and terminations ,Platform for thePDB,500mm height, with all accesories and welding work | | 1 | Number |
|---|
| 3 | 3 | Supply, erection , commissioning and Testing of 433 V PDB-3 as per TS | | 1 | Number |
|---|
| 4 | 4 | Erection commissioning and testing of PDB-3 inside shop floor, with incomming and OG cable glanding and terminations ,Platform for thePDB,500mm height, with all accesories and welding work | | 1 | Number |
|---|
| 5 | 5 | Supply, erection , commissioning and Testing of 433 V PDB-4 in as per TS | | 1 | Number |
|---|
| 6 | 6 | Errection commissioning and testing of PDB-4 with base frame construction of 500mm height with required channels/angles and anchoring of the same. | | 1 | Number |
|---|
| 7 | 7 | SUPPLY OF DISTRIBUTION BOXES FOR LIGHTING INSIDE ROOMS 3 PHASE DISTRIBUTION INSIDE ROOM, FLUSH MOUNTING TYPE ,INCOMING 1X 63 AMPS 4POLE ISOLATOR, WITH DISTRIBUTION 6 AMPS C CURVE MCB SINGLE POLE,6WAY OUT | | 2 | Number |
|---|
| 8 | 8 | Errection commissioning and testing of PDB-4 with base frame construction of 500mm height with required channels/angles and anchoring of the same. | | 2 | Number |
|---|
| 9 | 9 | SUPPLY OF DISTRIBUTION BOXES FOR LIGHTING INSIDE SHOP FLOOR 3 PHASE DISTRIBUTION , FLUSH MOUNTING/SURFACE MOUNTING(AS PER REQUIREMENT) TYPE ,INCOMING 63 AMPS 4POLE ISOLATOR,3 PHASE DISTRIBUTION BOX,WITH DISTRIBUTION, 6AMPS SP OG, 15no's, | | 2 | Number |
|---|
| 10 | 10 | Erection Fixing and Termination of Lighting Junction Boxes, inside shop floor with Incoming and Out going Cables termination, Incoming cable may be up to 3.5Cx50Sqmm Armored and out going cables will be 2.5/4Sqmm Flexible Cables. providing | | 2 | Number |
|---|
| 11 | 11 | Supply, erection commissioning and testing of 2'x2' LED Lights as per TS, make SYSKA,PHILLIPS,HAVELLS, BAJAJ,CROMPTON | | 12 | Number |
|---|
| 12 | 12 | Scope shall also include following activities-(a) Providing of Cut outs in False ceiling. (b) Installation and Fixing of LED lights . Wiring of the lights with laying of PVC conduits, and required accessories, in concealed manner. | | 12 | Number |
|---|
| 13 | 13 | SUPPLY OF LED SURFACE/RECESS MOUNTING LIGHTS ,POWER-15W,1PH,230VAC,50HZ,MAKE-BAJAJ,HAVELLS,SISKA/CROMPTON/PHILLIPS | | 10 | Number |
|---|
| 14 | 14 | Scope shall also include following activities- (a) Installation and Fixing of LED lights . (b) Wiring of the lights with laying of PVC conduits, | | 10 | Number |
|---|
| 15 | 15 | SUPPLY OF LED HIGH BAY LIGHTS 150 WATTS, 10 WATTS,SUPPLY VOLT 230 VAC,AMBIENT TEMP-45 C, POWER FACTOR >0.9,HARMONICS DISTORTION <10%,FRONT GLASS TEMPER PROOF TYPE | | 120 | Number |
|---|
| 16 | 16 | Installation, fixing and testing of LED 150watts,10Watts High bay light,at 10.5 Mtrs height, considering the crane passing below the lights, with suitable accessories for mounting of the lights from the roof, Junction boxes | | 120 | Number |
|---|
| 17 | 17 | SUPPLY OF TUBE LIGHT LED TYPE WALL MOUNTING ,POWER SUPPLY-20W,4FTS.1PH,230VAC,50HZ,WITH ALL MOUNTING ACCESSORIES,MAKE-BAJAJ,HAVELLS,SISKA/CROMPTON/PHILLIPS | | 10 | Number |
|---|
| 18 | 18 | Installation, fixing and testing of tube light LED type wall mounting ,Power Supply-20W,4fts.1Ph,230Vac,50Hz,with all mounting accessories. | | 10 | Number |
|---|
| 19 | 19 | SUPPLY OF LED TYPE STREET LIGHTS , WITH POLE OF 6MTRS HEIGHT, SINGLE ARM, PVC JUNCTION BOXES, IP-62/65, FOR STREET LIGHT CABLE CONNECTIONS, LED FIXTURE SHALL BE 100WATTS 10W | | 40 | Number |
|---|
| 20 | 20 | .Installation, erection, commissioning and testing of Street light poles with all required Civil foundations,excavations etc, distance between poles shall be min 12mtrs or as directed by engineer in charge, with | | 40 | Number |
|---|
| 21 | 21 | SUPPLY, OF 2 TON HIGH WALL MOUNTED SPLIT AIR CONDITIONER, INVERTER TYPE, WITH CORD LESS REMOTE. COPPER COIL FOR CONDENSER,MAKE-LG,SAMSUNG,VOLTAS | | 2 | Number |
|---|
| 22 | 22 | Installation and commissioning of 2.0 Ton Split AC's by following 1) Installation of High Wall mounted Split AC with all required accessories like Frame, Angular stand for out door unit etc. | | 2 | Number |
|---|
| 23 | 23 | SUPPLY OF FAN, 48INCH DIA, CEILING MOUNTING, WITH SHAFT LENGTH >700MM(AS PER REQUIREMENT), SINGLE PH 230VAC, 50HZ, POWER CONSUMPTION<100W.MATCHING COLOR , WITH ALL REQUIRED ACCESSORIES. | | 4 | Number |
|---|
| 24 | 24 | Installation and testing of ceiling Fans include following activities-Providing of Cut outs in False ceiling.Installation and Fixing of Fans with mounting arrangement. WITH WIRING AND EARTHING | | 4 | Number |
|---|
| 25 | 25 | SUPPLY OF VENTILATION FAN,PVC TYPE, FOR TOILETS,1PHASE 230VAC, FAN SIZE-150MM. MAKE- BAJAJ, CROMPTON,HAVELLS | | 10 | Number |
|---|
| 26 | 26 | WIRING AND FIXING OF FANS INSIDE ROOMS AS PER INSTRUCTION OF ENGINEER INCHARGE | | 10 | Number |
|---|
| 27 | 27 | SUPPLY, OF MODULAR SWITCHES WITH SOCKET, 2X6 AMPS SWITCHES WITH 2X6AMPS SOCKETS, FLUSH MOUNTING TYPE,IN A SINGLE BOARD., WITH CONCEALED METAL BOX OF SUITABLE SIZE,WHITE COLOR, MODULAR COVER FRAME. MAKE-HAVELLS/ANCHOR/FINOLEX /LEGRAND | | 10 | Number |
|---|
| 28 | 28 | INSTALLATION OF MODULAR SWITCH BOARD WITH CIVIL WORKS , CHIPPING OF WALL, FIXING OF BOARD AND WIRING AS PER INSTRUCTION OF ENGINEER INCHARGE | | 10 | Number |
|---|
| 29 | 29 | SUPPLY OF MODULAR SWITCHES WITH SOCKET, 1X16 AMPS SWITCHES WITH 1X16AMPS SOCKETS, FLUSH MOUNTING TYPE,IN A SINGLE BOARD., WITH CONCEALED METAL BOX OF SUITABLE SIZE,WHITE COLOR, MODULAR COVER FRAME. MAKE-HAVELLS/ANCHOR/FINOLEX /LEGRAND | | 6 | Number |
|---|
| 30 | 30 | INSTALLATION OF MODULAR SWITCH BOARD WITH CIVIL WORKS , CHIPPING OF WALL, FIXING OF BOARD AND WIRING AS PER INSTRUCTION OF ENGINEER INCHARGE | | 6 | Number |
|---|
| 31 | 31 | SUPPLY AND TESTING OF MODULAR PLATE , FRAME COVER AND METAL CONCEALED BOXES, WITH 2 NO'S OF 6AMPS SWITCHES AND 2 NO'S OF FAN SPEED REGULATORS SINGLE MODULE TYPE.METAL BOXES MUST BE 4 WAY TYPE | | 6 | Number |
|---|
| 32 | 32 | INSTALLATION OF MODULAR SWITCH BOARD WITH CIVIL WORKS , CHIPPING OF WALL, FIXING OF BOARD AND WIRING AS PER INSTRUCTION OF ENGINEER INCHARGE | | 6 | Number |
|---|
| 33 | 33 | SUPPLY OF 8 MODULAR SWITCH BOARD WITH 6 AMPS SWITCHES, WITH METAL CONCEALED BOX, FRAME COVER, PLATE AND ALL OTHER REQUIRED ACCESSORIES, MAKE-HAVELLS/ANCHOR/FINOLEX /LEGRAND | | 5 | Number |
|---|
| 34 | 34 | INSTALLATION OF MODULAR SWITCH BOARD WITH CIVIL WORKS , CHIPPING OF WALL, FIXING OF BOARD AND WIRING AS PER INSTRUCTION OF ENGINEER INCHARGE | | 5 | Number |
|---|
| 35 | 35 | SUPPLY OF 12 MODULAR SWITCH BOARD WITH 6 AMPS SWITCHES, WITH METAL CONCEALED BOX, FRAME COVER, PLATE AND ALL OTHER REQUIRED ACCESSORIES, MAKE-HAVELLS/ANCHOR/FINOLEX /LEGRAND | | 4 | Number |
|---|
| 36 | 36 | INSTALLATION OF MODULAR SWITCH BOARD WITH CIVIL WORKS , CHIPPING OF WALL, FIXING OF BOARD AND WIRING AS PER INSTRUCTION OF ENGINEER INCHARGE | | 4 | Number |
|---|
| 37 | 37 | SUPPLY, AIR CONDITIONER SUPPLY POINTS WITH 25AMPS MCB,C-CURVE, METAL CANCELED BOX, FLUSH MOUNTING TYPE, WITH PLUG AND TOP OF SUITABLE RATING | | 2 | Number |
|---|
| 38 | 38 | INSTALLATION OF AIR CONDITION BOARD WITH CIVIL WORKS , CHIPPING OF WALL, FIXING OF BOARD AND WIRING AS PER INSTRUCTION OF ENGINEER INCHARGE | | 2 | Number |
|---|
| 39 | 39 | SUPPLY OF 3 CORE 2.5 MM SQ u,Strended Cable, XLPE,Armoured/Out door duty, for shop floor lighting, Make- HAVELLS, EI,KEC,POLYCAB,GLOSTER,UNIVERSAL. | | 4000 | Metres |
|---|
| 40 | 40 | LAYING 3 CORE 2.5SQMM CABLE for shop floor lighting, in exposed or concealed manner along with thestructures of the shop floor at a height of 14Mtrs,Along with terminations at LDB and junction boxes with required accessories. | | 4000 | Metres |
|---|
| 41 | 41 | SUPPLY OF 4 CORE 16SQMM, CU,STRENDED CABLE, XLPE,ARMOURED/OUT DOOR DUTY, FOR SHOP FLOOR LIGHTING, MAKE- HAVELLS, KEI,POLYCAB,GLOSTER,UNIVERSAL.LAYING OF 2 CORE 4SQMM, CU,STRENDED CABLE, PVC,ARMOURED/OUT DOOR DUTY, FOR SHOP FLOOR LIGHTING | | 1000 | Metres |
|---|
| 42 | 42 | LAYING 4 CORE 16SQMM CABLE for shop floor lighting, in exposed or concealed manner along with thestructures of the shop floor at a height of 14Mtrs,Along with terminations at LDB and junction boxes with required accessories. | | 1000 | Metres |
|---|
| 43 | 43 | SUPPLY OF 4 SQMM, FLEXIBLE WIRES, R,Y ,B AND BLACK COLOR,1100V GRADE, CU STRANDED WIRES, MAKE- KEI,HAVELS,ANCHOR,FINOLEX ,LAYING OF 4SQMM FLEXIBLE CABLE, ALONG WITH CONDUITS IN CONCEALED MANNER WITH ALL REQUIRED ACCESSORIES | | 500 | Metres |
|---|
| 44 | 44 | Laying of 4Sqmm flexible cable, along with conduits in concealed manner with all required accessories for termination at both the ends | | 500 | Metres |
|---|
| 45 | 45 | SUPPLY OF 2.5 SQMM, FLEXIBLE WIRES, R,Y ,B AND BLACK COLOR,1100V GRADE, CU STRANDED WIRES, MAKE- KEI,HAVELS,ANCHOR,LAYING OF 2.5SQMM FLEXIBLE CABLE, ALONG WITH CONDUITS IN CONCEALED MANNER WITH ALL REQUIRED ACCESSORIES | | 2000 | Metres |
|---|
| 46 | 46 | Laying of 2.5Sqmm flexible cable, along with conduits in concealed manner with all required accessories for termination at both the ends | | 2000 | Metres |
|---|
| 47 | 47 | SUPPLY OF 1.5 SQMM, FLEXIBLE WIRES, R,Y ,B AND BLACK COLOR,1100V GRADE, CU STRANDED WIRES, MAKE- KEI,HAVELS,ANCHORLAYING OF 1.5SQMM FLEXIBLE CABLE, ALONG WITH CONDUITS IN CONCEALED MANNER WITH ALL REQUIRED ACCESSORIES | | 2000 | Metres |
|---|
| 48 | 48 | Laying of 1.5Sqmm flexible cable, along with conduits in concealed manner with all required accessories for termination at both the ends | | 2000 | Metres |
|---|
| 49 | 49 | SUPPLY TESTING AND LAYING OF 240SQMM , AL, XPLE, STRIP ARMOURED ,1100V GRADE,STRANDED CONDUCTOR, 3.5 C, COLOR CODED,EXTRUDED INNER SHEATH AS PER IS 7098 PART-2, IN OVER HEAD /UNDER GROUND/ OVER HEAD MANNER AS PER TS | | 1300 | Metres |
|---|
| 50 | 50 | LAYING OF3.5 CORE 240SQMM CABLE IN OVER HEAD UNDER GROUND MANNER AS PER INSTRUCTION OF ENGINEER INCHARGE | | 1300 | Metres |
|---|
| 51 | 51 | SUPPLY TESTING AND LAYING OF 120SQMM , AL, XPLE, STRIP ARMOURED ,1100V GRADE,STRANDED CONDUCTOR, 3.5 C, COLOR CODED,EXTRUDED INNER SHEATH AS PER IS 7098 PART-2, IN OVER HEAD /UNDER GROUND MANNER AS PER TS | | 300 | Metres |
|---|
| 52 | 52 | LAYING OF3.5 CORE 120SQMM CABLE IN OVER HEAD UNDER GROUND MANNER AS PER INSTRUCTION OF ENGINEER INCHARGE | | 300 | Metres |
|---|
| 53 | 53 | SUPPLY TESTING AND LAYING OF 50SQMM , AL, XPLE, STRIP ARMOURED ,1100V GRADE,STRANDED CONDUCTOR, 3.5 C, COLOR CODED,EXTRUDED INNER SHEATH AS PER IS 7098 PART-2, IN OVER HEAD /UNDER GROUND MANNER AS PER TS | | 300 | Metres |
|---|
| 54 | 54 | LAYING OF3.5 CORE 50SQMM CABLE IN OVER HEAD UNDER GROUND MANNER AS PER INSTRUCTION OF ENGINEER INCHARGE | | 300 | Metres |
|---|
| 55 | 55 | SUPPLY OF PVC CONDUITS 1\", WITH ALL REQUIRED ACCESSORIES LIKE BENDS JUNCTION BOXES CLAMPS ETC.(AS AND WHEN REQUIRED)LAYING OF 1\" PVC CONDUIT IN CONCEALED OR SURFACE MANNER WITH ALL NECESSARY ACCESSORIES. | | 300 | Metres |
|---|
| 56 | 56 | PROVIDING FIXING AND LAYING OF CONDUIT CONCEALED OR SURFACE MANNER WITH ALL REQUIRED ACCESORIES | | 300 | Metres |
|---|
| 57 | 57 | SUPPLY OF3 PHASE 63AMPS, 415 VOLT INDUSTRIAL WELDING SOCKET BOX WITH PLUG TOP, MATERIAL THERMOPLASTIC, WITH 63AMPS MCB MAKEHAVELLS/LEGRAND/L&T/HANSEL.ERECTION AND TESTING OF INDUSTRIAL WELDING SOCKET WITH 63AAMPS MCB | | 12 | Number |
|---|
| 58 | 58 | rection and testing of Industrial welding socket with 63AAmps MCB along with the Structure column or walls with required clamping accessories as per requirement. | | 12 | Number |
|---|
| 59 | 59 | SUPPLY OF1 PHASE, 230VAC, 16AMPS INDUSTRIAL WELDING SOCKET BOX WITH PLUG TOP, MATERIAL THERMOPLASTIC, WITH 63AMPS MCB MAKEHAVELLS/LEGRAND/L&T/HANSEL.ERECTION AND TESTING OF INDUSTRIAL WELDING SOCKET WITH 16AAMPS MCB | | 8 | Number |
|---|
| 60 | 60 | Erection and testing of Industrial welding socket with 16AAmps MCB along with the Structure column or walls with required clamping accessories as per requirement | | 8 | Number |
|---|
| 61 | 61 | SUPPLY,ERECTION AND COMMISSIONING OF EARTHING PITS, TREATED PITS AS PER IS-3043. SUPPLY SHALL INCLUDE ALL THE REQUIRED MATERIAL AS MENTION IN IS -3043 FOR THE SAME. FOLLOWING JOBS SHALL BE INCLUDED | | 30 | Number |
|---|
| 62 | 62 | ERECTION OF EARTH PITS Digging of Ground as per the directions of IS standards. Providing and fixing of earth Pit materials Providing and construction of Earth Pit Chamber as per IS standard directives WITH INTERCONNECTWITH GI STRIP | | 30 | Number |
|---|
| 63 | 63 | SUPPLY, ERECTION AND COMMISSIONING OF THE SECONDARY EARTHING SYSTEM (CONNECTION FROM MAIN EARTH GRID TO THE EQUIPMETS) BY GI STRIP OF SIZE 25MMX 5MM TO THE EQUIPMENTS, BY WELDING/BOLTING AT BOTH THE ENDS | | 600 | Metres |
|---|
| 64 | 64 | LAYING AND WELDING OF GI STRIPS SECONDARY EARTHING AS PER INSTRUCTION OF ENGINEER INCHARGE | | 600 | Metres |
|---|
| 65 | 65 | SUPPLY, ERECTION AND COMMISSIONING OF THE SECONDARY EARTHING SYSTEM (CONNECTION FROM MAIN EARTH GRID TO THE EQUIPMETS) BY GI STRIP OF SIZE 50MMX 10MM TO THE EQUIPMENTS AND STRUCTURES OF BUILDING, BY WELDING/BOLTING | | 400 | Metres |
|---|
| 66 | 66 | LAYING AND WELDING OF GI STRIPS SECONDARY EARTHING AS PER INSTRUCTION OF ENGINEER INCHARGE | | 400 | Metres |
|---|
| 67 | 67 | SUPPLY, INSTALLATION AND TESTING OF EARTHING SPIKES FOR STRUCTURAL BUILDING ,WITH NUTS AND BOLTS ALONG WITH EARTHING STRIP OF 25X3MM CROSS SECTION,GI MATERIAL, UP TO THE NEAREST EARTHPIT | | 20 | Number |
|---|
| 68 | 68 | INSTALLATION OF LIGHTINING SPIKES Supply and Fixing of Epoxy Insulators for the the Earthing strip providing and fixing of Earthing spikes on top of building, with suitable nuts and bolts. LAYING OF GI STRIP ON EPOXY INS CONNECTION WITH PIT | | 20 | Number |
|---|
| 69 | 69 | SUPPLY, ERECTION,AND COMMISSIONING OF CABLE TRAYS SIZE 450MM AT A HEIGHT OF 10MTRS MAX, AS PER ANNEXURE WITH ALL SUPPORTS WITH THE COLUMN STRUCTURES | | 300 | Metres |
|---|
| 70 | 70 | SUPPLY, ERECTION,AND COMMISSIONING OF CABLE TRAYS SIZE UP TO 200MM AT A HEIGHT OF 10MTRS MAX FOR LIGHTING AND OTHER POWER DISTRIBUTION IN SHOP FLOOR, AS PER ANNEXURE WITH ALL SUPPORTS WITH THE COLUMN STRUCTURES | | 400 | Metres |
|---|
| 71 | 71 | SUPPLY OF 150KVAR CAPACITOR BANK PANELS ALONG WITH SERIES REACTORS, MCCBS, APFC RELAYS, CAPACITOR DUTY CONTACTORS AS PER ANNEXURE | | 1 | Set |
|---|
| 72 | 72 | INSTALLATION TESTING AND COMMISSIONING OF CAPACITOR BANK INSIDE SHOP FLOOR, WITH BASE FRAME 500 HEIGHT WITH ANGLES /CHANNELS , INC AND OG CABLE TERMINATIONS | | 1 | Set |
|---|
| 73 | 73 | SUPPLY OF CLASS A INSULATION MATS AS PER ANNEXURE | | 100 | Metres |
|---|