14 Nagar Palika Parishad Bajpai Talab Me Madiya Mata Mandir Ke Samne Se Samshanghat Ki Boundary Tak Dharak Bhitti Rcc Diwal Ka Nirman Karya
Tender Value
Ref. Documents
Estimated cost
Bid Submission
19 Jan 2021
0 days left
EMD
1.39 Lakhs
Bank guarantee accepted
Document Fee
8260
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
MAURANIPUR → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
CONSTRUCTION OF RCC WALL
BOQ
| Name of Work: uxj ikfydk ifj\"kn~ cktisbZ rkykc esa efM;k ekrk eafnj ds lkeus ls 'ke'kku?kkV dh okmUMªh rd /kkjd fHkRrh ¼vkj0lh0lh0 nhoky½ cukus dk dk;ZA | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches. (Rate is Excluding Royality) SI No. 251\n | 236.25 | Cum | |
| 2 | 2 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km.(5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. (Rate is Including Royality) SI No. 255\n | 33.75 | Cum | |
| 3 | 3 | Cement concrete with 4 cm (1.5\") gauge approved stone ballast, approved coarse sand and cement in the proportion of 8 : 4 : I including supply of all materials, labour and T & P etc. required for proper completion of the work. SI No. 281\n | 108.75 | Cum | |
| 4 | 4 | R.C.C work with cement approved coarse sand and 2 cm. (3/4\") gauge approved stone ballast in the proportion of 1:1.5:3 in RCC Raft Foundation excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour& T&P etc. required for proper completion of the work. Binding wire cost being included in the item. Si No. 287 | 330 | Cum | |
| 5 | 5 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks. Si No. 504 | 368.86 | Qtl | |
| 6 | 6 | Earth work in cutting or in Filling in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 metre (20\") in depth and earthwork in embankment to be in 20 cm(8\") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5fts) lifts and 30 m. (100') lead. The earth from cutting to be used in making filling or to be deposited as spoil banks within 30 metres (100 fts) distance as directed by Engineer-in-charge. (Rate is Excluding Royality) | 1050 | Cum | |
| 7 | 7 | 80mm Interlocking C.C. block laid in stone dust base & fill joint with 2.36 mm stone dust at joint filled with S/D after leveling & dressing base including supply of all material labour and tools and plants etc. required for proper completion of the work. | 750 | Sqm | |
| 8 | 8 | Supply & Fixing 110 mm dia PVC Pipe | 33.6 | RM | |
| 9 | 9 | M-150 class brick work with 1:4 cement sand mortar with material labour T&P. | 6.9 | Cum | |
| 10 | 10 | Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical / MORT&H specification 2504 | 189 | Cum | |
| 11 | 11 | 12 mm thick plaster on brick work minimum thickness not less than 10 mm with cement mortar in proportion of 1:6 cement and fine sand of 1.25 fineness modulus including supply of all materials, labour and tools and plants etc required for proper completion of the work.SI No.17.58(3) | 120 | Sqm | |
| 12 | 12 | Raised pointing with cement and Fine sand 1.25 F.M. mortar on brick work in proportion of 1 :2, including supply of all material, labour and T & P etc. required for proper completion of the work SI No 577\n | 875 | Sqm | |
| 13 | 13 | Add Labour Cess @ 1% | 1 | No | |
| 14 | 14 | Add GST @ 12% | 1 | No |
AI Tender Summary
Tender Timeline
Jan 13, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedJan 19, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJan 21, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender