Public Administrative Department Government Departments Closing in 0 days TDR #26597691

Improvement Of Singrimari Fis ( From Ch . 1000 M To 2000 . 00M ) Improvement Of Singrimari Fis ( From Ch . 1000 M To 2000 . 00M ) Ls/Mcunder Sopd For The Year 2019-20 Under Tangla Division Irrigation Tangla ( Group No-Ii )

Issued by Government Departments · TANGLA, Assam
Tender Value
1.59 Crore
Estimated cost
Bid Submission
26 Jan 2021
0 days left
EMD
3.18 Lakhs
Bank guarantee accepted
Document Fee
1800
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
TANGLA → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Improvement Of Singrimari Fis ( From Ch . 1000 M To 2000 . 00M ) Improvement Of Singrimari Fis ( From Ch . 1000 M To 2000 . 00M ) Ls/Mcunder Sopd For The Year 2019-20 Under Tangla Division Irrigation Tangla ( Group No-Ii )

BOQ

Name of Work: Improvement of Singrimari FIS ( from Ch. 1000 m to 2000.00M ) LS/MCunder SOPD for the year 2019-20 under Tangla Division Irrigation Tangla (Group No-II)
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Construction of RCC Canal ( from Ch. 1000 m to 2000.00M ) LS/MCSub -Estimate-1
22Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).\nAll types of soils except soil mixed with gravel and bouldersItem No.-11180CuM
33C.C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).Item No.-2120CuM
44Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.Item No.-32325SqM
55Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.Item No.-4607.32Qtl.
66Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works as directed complete. (Measurement to be taken on the face area timbered).Item No.-54760SqM
77River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc. complete as directed as specified.Item No.-6168.75CuM
88R.C.C work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc.in proportion 1:2:4 (M15) with hard broken stone agg. of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).Item No.-7713.25CuM
9912 mm cement plastering including clearing surface and curing complete as directed. In prop. 1:4Item No.-82555SqM
1010Providing 50 mm wide expansion joints with bituminous compound mixed with coarse sand for canal work at an interval of 10.0 M apart including laying, fitting the compound in proper position, etc. complete as directed.Item No.-9285.5RM
1111Construction of Transition Zone (3 Nos)Sub -Estimate-2
1212Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). \nAll types of soils except soil mixed with gravel and boulders \nItem No.-102.76CuM
1313Item No. 2 : C.C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately). \n Total = 0.44 m3Item No.-111.32CuM
1414Item No. 3 : Soling in foundation and under floor including filling interstices, ramming etc, complete as directed and as specified thickness.Item No.-126.54CuM
1515Item No. 4 : Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed. \nItem No.-134.86Qtl.
1616Item No. 5 : Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works as directed complete. (Measurement to be taken on the face area timbered). \nItem No.-1429.82SqM
1717Item No. 6 : River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc. complete as directed as specified. \nItem No.-150.99CuM
1818Item No. 7 : R.C.C work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc.in proportion 1:2:4 (M15) with hard broken stone agg. of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately). \nItem No.-163.93CuM
191912 mm cement plastering including clearing surface and curing complete as directed. In prop. 1:4 \nItem No.-1721.75SqM
2020Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity). \nItem No.-1823.91Cum
2121Construction of Cattle Crossing for (9 Nos.)Sub -Estimate-3
2222Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).A. All types of soils except soil mixed with gravel and bouldersItem No.-1939.6CuM
2323C.C work in proportion 1:3:6 in foundation/ abutment/ piers/ wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).Item No.-207.29CuM
2424RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).Item No.-2120.7SqM
2525Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.Item No.-2220.88Qtl.
2626Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) With 38 mm thick wood plank With 38 mm thick wood plank \nItem No.-23213.93SqM
272712 mm cement plastering including clearing surface and curing complete as directed. In proportion 1:4Item No.-24109.89SqM
2828Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).Item No.-2565.25CuM
2929Labour Welfare Cess % (Approx Rs. 159,45,290/-)Item No.-261%

AI Tender Summary

OUR REF NO 26597691
AUTHORITY Government Departments
TENDER VALUE 1.59 Crore
LAST DATE 26-01-2021
Authority
Authority Name Bodoland Territorial Council
Work Description Improvement Of Singrimari Fis ( From Ch . 1000 M To 2000 . 00M ) Improvement Of Singrimari Fis ( From Ch . 1000 M To 2000 . 00M ) Ls/Mcunder Sopd For The Year 2019-20 Under Tangla Division Irrigation Tangla ( Group No-Ii )
Basic Detail
Tender No ET-22/2018-19/18
Bidding Type Tender
Location
City TANGLA
State Assam
Key Dates
Publish Date 14 Jan 2021
Submission Date 26 Jan 2021
Open Date 26 Jan 2021
Finance
Tender Value 1.59 Crore
Tender Fee 1800
EMD 3.18 Lakhs
Exemption Not Available
Document List
SBD-IRR-18.pdf
0310A230-E9AB-418A-B8C6-B61AB973035A.html
BOQ_31208.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 14, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 26, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 26, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

SBD-IRR-18.pdf

html

0310A230-E9AB-418A-B8C6-B61AB973035A.html

xls

BOQ_31208.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders