South Eastern Coalfields Limited-SECL has published Assistance In Major Shutdown/Breakdown/Mechanical Maintenance Works Of Belt Conveyors Of Bunker And Surface Area Of New Chp , Dipka Expansion Project On As And When Required Basis . . Submission Date for this Tender is 30-01-2021. Conveyors and Accessories Tenders in Dipka Expansion Project, Dipka Area Chhattisgarh. Bidders can get complete Tender details and download the document.
Name of the Work / Contract No: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Dismantling/disassembling/handling job in major shut down/ break-down mechanical maintenance works:- Dismantling/ lowering of counter-weights, dismounting of idlers and idler frames; pulling of damaged/ existing steel cord belt/ Nylon-Nylon belt; dismantling and disassembly of damaged assembly/ sub-assembly, pulleys, rolling elements, drive units, conveyor take-up units etc. and other allied works at various locations of Bunker & Surface Area of New CHP. | BI01010001010000000000000515BI0100001113 | 301 | Te. |
2 | 2 | Assembling/installation/handling job in major shutdown/ break-down mechanical maintenance works:- Handling of counter-weights; mounting of idlers and idler frames; laying/ placing/ positioning of new steel cord/ Nylon-Nylon belt; re-installation/ re-erection, setting of new/ repaired assembly/ sub-assembly, pulleys, rolling elements, drive units, conveyor take-up units etc. and other allied works at various locations of Bunker & Surface Area of New CHP. | BI01010001010000000000000515BI0100001114 | 301 | Te. |
3 | 3 | Scope/nature of Work:- 1). The work will be taken up as and when required basis on a very short notice subjected to availability and shutdown of circuits. 2). The welding electrode, Industrial Gas, other consumables will be provided by the Department. 3). For installation of drive units/ other sub-assembling desired preparation should be done. 4). Work should be carried out as per existing design. 5). The repairing /maintenance work carried out on site will be as per instruction of Engineer I/c. 6). All tools, tackles and safety standards to engaged personnel will be provided by the Contractor. | |||
4 | 4 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001129 | 1 | Nos |