| 1 | 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excacated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in- charge upto a distance of 30 M. from the foundation trenches. including all cost of labour, material, T&P, machinary and all taxes but excluding GST. | | 1500 | cum |
|---|
| 2 | 2 | Dewatering works during construction at site for day & night as required during the execution of the entire work till its completion. The rate including of pump of 7.5 Kw. capacity, fuel, labour, T&P etc. including all cost of labour, material, T&P, machinary and all taxes but excluding GST. | | 400 | Hr. |
|---|
| 3 | 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar (DSR 15.7.4) . including all cost of labour, material, T&P, machinary and all taxes but excluding GST. | | 235 | cum |
|---|
| 4 | 4 | Demolishing R.C.C./CC work manually/ by mechanical means includingstacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. (DSR 15.3) . including all cost of labour, material, T&P, machinary and all taxes but excluding GST. | | 50 | cum |
|---|
| 5 | 5 | Cement Concrete (1:4:8) with 4cm guage approved stone ballast, Coarse sand & cement in the materials, labour Tools & plants etc. required for proper completion of the work. (S.I. 281) including all cost of labour, material, T&P, machinary and all taxes but excluding GST. | | 103 | cum |
|---|
| 6 | 6 | Construction of embankment/backfilling with soil obtained from borrow pits without all lifts and all leads, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Ref. to Mort&H Specification No.305) but excluding royality, excluding cost of earth, excluding cartage etc. including all cost of labour, material, T&P, macheniry and all taxes excluding GST. including all cost of labour, material, T&P, machinary and all taxes but excluding GST. | | 400 | cum |
|---|
| 7 | 7 | Supplying, fitting and placing HYSD bar (steel use SAIL) reinforcement in sub-structure complete as per drawing and Technical Specifications. including all cost of labour, material, T&P, machinary and all taxes but excluding GST. | | 35000 | Kg |
|---|
| 8 | 8 | Plain/Reinforced Cement Concrete (M-25) in wall & foundation complete as per Drawing and Technical Specifications. including all cost of shuttring, labour, material, T&P, machinary and all taxes but excluding GST. | | 400 | cum |
|---|
| 9 | 9 | Providing and erecting and removing temporary,protective screens made out of specified fabric Wooven PVC clothes with all necessary fixing arrangements to ensure that it remains in positions for the work duration as required by the Engineer in Charge (SOR LKO 26.36.1). including all cost of labour, material, T&P, machinary and all taxes but excluding GST. | | 120 | RM |
|---|