Water Resources Department-WRD has published Updating Level Area And Capacity Tables Updating Level Area And Capacity Tables Using Dgps And Bathometric Surveys For Rallapadu Reservoir , Srisailam Reservoir And Mylavaram Reservoir In Andhra Pradesh Under National Hydrology Project ( Nhp ) . . Submission Date for this Tender is 11-02-2021. Reservoir Tenders in Andhra Pradesh Andhra Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Jan-2021 | Updating Level Area and capacity tables | Technical Bid | 11-02-2021 |
Name of Work: Updating Level Area and capacity tables using DGPS and Bathometric Surveys for Rallapadu Reservoir, Srisailam Reservoir and Mylavaram Reservoir in Andhra Pradesh under National Hydrology Project (NHP) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | (i)Establishment reference control points in the foreshore of the reservoir with DGPS on the existing permanent features etc., complete for finished item of work and as directed by Engineer in charge at site of work\n\n(ii)Carrying DCBM along the foreshore of reservoir with Auto level etc., complete for finished item of work and as directed by the Engineer-in-charge at site of work | item1 | 601 | Km |
2 | 2 | For small reservoirs (water spread area less than 30 sq. km.), grid of 50 m x 50 m shall be adopted for both hydrographic and topographic survey and preparation of Elevation-Area-Capacity table/curve. | item2 | 23 | Sq km |
3 | 3 | Hydrographic and Topographic survey to cover the entire area of the reservoir up to maximum water level (100m x 100 m grid for hydrographic survey and 100m x 100m grid for topographic survey).Conducting topographical above water level portion of the reservoir bed and hydrographical survey within the water portion of the reservoir points.. Elevation-Area-Capacity table/curve | item3 | 541 | Sq km |
4 | 4 | Preparation of reports(Contour plan,Area Capacity tables and curves) , printing, binding and submitting copies complete for finished item of work and as directed by the Engineer-in-charge.(Five Hard Copies) | item4 | 1 | LS |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail