| 1 | 1 | Labour work | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Earth work in excavation in foundation in B.C. soil Lead upto 30 m and lift up to 1.50m i/c all complete as directed by Engineer in charge | BI01010001010000000000000515BI0100001113 | 150 | Cum |
|---|
| 3 | 1.02 | Cement concrete in 1:4:8 with cement Sand and 40mm granite stone ballast (crusher broken) in foundation i/c supply of all matarials, labours and T&P rtc. Required for proper completion of the work. | BI01010001010000000000000515BI0100001114 | 10 | Cum |
|---|
| 4 | 1.03 | Brick work in 1:6 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all matarials, labours and T&P rtc. Required for proper completion of the work. | BI01010001010000000000000515BI0100001115 | 35 | Cum |
|---|
| 5 | 1.04 | R.C.C work with cement approved coarse sand and 20 mm gauge stone ballast in the proportions of 1:1.5:3 in platform excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. also including supply of all materials,labour and T&P etc. required for proper completion of the work .Binding wire cost being included in the item . | BI01010001010000000000000515BI0100001116 | 8 | Cum |
|---|
| 6 | 1.05 | Mild steel or iron in plain work such as reinforced concrete wrought to required same as necessary including bending for proper completion of the work.(8 To 16 mm) | BI01010001010000000000000515BI0100001117 | 1000 | Kg |
|---|
| 7 | 1.06 | Brick work in 1:6 cement and fine sand of 1.25 F.M. mortar in Super structure and plinth including supply of all matarials, labours and T&P rtc. Required for proper completion of the work. | BI01010001010000000000000515BI0100001118 | 50 | Cum |
|---|
| 8 | 1.07 | Loose Earth Filling in campus | BI01010001010000000000000515BI0100001119 | 200 | Cum |
|---|
| 9 | 1.08 | Laying and consolidation of blanket coat stone dust including supply of all materials, labour and T&P. | BI01010001010000000000000515BI0100001120 | 150 | Cum |
|---|
| 10 | 1.09 | Fixing 25/50 mm Stone Ballast including watering, mixing and completion of work | BI01010001010000000000000515BI0100001121 | 120 | Cum |
|---|
| 11 | 1.1 | Providing and laying of 80mm interlocking concrete block pavment laid in stone dust base and fill joint with fine sand. Joint filled after labling and dressing base i\c supply of all material, labour, T&P etc required for proper completion of the work. | BI01010001010000000000000515BI0100001122 | 1200 | Sqm |
|---|
| 12 | 1.11 | 12/15mm thick plaster with 1:6 cement and fine sand of 1.25 F.M. Mortar including supply of all matarials, labours and T&P rtc. Required for proper completion of the work. | BI01010001010000000000000515BI0100001123 | 300 | Sqm |
|---|
| 13 | 1.12 | Fixing of M.S. angle iron door/ window/grill / ventilator frame made of approved M.S. Iron including drilling holes welding and hinges of required size , nut & bolt etc. as per drawing for proper completion of work at site. | BI01010001010000000000000515BI0100001124 | 700 | Kg |
|---|