| 1 | 1 | Item Description | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work , 80 mm dia nominal bore . | BI01010001010000000000000515BI0100001113 | 600 | metre |
|---|
| 3 | 1.02 | Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c cutting and making good the walls etc. Internal work - Exposed on wall , 32 mm dia nominal bore . | BI01010001010000000000000515BI0100001114 | 56 | metre |
|---|
| 4 | 1.03 | Providing and fixing Adjustable Raingun (sprinkler) assembly , brass nozzle rain gun having minimum throw of 35 metres (radius) of approved brand and quality as per instruction of Engineer-in-charge. | BI01010001010000000000000515BI0100001115 | 14 | each |
|---|
| 5 | 1.04 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 80 mm nominal bore. | BI01010001010000000000000515BI0100001116 | 2 | each |
|---|
| 6 | 1.05 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete : 50 to 80 mm nominal bore . | BI01010001010000000000000515BI0100001117 | 14 | each |
|---|
| 7 | 1.06 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | BI01010001010000000000000515BI0100001118 | 13 | cum |
|---|
| 8 | 1.07 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20\nmm nominal size). | BI01010001010000000000000515BI0100001119 | 4 | cum |
|---|
| 9 | 1.08 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | BI01010001010000000000000515BI0100001120 | 4 | cum |
|---|
| 10 | 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts. | BI01010001010000000000000515BI0100001121 | 55 | sqm |
|---|
| 11 | 1.1 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Hot rolled deformed bars. | BI01010001010000000000000515BI0100001122 | 560 | kilogram |
|---|
| 12 | 1.11 | Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (New work) : 80 mm nominal bore. | BI01010001010000000000000515BI0100001123 | 14 | each |
|---|
| 13 | 3 | Total impact of GST for the purpose of CTC | Total impact of GST for the purpose of CTC | 1 | Nos |
|---|