Supply & Installation Of Cctv Cameras At C&M - Stores
Tender Overview
Project Description
Supply & Installation Of Cctv Cameras At C&M - Stores - 2 Ip Ptz Camera 3 Ip Bullet Camera 4 32 Channel Nvr 5 Hard Disk 6 28-Port Gigabit Poe Smart Managed Switch 7 8-Port Gigabit Poe Smart Managed Switch 8 8-Port Gigabit Poe Switch 9 48 Led Professional Display 10 6U Wall Mounted Communication Rack 11 9U Wall Mounted Communication Rack 12 6 Core Single Mode Fibre Cable Armoured – Outdoor 13 12 Port Fiber Patch Panels ( Liu ) Rack Mount Sc Fiber Patch Panel Fully Loaded With Pigtails. 14 Sc – Lc Sm Duplex Fiber Optic Patch Cord – 1 Mtrs 15 40Mm G.I Pipe Isi Marked 16 40Mm Hdpe Pipe ( Isi:4984 ) 17 Armourd Outdoor Cat6 Stp Cable 18 600Va On Line Ups With 30 Minutes Backup 19 3Core 2.5 Sqmm Armoured Power Cable 20 1” Isi Pvc Conduit Isi Marked 21 9 Mtrs Gi-Pole Mount With Provision For Camera 22 Ii. Works Portion 23 Laying Of Power Cable 24 Laying Of Ofc Cable 25 Laying Of Armourd Outdoor Cat-6 Cable 26 Concrete Cutting And Resurfacing 27 Laying Of Hdpe Pipe 28 Laying Of Gi-Pipe 29 Fiber Splicing 30 Installation Of 9 Mtr Pole Mount 31 Racks Installation 32 Installation Of Ups, Power / Utp Cable Termination, Switches Installation, Work Station Installation, Led Installation And Other Installations, Commissioning Of Total System And Integration With Software Of All The Cameras With Nvr Application ( Complete System ) 33 Iii. Comprehensive Maintenance Service Portion 34 Comprehensive Maintenance Service For 5 Years After Installation.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Jan-2021 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 25-Jan-2021 |
| 2 | 25-Jan-2021 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 29-Jan-2021 |
BOQ
| Name of Work:“SUPPLY & INSTALLATION OF CCTV CAMERAS AT C&M - STORES\" | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | I. SUPPLY PORTION | |||
| 2 | 1.01 | IP PTZ Camera | M1 | 2 | No. |
| 3 | 1.02 | IP Bullet Camera | M2 | 17 | No. |
| 4 | 1.03 | 32 Channel NVR | M3 | 2 | No. |
| 5 | 1.04 | Hard Disk | M4 | 8 | No. |
| 6 | 1.05 | 28-Port Gigabit PoE Smart Managed Switch | M5 | 2 | No. |
| 7 | 1.06 | 8-Port Gigabit PoE Smart Managed Switch | M6 | 8 | No. |
| 8 | 1.07 | 8-Port Gigabit PoE Switch | M7 | 5 | No. |
| 9 | 1.08 | 48\" LED Professional Display | M8 | 2 | No. |
| 10 | 1.09 | 6U wall mounted communication rack | M9 | 5 | No. |
| 11 | 1.1 | 9U wall mounted communication rack | M10 | 1 | No. |
| 12 | 1.11 | 6 Core Single Mode Fibre Cable Armoured – Outdoor | M11 | 500 | Mtr |
| 13 | 1.12 | 12 Port Fiber Patch Panels (LIU) Rack Mount SC Fiber Patch Panel Fully loaded with Pigtails. | M12 | 8 | No. |
| 14 | 1.13 | SC – LC SM Duplex Fiber Optic Patch Cord – 1 Mtrs | M13 | 30 | No. |
| 15 | 1.14 | 40mm G.I pipe ISI Marked | M14 | 200 | Mtr |
| 16 | 1.15 | 40MM HDPE Pipe(ISI:4984) | M15 | 300 | Mtr |
| 17 | 1.16 | Armourd Outdoor CAT6 STP cable | M16 | 1500 | Mtr |
| 18 | 1.17 | 600VA on line UPS with 30 Minutes Backup | M17 | 6 | No. |
| 19 | 1.18 | 3Core 2.5 Sqmm Armoured Power Cable | M18 | 500 | Mtr |
| 20 | 1.19 | 1” ISI PVC Conduit ISI Marked | M19 | 1500 | Mtr |
| 21 | 1.2 | 9 Mtrs GI-Pole Mount with Provision for Camera | M20 | 4 | No. |
| 22 | 2 | II. WORKS PORTION | M21 | ||
| 23 | 2.01 | Laying of Power Cable | M22 | 500 | Mtrs |
| 24 | 2.02 | Laying of OFC Cable | M23 | 500 | Mtrs |
| 25 | 2.03 | Laying of armourd outdoor Cat-6 Cable | M24 | 1500 | Mtrs |
| 26 | 2.04 | Concrete cutting and resurfacing | M25 | 200 | Mtrs |
| 27 | 2.05 | Laying of HDPE pipe | M26 | 300 | Mtrs |
| 28 | 2.06 | Laying of GI-Pipe | M27 | 200 | Mtrs |
| 29 | 2.07 | Fiber Splicing | M28 | 40 | No. |
| 30 | 2.08 | Installation of 9 Mtr Pole Mount | M29 | 4 | No. |
| 31 | 2.09 | Racks Installation | M30 | 6 | No. |
| 32 | 2.1 | Installation of UPS, Power/UTP Cable termination, Switches Installation, work station Installation, LED Installation and other installations, Commissioning of total system and Integration with software of all the Cameras with NVR application (Complete system) | M31 | 1 | Lot |
| 33 | 3 | III. COMPREHENSIVE MAINTENANCE SERVICE PORTION | M32 | ||
| 34 | 3.01 | Comprehensive maintenance service for 5 years after installation. | M33 | 20 | Quarter |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender