National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Consultancy Services For Ae For Supervision Of Improvement Of Existing Road To 2 Laning With Hard Shoulders Of Maram- Peren Section ( Package-Ia , Ib , Iia , Iib , 3A And 3B ) On Nh-129A In The State Of Manipur On Epc Mode .. Submission Date for this Tender is 22-02-2021. Consultancy Service Tenders in Manipur Manipur. Bidders can get complete Tender details and download the document.
Name of Work: CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: i) Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IA, length- 22.340 Km) from Design Chainage 0.000 km to 22.340 Km on NH-129A in the State of Manipur on EPC Mode. (ii) Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IB, length- 17.660 Km) from Design Chainage 22.340 Km to Km 40.000 on NH-129A in the State of Manipur on EPC mode. (iii) Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. (iv) Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram- Peren section (Package-IIB , length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 on NH-129A in the State of Manipur on EPC mode (v) Improvement of existing road to 2 laning with Hard Shoulders of MaramPeren section (Package-3A, length- 12.35 Km) from Design Chainage 75.000 km to 87.350 Km on NH-129A in the State of Manipur on EPC Mode. (vi) Improvement of existing road to 2 laning with Hard Shoulders of MaramPeren section (Package-3B, length- 22.144 Km) from Design Chainage 87.350 km to 109.494 Km on NH-129A in the State of Manipur on EPC Mode. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Remuneration for Local Staff (inclusive of per Diem allowance) | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Team Leader Cum Senior Highway Engineer (1 No) 1*18=18 | BI01010001010000000000000515BI0100001113 | 18 | Man Months |
3 | 1.02 | Resident cum Highway Engineer (3 Nos) (3*18+2*60)=174 | BI01010001010000000000000515BI0100001114 | 174 | Man Months |
4 | 1.03 | Bridge/Structural Engineer (1 No)\n1*18=18 | BI01010001010000000000000515BI0100001115 | 18 | Man Months |
5 | 1.04 | Senior Pavement Specialist (3 Nos)\n3*18=54 | BI01010001010000000000000515BI0100001116 | 54 | Man Months |
6 | 1.05 | Senior Quality cum Material Expert (3 Nos)\n3*18=54 | BI01010001010000000000000515BI0100001117 | 54 | Man Months |
7 | 1.06 | Road Safety Expert (3 Nos)\n3*18=54 | BI01010001010000000000000515BI0100001118 | 54 | Man Months |
8 | 1.07 | Sub-Professional Staff | BI01010001010000000000000515BI0100001119 | ||
9 | 1.08 | Survey Engineer (3 Nos)\n3*18=54 | BI01010001010000000000000515BI0100001120 | 54 | Man Months |
10 | 1.09 | Assistant Bridge Engineer (3 Nos)\n(3*18+ 1*30)=84 | BI01010001010000000000000515BI0100001121 | 84 | Man Months |
11 | 1.1 | Assistant Quality cum Material Engineer (3 Nos)\n(3*18+ 1*30)=84 | BI01010001010000000000000515BI0100001122 | 84 | Man Months |
12 | 1.11 | Lab Technician (3 Nos)\n3*18=54 | BI01010001010000000000000515BI0100001123 | 54 | Man Months |
13 | 1.12 | Quantity Surveyor (3 Nos)\n(3*18+ 1*60)=114 | BI01010001010000000000000515BI0100001124 | 114 | Man Months |
14 | 2 | Support Staff (inclusive of per diem allowance) | BI01010001010000000000000515BI0100001125 | ||
15 | 2.1 | Office Manager cum Accountant (3 Nos)\n(3*18+ 2*60)= 174 | BI01010001010000000000000515BI0100001126 | 174 | Man Months |
16 | 2.2 | Steno cum Computer Operator (3 Nos)\n(3*18+ 2*60)= 174 | BI01010001010000000000000515BI0100001127 | 174 | Man Months |
17 | 2.3 | Office Boy (3 Nos)\n(3*18+ 2*60)= 174 | BI01010001010000000000000515BI0100001128 | 174 | Man Months |
18 | 3 | Transportation (Fixed Costs) | BI01010001010000000000000515BI0100001129 | ||
19 | 3.1 | Innova/scorpio or equivalent (not more than 2 years old) (6 nos during Construction Period), \n6*18=108\nRate per month | BI01010001010000000000000515BI0100001130 | 108 | Months |
20 | 3.2 | Innova/scorpio or equivalent (not more than 2 years old) (2 nos during Maintenance period/DLP), \n2*60=120\nRate per month | BI01010001010000000000000515BI0100001131 | 120 | Months |
21 | 4 | Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete | BI01010001010000000000000515BI0100001132 | ||
22 | 4.1 | For 9 round trip to Employer's Head Office | BI01010001010000000000000515BI0100001133 | 18 | Nos |
23 | 4.2 | For 9 round trip to Employer's regional office. | BI01010001010000000000000515BI0100001134 | 18 | Nos |
24 | 5 | Office Rent (Fixed Costs) \nThe rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)\n | BI01010001010000000000000515BI0100001135 | ||
25 | 5.1 | During Construction period (3 Nos) \n3*18=54 | BI01010001010000000000000515BI0100001136 | 54 | Months |
26 | 5.2 | During Maintenance /DLP period (1 No)\n1*60=60 | BI01010001010000000000000515BI0100001137 | 60 | Months |
27 | 6 | Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month | BI01010001010000000000000515BI0100001138 | ||
28 | 6.1 | Office Supplies during construction period for 3 offices\n3*18=54 | BI01010001010000000000000515BI0100001139 | 54 | Months |
29 | 6.2 | Office Supplies during Maintenance /DLP period for 1 office\n1*60=60 | BI01010001010000000000000515BI0100001140 | 60 | Months |
30 | 6.3 | Drafting Supplies during construction period for 3 offices\n3*18=54 | BI01010001010000000000000515BI0100001141 | 54 | Months |
31 | 6.4 | Drafting Supplies during Maintenance /DLP period for 1 office\n1*60=60 | BI01010001010000000000000515BI0100001142 | 60 | Months |
32 | 6.5 | Computer Running Costs during construction period for 3 offices\n3*18=54 | BI01010001010000000000000515BI0100001143 | 54 | Months |
33 | 6.6 | Computer Running Costs during Maintenance /DLP period for 1 office\n1*60=60 | BI01010001010000000000000515BI0100001144 | 60 | Months |
34 | 6.7 | Domestic and International Communication during construction period for 3 offices\n3*18=54 | BI01010001010000000000000515BI0100001145 | 54 | Months |
35 | 6.8 | Domestic and International Communication during Maintenance /DLP period for 1 office\n1*60=60 | BI01010001010000000000000515BI0100001146 | 60 | Months |
36 | 7 | Office Furniture and Equipment (Rental)\nOffice furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc., | BI01010001010000000000000515BI0100001147 | ||
37 | 7.1 | During Construction period for 3 nos of offices\n3*18=54 | BI01010001010000000000000515BI0100001148 | 54 | Months |
38 | 7.2 | During Maintenance /DLP period for 1 no of office\n1*60=60 | BI01010001010000000000000515BI0100001149 | 60 | Months |
39 | 8 | Reports and Document Printing ( rate as per copy) | BI01010001010000000000000515BI0100001150 | ||
40 | 8.1 | Monthly reports\n(Design and Construction) | BI01010001010000000000000515BI0100001151 | 234 | Copy |
41 | 8.2 | Half yearly Reports | BI01010001010000000000000515BI0100001152 | 39 | Copy |
42 | 8.3 | Various others reports as provided in the Concession Agreement such as Completion Report | BI01010001010000000000000515BI0100001153 | 1 | LS |
43 | 9 | Road Survey Equipment, Rate per Km | BI01010001010000000000000515BI0100001154 | ||
44 | 9.1 | Surface defects detection and roughness measurement using Network Survey Vehicle | BI01010001010000000000000515BI0100001155 | 875.95 | Km |
45 | 9.2 | Pavement strength measurement using FWD | BI01010001010000000000000515BI0100001156 | 437.98 | Km |
46 | 9.3 | Bridge inspection using Mobile Bridge Inspection Unit | BI01010001010000000000000515BI0100001157 | 1.144 | Km |
47 | 9.4 | Road signs inspection using Retro Reflectometer | BI01010001010000000000000515BI0100001158 | 875.95 | Km |
48 | 10 | Contigencies\nA fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. \n(Fixed as Rs. 10,00,000) | BI01010001010000000000000515BI0100001159 | 1 | LS |