Consultancy Services For Ae For Supervision Of Improvement Of Existing Road To 2 Laning With Hard Shoulders Of Maram- Peren Section ( Package-Ia , Ib , Iia , Iib , 3A And 3B ) On Nh-129A In The State Of Manipur On Epc Mode ., Manipur-Manipur

National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Consultancy Services For Ae For Supervision Of Improvement Of Existing Road To 2 Laning With Hard Shoulders Of Maram- Peren Section ( Package-Ia , Ib , Iia , Iib , 3A And 3B ) On Nh-129A In The State Of Manipur On Epc Mode .. Submission Date for this Tender is 22-02-2021. Consultancy Service Tenders in Manipur Manipur. Bidders can get complete Tender details and download the document.




Tender Notice

26547306
Consultancy Services For Ae For Supervision Of Improvement Of Existing Road To 2 Laning With Hard Shoulders Of Maram- Peren Section ( Package-Ia , Ib , Iia , Iib , 3A And 3B ) On Nh-129A In The State Of Manipur On Epc Mode .
Open Tender
Indian
Manipur
Manipur
22-02-2021

Tender Details

Consultancy Services For Ae For Supervision Of Improvement Of Existing Road To 2 Laning With Hard Shoulders Of Maram- Peren Section ( Package-Ia , Ib , Iia , Iib , 3A And 3B ) On Nh-129A In The State Of Manipur On Epc Mode .

Key Value

Document Fees
INR 5900 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: i) Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IA, length- 22.340 Km) from Design Chainage 0.000 km to 22.340 Km on NH-129A in the State of Manipur on EPC Mode. (ii) Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IB, length- 17.660 Km) from Design Chainage 22.340 Km to Km 40.000 on NH-129A in the State of Manipur on EPC mode. (iii) Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. (iv) Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram- Peren section (Package-IIB , length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 on NH-129A in the State of Manipur on EPC mode (v) Improvement of existing road to 2 laning with Hard Shoulders of MaramPeren section (Package-3A, length- 12.35 Km) from Design Chainage 75.000 km to 87.350 Km on NH-129A in the State of Manipur on EPC Mode. (vi) Improvement of existing road to 2 laning with Hard Shoulders of MaramPeren section (Package-3B, length- 22.144 Km) from Design Chainage 87.350 km to 109.494 Km on NH-129A in the State of Manipur on EPC Mode.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Remuneration for Local Staff (inclusive of per Diem allowance) BI01010001010000000000000515BI0100001112
2 1.01 Team Leader Cum Senior Highway Engineer (1 No) 1*18=18 BI01010001010000000000000515BI0100001113 18 Man Months
3 1.02 Resident cum Highway Engineer (3 Nos) (3*18+2*60)=174 BI01010001010000000000000515BI0100001114 174 Man Months
4 1.03 Bridge/Structural Engineer (1 No)\n1*18=18 BI01010001010000000000000515BI0100001115 18 Man Months
5 1.04 Senior Pavement Specialist (3 Nos)\n3*18=54 BI01010001010000000000000515BI0100001116 54 Man Months
6 1.05 Senior Quality cum Material Expert (3 Nos)\n3*18=54 BI01010001010000000000000515BI0100001117 54 Man Months
7 1.06 Road Safety Expert (3 Nos)\n3*18=54 BI01010001010000000000000515BI0100001118 54 Man Months
8 1.07 Sub-Professional Staff BI01010001010000000000000515BI0100001119
9 1.08 Survey Engineer (3 Nos)\n3*18=54 BI01010001010000000000000515BI0100001120 54 Man Months
10 1.09 Assistant Bridge Engineer (3 Nos)\n(3*18+ 1*30)=84 BI01010001010000000000000515BI0100001121 84 Man Months
11 1.1 Assistant Quality cum Material Engineer (3 Nos)\n(3*18+ 1*30)=84 BI01010001010000000000000515BI0100001122 84 Man Months
12 1.11 Lab Technician (3 Nos)\n3*18=54 BI01010001010000000000000515BI0100001123 54 Man Months
13 1.12 Quantity Surveyor (3 Nos)\n(3*18+ 1*60)=114 BI01010001010000000000000515BI0100001124 114 Man Months
14 2 Support Staff (inclusive of per diem allowance) BI01010001010000000000000515BI0100001125
15 2.1 Office Manager cum Accountant (3 Nos)\n(3*18+ 2*60)= 174 BI01010001010000000000000515BI0100001126 174 Man Months
16 2.2 Steno cum Computer Operator (3 Nos)\n(3*18+ 2*60)= 174 BI01010001010000000000000515BI0100001127 174 Man Months
17 2.3 Office Boy (3 Nos)\n(3*18+ 2*60)= 174 BI01010001010000000000000515BI0100001128 174 Man Months
18 3 Transportation (Fixed Costs) BI01010001010000000000000515BI0100001129
19 3.1 Innova/scorpio or equivalent (not more than 2 years old) (6 nos during Construction Period), \n6*18=108\nRate per month BI01010001010000000000000515BI0100001130 108 Months
20 3.2 Innova/scorpio or equivalent (not more than 2 years old) (2 nos during Maintenance period/DLP), \n2*60=120\nRate per month BI01010001010000000000000515BI0100001131 120 Months
21 4 Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete BI01010001010000000000000515BI0100001132
22 4.1 For 9 round trip to Employer's Head Office BI01010001010000000000000515BI0100001133 18 Nos
23 4.2 For 9 round trip to Employer's regional office. BI01010001010000000000000515BI0100001134 18 Nos
24 5 Office Rent (Fixed Costs) \nThe rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)\n BI01010001010000000000000515BI0100001135
25 5.1 During Construction period (3 Nos) \n3*18=54 BI01010001010000000000000515BI0100001136 54 Months
26 5.2 During Maintenance /DLP period (1 No)\n1*60=60 BI01010001010000000000000515BI0100001137 60 Months
27 6 Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month BI01010001010000000000000515BI0100001138
28 6.1 Office Supplies during construction period for 3 offices\n3*18=54 BI01010001010000000000000515BI0100001139 54 Months
29 6.2 Office Supplies during Maintenance /DLP period for 1 office\n1*60=60 BI01010001010000000000000515BI0100001140 60 Months
30 6.3 Drafting Supplies during construction period for 3 offices\n3*18=54 BI01010001010000000000000515BI0100001141 54 Months
31 6.4 Drafting Supplies during Maintenance /DLP period for 1 office\n1*60=60 BI01010001010000000000000515BI0100001142 60 Months
32 6.5 Computer Running Costs during construction period for 3 offices\n3*18=54 BI01010001010000000000000515BI0100001143 54 Months
33 6.6 Computer Running Costs during Maintenance /DLP period for 1 office\n1*60=60 BI01010001010000000000000515BI0100001144 60 Months
34 6.7 Domestic and International Communication during construction period for 3 offices\n3*18=54 BI01010001010000000000000515BI0100001145 54 Months
35 6.8 Domestic and International Communication during Maintenance /DLP period for 1 office\n1*60=60 BI01010001010000000000000515BI0100001146 60 Months
36 7 Office Furniture and Equipment (Rental)\nOffice furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc., BI01010001010000000000000515BI0100001147
37 7.1 During Construction period for 3 nos of offices\n3*18=54 BI01010001010000000000000515BI0100001148 54 Months
38 7.2 During Maintenance /DLP period for 1 no of office\n1*60=60 BI01010001010000000000000515BI0100001149 60 Months
39 8 Reports and Document Printing ( rate as per copy) BI01010001010000000000000515BI0100001150
40 8.1 Monthly reports\n(Design and Construction) BI01010001010000000000000515BI0100001151 234 Copy
41 8.2 Half yearly Reports BI01010001010000000000000515BI0100001152 39 Copy
42 8.3 Various others reports as provided in the Concession Agreement such as Completion Report BI01010001010000000000000515BI0100001153 1 LS
43 9 Road Survey Equipment, Rate per Km BI01010001010000000000000515BI0100001154
44 9.1 Surface defects detection and roughness measurement using Network Survey Vehicle BI01010001010000000000000515BI0100001155 875.95 Km
45 9.2 Pavement strength measurement using FWD BI01010001010000000000000515BI0100001156 437.98 Km
46 9.3 Bridge inspection using Mobile Bridge Inspection Unit BI01010001010000000000000515BI0100001157 1.144 Km
47 9.4 Road signs inspection using Retro Reflectometer BI01010001010000000000000515BI0100001158 875.95 Km
48 10 Contigencies\nA fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. \n(Fixed as Rs. 10,00,000) BI01010001010000000000000515BI0100001159 1 LS
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail