| 1 | 1 | Loading /Unloading of Transformers from Lorry to the Stores yard and stacking various capacities up to 40 KVA | | 10 | Nos |
|---|
| 2 | 2 | Loading /Unloading of Transformers from Lorry to the Stores yard and stacking 63 KVA to 200 KVA | | 100 | Nos |
|---|
| 3 | 3 | Loading /Unloading of Transformers from Lorry to the Stores yard and stacking above 200 KVA | | 75 | Nos |
|---|
| 4 | 4 | Loading /Unloading of Metering Sets from Lorry to the Stores Yard and Stacking Various capacities in 11KV and 22 KV | | 20 | Nos |
|---|
| 5 | 5 | Unloading of Conductor drum from Lorry, leading and stracking yard | | 300 | Drum |
|---|
| 6 | 6 | Leading of Conductor drum to Lorry leading point and loading | | 300 | Drum |
|---|
| 7 | 7 | Uncoiling the Conductor drum, bundling and transporting to weighing scalem weighing and transporting to godown and stacking | | 300 | KM |
|---|
| 8 | 8 | Loading/Unloading of RS Joists Materials | | 100 | MT |
|---|
| 9 | 9 | Loading/Unloading of Iron & Steel Materials | | 100 | MT |
|---|
| 10 | 10 | Lifting, Leading to Weighing Scale, Weighing & Stacking of Iron & Steel Materials | | 100 | MT |
|---|
| 11 | 11 | Loading/Unloading of Line Materials ( Structure Materials, X-Arm, Stay Set, G.I Wire, Stay Wire, Earth Pipe, Bolt&Nut, G.I Pin ) | | 1000 | MT |
|---|
| 12 | 12 | Loading/Unloading of 1phase, 3phase Meters | | 10000 | Box |
|---|
| 13 | 13 | Loading/Unloading of HT Metering Box , LTCT Metering Box & Battery Charger | | 10 | Nos |
|---|
| 14 | 14 | Loading /Unloading of chokes, LTCT's, LT LAS, Fuse Unit, Hut Service Kit and Other Items with Individual Packing | | 100 | Each |
|---|
| 15 | 15 | Loading/Unloading of L.T Pin Insulators, Guy Shackle, L.T Shackle and verification | | 5000 | Nos |
|---|
| 16 | 16 | Loading/Unloading of Crates with 11/22/33 KV Disc, 11/22/33 KV Pin Insulators verifying and stacking | | 8000 | Crate |
|---|
| 17 | 17 | Loading/Unloading & Stacking of Oil drums with Oil | | 60 | Drum |
|---|
| 18 | 18 | Loading/Unloading & Stacking of Paint Container with Paint | | 200 | Container |
|---|
| 19 | 19 | Loading/Unloading of L.T Open Type fuse unit 11/22 KV H.G Fuse Set | | 400 | Each |
|---|
| 20 | 20 | Unpacking,Verifying, Counting and repacking, Stacking of Meters, LAS, Chokes, Fuse Unit and Others | | 10000 | Each |
|---|
| 21 | 21 | Unpacking, Verifying, Counting and repacking, Stacking of Insulators, G.I Pin, Hardware and Others | | 8000 | Nos |
|---|
| 22 | 22 | Loading/Unloading of all size of Tyres, LT/HT, Trivector Meters, Inoor C.T and Stacking | | 50 | Each |
|---|
| 23 | 23 | Lifting, Leading to Weighing Scale, Weighing , Releading to Stacking Point and Stacking of all Scrap Materials including Copper, Aluminium etc | | 100 | MT |
|---|
| 24 | 24 | Unloading of all kinds of Scrap from Lorry, Weighing and Stacking | | 100 | MT |
|---|
| 25 | 25 | Loading of all kinds of Scraps to Lorry | | 100 | MT |
|---|
| 26 | 26 | Unpacking, Verifying and Repacking, Stacking of M.S Bolt & nut and Others | | 100 | MT |
|---|
| 27 | 27 | Uncoiling, Measuring, Recoiling and Stacking of PVC Cable 2.65 Sq.mm & 6.00 Sq.mm,50 Sq.mm and Others | | 10 | Coil |
|---|
| 28 | 28 | Uncoiling, Measuring, Recoiling and Stacking of PVC Cable 50,95,120 Sq.mm and others | | 20 | Coil |
|---|
| 29 | 29 | Loading/Unloading & Stacking of PVC Cable - 2.65 Sq.mm, 6.00 Sq.mm and 25 Sq.mm | | 15 | Coil |
|---|
| 30 | 30 | Loading/Unloading & Stacking of PVC Cable - 50 Sq.mm, 95 Sq.mm and 120 Sq.mm | | 15 | Coil |
|---|
| 31 | 31 | Loading/Unloading & Stacking of 11 KV/22 KV AB Switch Double Pole | | 200 | Set |
|---|
| 32 | 32 | Loading/Unloading of Stationary Items at Transport Lorry Bundles upto 30 Kgs | | 5 | Bundle |
|---|
| 33 | 33 | Loading/Unloading of Stationary Items at Transport Lorry Bundles from 30 to 50 Kgs | | 5 | Bundle |
|---|
| 34 | 34 | Loading/Unloading of Stationary Items at Transport LorryBundles above 50 Kgs | | 5 | Bundle |
|---|
| 35 | 35 | Unpacking, Verifying , Recpacking, Stacking of Stationary Items at Stores Bundles Upto 30 Kgs | | 5 | Bundle |
|---|
| 36 | 36 | Unpacking, Verifying , Recpacking, Stacking of Stationary Items at Stores Bundles from 30 to 50 Kgs | | 5 | Bundle |
|---|
| 37 | 37 | Unpacking, Verifying , Recpacking, Stacking of Stationary Items at Stores Bundles above 50 Kgs | | 5 | Bundle |
|---|
| 38 | 38 | Loading/Unloading of Empty Drums - Wooden Drum | | 10 | Each |
|---|
| 39 | 39 | Loading/Unloading of Empty Drums - Steel Drum | | 5 | Each |
|---|
| 40 | 40 | Loading/Unloading of Shunt Capacitor | | 15 | Nos |
|---|
| 41 | 41 | Unpacking of Gunny Bags,Verifying & Stacking of SEC Wires, SEA Alu. Wire upto 30 Kgs | | 5 | KG |
|---|
| 42 | 42 | Unpacking of Gunny Bags,Verifying & Stacking of TC Fuse Wires | | 5 | KG |
|---|
| 43 | 43 | Unpacking, Counting, Verifying and Stacking of numbered Lead ( 100 Nos/Shell ) | | 500 | Shells |
|---|
| 44 | 44 | Loading/Unloading & Stacking of Cables in Wooden Drums | | 40 | Each |
|---|
| 45 | 45 | Loading/Unloading & Stacking of Cables in Steel Drums | | 10 | Each |
|---|
| 46 | 46 | Loading/Unloading of 6 Way Pillar box | | 5 | Each |
|---|
| 47 | 47 | Loading/Unloading of 4 Way Pillar box | | 5 | Each |
|---|
| 48 | 48 | Loading/Unloading of Mini Pillar box | | 5 | Each |
|---|
| 49 | 49 | Loading/Unloading of FRB Pillar box | | 5 | Each |
|---|
| 50 | 50 | Loading of V Trough | | 200 | Each |
|---|
| 51 | 51 | Unloading and Stacking of V Trough | | 200 | Each |
|---|
| 52 | 52 | Loading/Unloading & Stacking of Straight Joint/End Termination Kit | | 10 | Each |
|---|
| 53 | 53 | Loading/Unloading & Stacking of 3x400 Sq.mm UG Alu.Cable | | 5 | Drum |
|---|
| 54 | 54 | Loading/Unloading & Stacking of 4x240 Sq.mm UG Alu.Cable | | 5 | Drum |
|---|
| 55 | 55 | Loading/Unloading & Stacking of LT UG Cable 16 Sq.mm | | 10 | Drum |
|---|
| 56 | 56 | Loading/Unloading & Stacking of LT UG Cable 120 Sq.mm | | 10 | Drum |
|---|
| 57 | 57 | Loading/Unloading Outdoor CT/PT and Indoor CT/PT | | 5 | Nos |
|---|
| 58 | 58 | Leading, Weighing and Stacking of Transformer Oil Drums | | 10 | Drum |
|---|
| 59 | 59 | Loading/Unloading of Single Pole AB Switch Vertical Type Complete & 33 KV Centre Rotating Switch | | 50 | Sets |
|---|
| 60 | 60 | Loading/Unloading, Stacking GI Earth Pipe 40 mm 10' Long | | 300 | MT |
|---|
| 61 | 61 | Loading/Unloading , Stacking Batterry, Computer, Printer, UPS | | 50 | Each |
|---|
| 62 | 62 | Loading/Unloading, Stacking SMC Box & Pilfer Proof Box | | 50 | Each |
|---|
| 63 | 63 | Loading/Unloading, Stacking of 33 KV 1 x630 Sq.mm UG Alu.Cable | | 15 | Drum |
|---|
| 64 | 64 | Loading/Unloading, Stacking of Earth Rod 4' | | 20 | Sets |
|---|
| 65 | 65 | Loading/Unloading, Stacking of Earth Rod 10' | | 15 | Each |
|---|
| 66 | 66 | E.S.I. @3.25 % should be Entered by the Bidder | | 1 | Percentage |
|---|
| 67 | 67 | EPF 13% for labour charges | | 1 | Percentage |
|---|
| 68 | 68 | G.S.T. @18% should be Entered by the Bidder | | 1 | Percentage |
|---|