Supply, Installation, Testing And Commissioning Of 2 True On Line Ups, Each Of 20 Kva Capacity Connected In ( N Plus 1 ) Parallel Redundant Mode With Capability To Connect More Ups Units Of Same Capacity In Parallel Including Circuit Breakers, Com
Tender Overview
Project Description
Supply, Installation, Testing And Commissioning Of 2 True On Line Ups, Each Of 20 Kva Capacity Connected In ( N Plus 1 ) Parallel Redundant Mode With Capability To Connect More Ups Units Of Same Capacity In Parallel Including Circuit Breakers, Common Paralleling Bus Bar Panel, Isolation Transformers, Inter Connecting Cables, Copper Earth Conductors Etc As Per Detailed Specifications, The Rate Shall Also Include For Packing And Forwarding Charges, All Taxes Gst And Duties As Applicable And Insurance Charges For Contractor All Risk Policy Including Fire For Supply, Transit, Storage, Erection Testing And Commissioning Etc, Workmen Compensation Policy And Third Party Liability Policy As Per Terms And Conditions And Valid Till Virtual Completion, The Rate Shall Include For Supply Of Software Including Loading In The Pc To Be Provided By The Bank And Showing The Performance, You Are Requested To Quote Rate For 2 Ups Of 20Kva Sitc Of Each Battery Bank, For 30 Minutes Backup For 120 Kva Load ( On Each Bank ) At Power Factor As Specified In The Tender Including Battery Circuit Breaker, Battery Rack, Interconnecting Cables From Battery To Battery And From Ups To Battery Bank And All Other Materials As Required And Initial Charging ( Including Packing And Forwarding Charges, All Taxes And Duties As Applicable And Insurance Charges For Contractor All Risk Policy Including Fire For Supply, Transit, Storage, Erection Testing And Commissioning Etc, Workmen Compensation Policy And Third Party Liability Policy As Per Terms And Conditions And Valid Till Virtual Completion ) Please See Tender Document Especially Serial No 2 Of Part Ii Of Tender Document For Power Factor And Quote Rate Accordingly, Annual Comprehensive Maintenance Service Charges ( Payable On Half Yearly Basis On Rendering Satisfactory Service ) All Inclusive Comprehensive Annual Maintenance Service Contract Charges For The Ups System As In Item No 1 And 2 Above ( Excluding Replacement Cost Of Batteries After Warranty Pe
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Completed