Non Plan 2020-21 Or Construction Of Culvert At Km 10/550 Of Methurmba Chapparappadavu-Kuttur Road Non Plan 2020-21 Or Construction Of Culvert At Km 10/550 Of Methurmba Chapparappadavu-Kuttur
Tender Value
Ref. Documents
Estimated cost
Bid Submission
14 Jan 2021
0 days left
EMD
22041
Bank guarantee accepted
Document Fee
1945
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
TALIPARAMBA → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Non Plan 2020-21 Or Construction Of Culvert At Km 10/550 Of Methurmba Chapparappadavu-Kuttur Road Non Plan 2020-21 Or Construction Of Culvert At Km 10/550 Of Methurmba Chapparappadavu-Kuttur
BOQ
| Work Name:Non Plan 2020-21 OR : Construction of culvert at Km 10/550 of Methurmba Chapparappadavu-Kuttur road | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Culvert | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | 2.4.2.A : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br>\nCement Concrete Grade M-15 & M-20 - By Mechanical Means <br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | BI01010001010000000000000515BI0100001114 | 31.9 | cum |
| 3 | 1.02 | 3.13.1.B : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br>\n Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | BI01010001010000000000000515BI0100001115 | 48.32 | cum |
| 4 | 1.03 | 12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | BI01010001010000000000000515BI0100001116 | 13.292 | cum |
| 5 | 1.04 | 12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br>\nPCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | BI01010001010000000000000515BI0100001117 | 30.972 | cum |
| 6 | 1.05 | 12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br>\n RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | BI01010001010000000000000515BI0100001118 | 7.65 | cum |
| 7 | 1.06 | 12.8.1.C : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br>\n RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) | BI01010001010000000000000515BI0100001119 | 1.2 | cum |
| 8 | 1.07 | 12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | BI01010001010000000000000515BI0100001120 | 0.765 | MT |
| 9 | 2 | drain | BI01010001010000000000000515BI0100001121 | ||
| 10 | 2.01 | 12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br>\nOrdinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | BI01010001010000000000000515BI0100001122 | 97.5 | cum |
| 11 | 2.02 | 12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | BI01010001010000000000000515BI0100001123 | 19.5 | cum |
| 12 | 2.03 | 12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br>\nPCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | BI01010001010000000000000515BI0100001124 | 31.2 | cum |
| 13 | 2.04 | 12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br>\n RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | BI01010001010000000000000515BI0100001125 | 8.14 | cum |
| 14 | 2.05 | 12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | BI01010001010000000000000515BI0100001126 | 0.652 | MT |
AI Tender Summary
Tender Timeline
Jan 07, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedJan 14, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJan 18, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender