| 1 | 1 | Picking up and removing old bituminous layer or\nsand sealing coat from old black topped surface\nand cleaning the exposed surface by scraping and\nstacking the material as directed.\na) By manual means :\n(i)(i) From 25 mm to 50 mm thick. | 1 | 150.577 | sqm |
|---|
| 2 | 2 | Water Bound Macadam Base Course Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). Grading-I Aggregate (63 mm to 45 mm) Using Stone Screening Type B (11.2 mm) , Manual Means. | 2 | 15 | Cum |
|---|
| 3 | 3 | Maintenance of Bituminous surface road\ni) Repair to pot holes by removal of failed material, trimming the sides to vertical and leveling the bottom, cleaning the same with compressed air or any appropriate method filled with B.M (thickness not more than 75 mm in single layer) applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per technical specifications Clauses 502 and 503 for Rural Roads of MORD. | 3 | 0.598 | Cum |
|---|
| 4 | 4 | Prime Coat: Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specification for Road & Bridge Works of MoRT&H (5th Revision). For WBM / WMM Surface:(with primer @ 0.85 kg/sqm) | 4 | 150 | sqm |
|---|
| 5 | 5 | Tack Coat: Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).On Bituminous Surface(with primer @ 0.225 kg/sqm) | 5 | 1200 | Sqm |
|---|
| 6 | 6 | Providing and laying bituminous macadam with Mobile Hot Mix Plant (Light Duty) using approved crushed aggregates of specified grading as per Table 500.4 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature by means of approved and suitable arrangements to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Specifications for Road & Bridge Works of MoRT&H (5th Revision). For Grading II, 50mm-75mm thick. | 6 | 45 | Cum |
|---|
| 7 | 7 | Providing & laying Semi-dense Bituminous Concrete (SDBC) as wearing coarse by Hot Mix Plant, using coarse aggregates, fine aggregates, filler materials\nand binder of required specification and grading as per approved job mix formula, over thoroughly cleaned surface coated with tack coat, including\nscreening, cleaning of aggregates, mixing the components as per approved Job Mix Formula with hot binder, carrying the mixture by tipper truck or\nany other approved suitable arrangements, laying the mixture uniformly, maintaining the specified laying temperature, thorough rolling with power roller with necessary hand packing and pinning to give an uniform surface to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, including the cost and carriage of aggregates, filler and binder, heating the binder, preheating the aggregates, and filler to the specified temperature, including the hire charges of Hot Mix Plant and other machineries, pay of operators, cost of fuel and lubricants and all other incidental charges complete.\nB. For Grading 2\n(10 mm nominal size, 25-30 mm thick.)\n(iii) Using Drum mix Type HMP of minimum\ncapacity 40-60 TPH. | 7 | 18 | Cum |
|---|
| 8 | 8 | GST @ 12 % on Sl No 1 TO 7 | 8 | 1 | Total |
|---|
| 9 | 9 | Cess @ 1 % On Sl No to 8 | 9 | 1 | Total |
|---|