Defence Government Departments Closing in 0 days TDR #26458987

Dry Dock Repair And Maintenance Of Fast Attack Craft ( Fac ) Gaurav

Issued by Government Departments · Dry dockrepair work of the vessel to be carried ou, Gujarat
Tender Value
Ref. Documents
Estimated cost
Bid Submission
30 Jan 2021
0 days left
EMD
4 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Dry dockrepair work of the vessel to be carried ou → Gujarat
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Dry Dock Repair And Maintenance Of Fast Attack Craft ( Fac ) Gaurav

BOQ

Name of Work: < DRY DOCK REPAIR AND MAINTENANCE OF FAC GAURAV
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11DECK SIDE/HULL SIDE :-\n02 Nos Zinc anodes near buckets are required to replace with new one.\nItem11Job
22Bow Thruster system required to repair and made functional.\nA Parts to be replaced with new parts \nBearings seals, gaskets of bow thruster be replaced 02 NosItem21Job
33Winding motor insulation - 02 NosItem31Job
44Zinc anode and bow thruster impeller to be replaced 02 NosItem41Job
55Remote joystick to be made operational and calibrated for input / output signals. 01 SetItem51Job
66B Service to be carried out on the parts \ncomplete body servicing be carried out by removing sea growthItem61Job
77Bow landing door, door spindle required servicing. All hinges and doors rubber packing required replacing. Quick release system to be made functional.\nA Parts to be replaced with new parts \nHinges, bushes and doors rubber packing required to be replaced 02 SetItem71Job
88B Service to be carried out on the parts \nQuick release system to be made functional 01 NoItem81Job
99Bow landing door, co- door spindle required servicing and repairing 01 NoItem91Job
1010Under water Hull Maintenance, surface cleaning FRP work required.\nA Service to be carried out on the parts \nSurface cleaning is required to be carried out for entire hull 01 No \nItem101Job
1111Under water hull requires complete FRP repairing and lamination. 01 NoItem111Job
1212AFT deck guard railing wire required to replace (Approx. 15 feet).\nThe locking system of the guard wires, also to be repaired. \nA Parts to be replaced with new parts \nAFT deck guard railing wire required to be replaced 15 feet (Approx.)Item121Job
1313B Service to be carried out on the parts \nThe locking system of the guard wires, also to be repaired. 06 NosItem131Job
1414In side passenger cabin and pilothouse side wall required lamination and FRP work.\nItem141Job
1515Anchoring system required to repair. \nA Service to be carried out on the parts \nAnchor system required to be servicing and to be functional 01 NoItem151Job
1616Chain and motor be serviced and defective parts be replaced.Item161Job
1717Defective 04 Nos cleats required to be repaired wherever required.Item171Job
1818Complete 40 Mtr all round side fenders to be replacedItem181Job
1919Under water proper pigment coating work required along with cleaning\nA Service to be carried out on the parts \nUnder water cleaning and removing marine growth and surface fining 01 NoItem191Job
2020Under water proper pigment coating work required 01 NoItem201Job
2121Trim tab system (02 Nos motor operational on each side) required to be made functional and calibrated with wheelhouse control panel.\nA Service to be carried out on the parts \nTrim tab system required to be made operational (Motor operated trim tab system on each side) and calibration is required to be carried out. 02 NoItem211Job
2222FRP body repair work required at the lower portion of bullet proof cabin- all aroundItem221Job
2323FWD & AFT main door stopper system, locking system, door line level, door rubber packing required replacing.\nA Parts to be replaced with new parts \nDoor lever, door rubber, door locks and packing required replacing- 02 SET \n\nItem231Job
2424B Service to be carried out on the parts \nFWD & AFT main door stopper system and locking system required to be repaired 02 Set \nItem241Job
252506 Nos hatches defective rubber packing to be replaced and modification in hatches locking portion to be inter-rotated, for making the hatches water tight.\nA Parts to be replaced with new parts \n Hatches defective rubber packing to be replaced 06 Nos \nItem251Job
2626B Service to be carried out on the parts \n Hatches locking portion to be inter-rotated to be made, for making the hatches water tight. 01 No \nItem261Job
2727Pilot cabin, passenger cabin seat chair or hand rest support plywood which is defective, required replace.\nA Parts to be replaced with new parts \ni Defective Pilot cabin, passenger cabin seat chair or hand rest support plywood to be replaced 16 Nos \nItem271Job
2828B Service to be carried out on the parts \ni Pilot cabin, passenger cabin seat chair or hand rest support are required to be repaired 16 Nos \nItem281Job
2929All side window glasses curtain required.\nA Parts to be replaced with new parts \ni All side window glasses curtain required new fitting 10 Nos \nItem291Job
3030Curtain holder required to be installed 10 NosItem301Job
3131Pilot cabin plastic Almirah lock system to be repaired.Item311Job
3232Pump/motor fitted with all sink/basin required to repair.\nA Parts to be replaced with new parts \n Defective pump / motor spares to be replaced 01 Set \nItem321Job
3333B Service to be carried out on the parts \ni Pump/motor & grinder fitted at sink/basin required to repair. 01 Set \nItem331Job
3434Both side wiper Assy required checking and defective items to be replaced including blades.\nA Parts to be replaced with new parts \n Wiper Motor, blade and holder to be replaced 02 Nos \nItem341Job
3535B Service to be carried out on the parts \n Wiper Motor required to be repaired 02 Nos \nItem351Job
3636ENGINE SIDE \nMain Engine make MAN 800 BHP PORT/STBD side found completed Run-Hrs 2914 Hrs respectively. Both the main engine required servicing as per Run-Hrs covered. Other maintenance of Main engine and its system to be carried out. Defective sensors replacement. Defective silencer pipes / muffler’s replace / re-insulation if any is required \nInjector calibration & fuel pump pressure checking is required.\nEngine Srl No. 41039548143955 (Port)\nEngine Srl No. 41039548063955 (Stbd)\nA Parts to be replaced with new parts\n Fuel filters, fuel pre-filter and lub oil filters of both engine replaced 02 Nos\n \nItem361Job
3737Engine oil both engine be replaced -02 NosItem371Job
3838Air cleaner element - 02 NosItem381Job
3939Replace all hoses for coolant and sea water- 02 setItem391Job
4040Replace both valve covers on expansion tankItem401Job
4141Defective electrical wiring with harness & meters and sensors be replaced -02 setItem411Job
4242Main engine door rubber beat to be replaced- 02 setItem421Job
4343Oil separator repair/seal kit be replaced - 02 NosItem431Job
4444Water pump repair kit - 02 setItem441Job
4545Coolant be replaced - 02 setItem451Job
4646V belts be replaced - 02 setItem461Job
4747B Service to be carried out on the parts (Service of the parts to be carried out by manufacturers authorized /reputed service center/ yard)\ni. Fuel Pump ( Servicing & calibration and adjustment as per specified fuel pressure for marine engine regulation ) 02 Nos \nItem471Job
4848Injector (Calibration and pressure testing) - 12 NosItem481Job
4949Alternator service to be carried out and carbon brush, brush holders end cap, bearings to be replaced - 02 NosItem491Job
5050Starter Motor serving to be carried out and armature, field coil carbon brush, bush holder, bearings, solenoid switch be replaced - 02 NosItem501Job
5151Intercooler servicing and defective parts to be replaced - 02 NosItem511Job
5252Clean charge air cooler tube cluster and perform pressure test - 02 NosItem521Job
5353Engine alarms checking and functional - 02 NosItem531Job
5454Engine operation instruments servicing and be functional - 02 NosItem541Job
5555Resilient mounts of engine and gearbox checking and replace if any- 02 NosItem551Job
5656Alignment of shaft be carried out - 02NosItem561Job
5757Defective silencer pipes/ flange / muffler’s replace/re-insulation is required - 02 setItem571Job
5858Exhaust manifold & inlet manifold decarbonisation - 02 setItem581Job
5959Chemical cleaning of heat exchanger oil cooler etc.\nA Parts to be replaced with new parts \n Tube Bundle 02 Nos \nItem591Job
6060Seal - 04 NosItem601Job
6161Heat exchanger seal kit - 02 setItem611Job
6262Heat exchanger cooling water lines hose pipes - 02setItem621Job
6363B Service to be carried out on the parts \nChemical cleaning of heat exchanger & oil cooler be carried out - 02 Nos \nItem631Job
6464Defective Turbocharger to be replaced.\nA Parts to be replaced with new parts \n Defective turbo charger to be replaced 02 Nos \nItem641Job
6565B Service to be carried out on the parts \n Turbo charger be removed and new fitted and adjusted 02 Nos \nItem651Job
6666In seawater cooling line, valve and hosepipe of both main engine required checking and servicing, if found any defect need replacement. \nA Parts to be replaced with new parts \niSea water cooling valve of both main engine required to be replaced 04 Nos \nItem661Job
6767Sea water hose pipe of both main engine require to be replaced 02 SetItem671Job
6868B Service to be carried out on the parts \n Sea Water cooling line required to be serving and cleaning 02 Nos \nItem681Job
6969All retaining/non-retaining/delivery valves required servicing/repairing and if required replacing. Overboard discharge valve, sea suction valve to be overhauled and pressure tested \nA Parts to be replaced with new parts \niFlanges, wheels, gasket and nut and bolts of retaining valve, non-retaining valve/ discharge valve be replaced 01 Set \nItem691Job
7070B Service to be carried out on the parts \nAll retaining valve, non-retaining valve/ delivery valve required to repair. Defective valves be replaced 01 Set \nItem701Job
7171Overboard discharge valve, sea suction valve to be overhauled and pressure tested 01 SetItem711Job
7272All bilge pumps and related pipelines in bilge suction need to be checked and serviced. Bilge pump control panel (Auto/Manual switch) at wheelhouse need to be serviced. Replacing of all sensors are required to make auto functional system.\nA Parts to be replaced with new parts \n Bilge suction pump required to be replaced with auto functional system 01 Set \nItem721Job
7373Defective pipes, flanges, gaskets, seals and nut and bolts are replaced- 01 setItem731Job
7474Defective sensor be replaced auto functional system - 01 setItem741Job
7575Service to be carried out on the parts \nBilge pump control panel both auto and manual switch be refitted and serviced. 01 Set \nItem751Job
7676Bilge pipeline need to be cleaned and serviced- 01 setItem761Job
7777Both side main engine water pump servicing by replacing the repair kit.\nA Parts to be replaced with new parts \nWater pump impeller, bushing, shaft, bearing, gasket be replaced 02 Nos \nItem771Job
7878B Service to be carried out on the parts \nBoth side water pumps are required to be serviced and refitted with alignment 02 Nos \nItem781Job
7979Both side drive shaft bearing required servicing and if required to be replaced.\nA Parts to be replaced with new parts \nDrive shaft bearings, seals and gasket to be replaced 02 NosItem791Job
8080B Service to be carried out on the parts \n Drive shaft required to be serviced and alignment to be made 02 Nos \nItem801Job
8181All fire alarm and horn system to be checked and be made operational.\nA Parts to be replaced with new parts \nWiring, switches, cables and sensors of fire alarm and horn system be replaced 01 Set \nItem811Job
8282B Service to be carried out on the parts \ni Fire alarm and horn system required to be repaired and to be operational and 01 Set \nItem821Job
8383All batteries required to be checked and to be replaced if required.\nA Parts to be replaced with new parts \nAll batteries, high tension cable, terminal to be replaced 07 Nos \nItem831Job
8484B Service to be carried out on the parts \n Batteries installed with proper terminals and insulation 07 Nos \nItem841Job
8585All hydraulic/lubricating hose pipe line required servicing and if defective to be replaced\nA Parts to be replaced with new parts \nHigh pressure hydraulic/ lubricating pipes be replaced 02 Set \nItem851Job
8686B Service to be carried out on the parts \nHigh pressure hydraulic/ lubricating pipes refitted with proper clamping systems 02 Set\nItem861Job
8787Engine room blowers required to repair/servicing.\nA Parts to be replaced with new parts \nBearing, gasket, bushes and seals and nut and bolts be replaced 01 Set \nItem871Job
8888B Service to be carried out on the parts \nEngine room blower required to be servicing and defective parts be replaced 02 Nos \nItem881Job
8989STEERING SYSTEM :- \nSteering and HDM system/oil seals to be checked and if required to be repaired & serviced.\nA Parts to be replaced with new parts \nOil seal, o ring, hydraulic oil be replaced 01 Set\nItem891Job
9090Interconnection hose pipe be replaced 01 SetItem901Job
9191Steering electrical line to be replaced 01 SetItem911Job
9292Insulation hose of electrical lines be replaced 01 SETItem921Job
9393All cables to be replaced 01 SetItem931Job
9494b. Service to be carried out on the parts \nSteering and HDM system required to be serviced 01 SETItem941Job
9595Potential meter to be calibrated -01 NoItem951Job
9696GEAR BOX MODEL NO. ZF- 360\nGear box 02 Nos accessories need servicing and defective spares/seals to be replaced.\nA Parts to be replaced with new parts \n shaft seal to be changed 02 Set\nItem961Job
9797Recommended Gear oil as per OEM to be replaced -02 setItem971Job
9898Gear oil filter be replaced - 02 setItem981Job
9999B Service to be carried out on the parts \nSolenoid valve checked and defective be serviced 04 Nos \nItem991Job
100100Gear oil cooler chemical cleaning 02 SetItem1001Job
101101PROPULSION UNIT \nMarine Jet Propulsion System (MJP) needs servicing and defective spare parts like seal/bushes to be changed. Buckets and hub housing gap to be checked for maintaining necessary gaps. The impeller clearance to be checked and servicing.\n A Parts to be replaced with new parts \nShaft Seals, bushes of propulsion unit be replaced 02 Set \nItem1011Job
102102All oil seals, water seals to be changed in MJP system - 02 setItem1021Job
103103All filters required to change in MJP system - 02 setItem1031Job
104104Graphite seal need replacementItem1041Job
105105B Service to be carried out on the parts \nMJP system required checking and defective items to be replaced. 02 Set \nItem1051Job
106106Hydraulic oil tank cleaning to be carried out- 02 setItem1061Job
107107Hydraulic pump to be serviced - 02 setItem1071Job
108108Both side hydraulic of MJP system required dismantling, cleaning and lubricating & and defective parts to be replaced - 02 setItem1081Job
109109Both sides shafting propulsion (jet system) gauging (Pressure / temperature) required to be checked and servicing. \nA Service to be carried out on the parts \nBoth sides shafting propulsion (jet system) gauging required be checking and calibrating and replacing if required. 02 Set \nItem1091Job
110110Shaft bearing to be inspected replace if found necessary 02 SetItem1101Job
111111All clearances to be checked and corrected as per OEM 02 SetItem1111Job
112112DG SET\n6.1/8 KVA indigenous service facilitated marine DG Set in the existing place replacement complete new installation including cooling system in place of existing place. \nA Parts to be replaced with new parts \n6.1/8 KVA indigenous service facilitated marine DG Set complete replment 01 No \nItem1121Job
113113B Service to be carried out on the parts \nD G set be installed and all harness connection for system and checking for proper working and adjusting including cooling system 01 No.\nItem1131Job
114114SPECIAL EQUIPMENT :-\nRadar system to be repaired. \nA Service to be carried out on the parts \nRadar system to be repaired. 01 No \nItem1141Job
115115Antenna, rotor unit need Servicing by authorised workshops and adjustment and defective parts be replaced. 01 NoItem1151Job
116116GPS system required checking/servicing and calibratedItem1161Job
117117In Multifunction display system, latest & updated version map-chart to be uploadedItem1171Job
118118All navigation light, deck light and police light to be made functional.\nA Parts to be replaced with new parts \n Defective bulbs, switches wiring be replaced 01 Set\nItem1181Job
119119B Service to be carried out on the parts \n All navigation light, deck light and police light to be made functional 01 Set \nItem1191Job
120120Display unit of engine to be made functional.\nA Parts to be replaced with new parts \nDefective unit harness be replaced 01 No \nItem1201Job
121121B Service to be carried out on the parts \nDisplay unit of engine required to be serviced and to be made functional. Defective parts be replaced 01 No \nItem1211Job
122122Echo sounder system required to be repaired.\nA Service to be carried out on the parts \nEcho Sounder found defective, wrong display and required to be repaired and calibrated for exact reading by authorized engineers 01 No\nItem1221Job
123123Remote operating weapon (ROW) system joystick is in operational and same needs to be repaired and system made operational.Item1231Job
124124Search light required repair.\nA Parts to be replaced with new parts \nDefective bulbs/ wiring be replaced 01 Set\nItem1241Job
125125B Service to be carried out on the parts \n Search light required to be repaired 01 No\nItem1251Job
126126Flood light required replace (LED)\nA Parts to be replaced with new parts \n Flood light required replace (LED) 02 Nos\nItem1261Job
127127B Service to be carried out on the parts \n Flood light fitting and adjusting for rotary, movement. 02 Nos\nItem1271Job
128128Anemometer required replace.\nA Parts to be replaced with new parts \nAnemometer required replace 0 01 No \nItem1281Job
129129B Service to be carried out on the parts \n Anemometer fitting and adjusting 01 No \nItem1291Job
130130LIFE SAVING EQUIPMENT :-\nLife raft to be service and refilled.\nA Parts to be replaced with new parts \n Life jacket be replaced 16 Nos \nItem1301Job
131131B Service to be carried out on the parts \nLife raft to be serviced and refilled 02 Nos \nItem1311Job
132132All distress signals of the vessel should be serviced/ replaced.\nA Parts to be replaced with new parts \n Defective distress signals of the vessel be replaced 01 Set\nItem1321Job
133133B Service to be carried out on the parts \nAll distress signals of the vessel should be serviced 01 Set \nItem1331Job
134134FIRE FIGHTING EQUIPMENT :-\n10 Nos fire extinguisher required to be replaced.Item1341Job
135135All smoke detector and fire detector system required replacing.\nA Parts to be replaced with new parts \nSmoke detector to be replaced 04 Nos \nItem1351Job
136136Fire detector system required replacingItem1361Job
137137TANKs :- \nBlack water tank (Sewage tank) should be cleaned properly.\nItem1371Job
138138Toilet system required servicing \nA Service to be carried out on the parts \nToilet System be cleaning and serving and defective pipes, flanges, coupling, gasket be replaced 01 No \nItem1381Job
139139Both fuel tank, fuel line cleaning and delivery valve to be checked for any leakage and to be replaced if defective.\nA Parts to be replaced with new parts \nGasket, sealing be replaced and defective Valves, flanges and pipes be replaced 02 Set\nItem1391Job
140140B Service to be carried out on the parts \nFuel tank and fuel line be cleaning and leakage proof. Defective parts be replaced 02 Set \nItem1401Job
141141By modification a provision should be kept for cleaning the fuel tank.\nA Service to be carried out on the parts \nCleaning option be provide for cleaning of fuel tanks 02 Nos \nItem1411Job
142142Modification for Manual measurement of fuel tank level to be provide 01 NoItem1421Job
143143AC & VENTILATION :-\nMachinery room blower required checking and repairing. Toilet and cabin blower may be repaired.\nA Parts to be replaced with new parts \n Bearing, brushes , seals and gasket be replaced 01 Set \nItem1431Job
144144B Service to be carried out on the parts \n Machinery room blower required checking and repairing 01 Set \nItem1441Job
145145Toilet and cabin blower may be repaired. 01 SetItem1451Job
146146Both AC plant required complete repairing.\nA Parts to be replaced with new parts \nRefilling of Refrigerant Gas 01 Set \nItem1461Job
147147Defective valves, copper pipe, filters to be replaced-01 SETItem1471Job
148148B Service to be carried out on the parts \n Servicing of AC and make operational 01 Set \nItem1481Job
149149Leakage test be conducted and wiring be proper insulation - 01 SETItem1491Job
150150MISCELLANEOUS :-\nSeating chairs required repairing.\n02 Nos Bunk fans to be installed newly at the pilot cabin\n04 Nos Wall fans also to be installed at passenger cabin\nA Parts to be replaced with new parts \nNew bunk fans be installed at pilot cabins 02 Nos \nItem1501Job
151151New wall fans be installed at passenger cabins 04 NosItem1511Job
152152B Service to be carried out on the parts \n Seating chairs at passengers cabin and pilot cabins be repaired 18 Nos \nItem1521Job
15315301 Set Sea chest Non returning valves required replacement.Item1531Job
154154SS plates at bow to be replaced \nA Parts to be replaced with new parts \n S S plates fitted at bow be replaced 01 Set \nItem1541Job
155155B Service to be carried out on the parts \n Repair of replacement of SS plate carried out and fining 01 Set \nItem1551Job
156156Bushes of landing door to be replaced \nA Parts to be replaced with new parts \nLanding door bushes be replaced 01 No \nItem1561Job
157157B Service to be carried out on the parts \nLanding door serviced and adjusted 01 No \nItem1571Job
158158Both fuel gauges required replacing.\nVisual fuel pipe system may be installed outside the tank to check the fuel level. \nFuel tank and line required cleaning.\nA Parts to be replaced with new parts \ni Fuel gauges required to be replaced 02 Nos \nItem1581Job
159159B Service to be carried out on the parts \nFuel pipe line installed outside the tank checked. Defective pipes, seals and gasket be replaced. 02 Nos \nItem1591Job
160160Fuel tank and pipe line be clean and checked leakage free. Defective accessories be replaced 02 NosItem1601Job
161161All plumbing line of galley sink & toilet to be cleaned & made operational. Discharge motors to be serviced\nA Service to be carried out on the parts \n Plumbing line of galley and toilet be cleaned and serviced. Defective pipes, flanges, elbow, taps hoses and clamps be replaced 01 Set \nItem1611Job
162162Discharge motor be serviced and made operational. Defective parts be replaced 01 SetItem1621Job
163163Electrical Side :-\nInsulation resistance (Megger test) and original OEM recommended preventive maintenance to be carried out and the following electrical items should be made operational/functional :-\ni) All electrical machineries.\nii) Main switch board, LED light pilot cabin and passenger cabin required checking.\niii) Power and lighting circuit\niv) All electrical panel board required checking and be in functional condition.\nv) Cabin and toilet exhaust fan required checking.\nA Parts to be replaced with new parts \ni Defective Wiring, switches, buttons, panel board covers be replaced 01 Set\nItem1631Job
164164B Service to be carried out on the parts \nInsulation resistance be megger test and original as per OEM recommended for vessel 01 Set\nItem1641Job
165165All electrical machineries be checked and service and defective parts be replaced and should be operational - 01 SETItem1651Job
166166Electrical power wiring and lighting circuit be checked and replace damaged wiring, switches, boards, and other accessories- 01 SETItem1661Job
167167Main Switch board and all electrical panel board be checked the and servicing. Defective wiring, buttons, covers screws be replaced - 01 SETItem1671Job
168168Cabin and exhaust fans be checked and serving and made operational. Defective parts be replaced - 01 SETItem1681Job
169169All electrical connections including wiring, board, buttons, screw, bolts etc be insulated as per marine norms -01 SETItem1691Job
170170PAINTING \nAll above water painting as per vessel requirement \nA Service to be carried out on the parts \nAbove water level complete cleaning surface fining and lamination wherever required and fining and panting as per vessel requirement 01 No \n\nItem1701Job
171171All vessel outer body required painting\nA Service to be carried out on the parts \n Vessel outer body cleaning and complete paining in disruptive pattern as per original painting scheme 01 No \nItem1711Job
172172Under water hull painting with anti-fouling paints and primer \nA Service to be carried out on the parts \nUnder water hull surface cleaning and painting.\nPen guard HB primer (Epoxy primer) 01 Coat-100 Micron (DFT)\nSafeguard universal ES grey tie coat 01 Coat-100 Micron (DFT)\nSea Quantum pro-u light red- 01 coat-150 micron (DFT)\n(Silyl Acrylate Anti-fouling self-polishing paint)\nSea quantum pro-u-dark red -01 coat-150 micron (DFT)\n(Silyl acrylate anti-fouling self-polishing paint)\nMetal oxide paint & primer to jet units 01 No \nItem1721Job
173173MJP jet system/bucket & nozzle to be spray painted.\nA Service to be carried out on the parts \nBucket system completely surface cleaning, remove marine growth and spray painting 02 Nos \nItem1731Job
174174Propulsion nozzle cleaning and surface finishing checking and spray painting 02 NosItem1741Job
175175DOCKING AND PILOTING CHARGES :-\nInspection charges including IRS fees\nItem1751Job
176176Cost of Docking to carry out under water repair & painting etc & un-Docking. The dry dock repair work will be carried out by the firm at Lakkinala by making cradles and using heavy crane to lift/place the FAC on cradleItem1761Job

AI Tender Summary

OUR REF NO 26458987
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 30-01-2021
Authority
Authority Name Border Security Force
Work Description Dry Dock Repair And Maintenance Of Fast Attack Craft ( Fac ) Gaurav
Basic Detail
Tender No .WW/Bhuj /M/ 845/Dry Dock FACGaurav/2020/17950
Bidding Type Tender
Location
City Dry dockrepair work of the vessel to be carried ou
State Gujarat
Key Dates
Publish Date 31 Dec 2020
Submission Date 30 Jan 2021
Open Date 01 Feb 2021
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 4 Lakhs
Exemption Not Available
Document List
Tendernotice_1.pdf
F549DBE5-88CA-477C-A213-2465A3BB0E62.html
BOQ_637230.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 31, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 30, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 01, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

html

F549DBE5-88CA-477C-A213-2465A3BB0E62.html

xls

BOQ_637230.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders