Visakhapatnam Port Trust has published Hiring Along With The Manning , Operation N Maintenance Of One Number Suitable Grab Or Clamshell Dredger And Hopper Barge/S ( If Necessary ) For Carrying Out Maintenance Dredging Alongside/Infront Of Berths ( For Detail Desc . Refer Nit ) . Submission Date for this Tender is 03-02-2021. Marine Work Tenders in VPT Andhra Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 16-Jan-2021 | PREBID REPLIES-Hiring along with the manning, operation n maintenance of one number suitable Grab or clamshell dredger and hopper barge/s(if necessary) for carrying out maintenance dredging alongside/ | Other | 27-01-2021 |
2 | 20-Jan-2021 | CLARIFICATIONPREBID- Hiring along with the manning, operation n maintenance of one number suitable Grab or clamshell dredger and hopper barge/s(if necessary) for carrying out maintenance dredging alon | Other | 03-02-2021 |
3 | 22-Jan-2021 | CORRIGENDUM 2- Hiring along with the manning, operation n maintenance of one number suitable Grab or clamshell dredger and hopper barge/s(if necessary) for carrying out maintenance dredging alongside/ | Other | 03-02-2021 |
Name of Work: Hiring along with the manning, operation & maintenance of one number suitable Grab or clamshell dredger and hopper barge/s(if necessary) for carrying out maintenance dredging alongside/infront of berths in Inner Harbour and Outer Harbour and other areas of Visakhapatnam Port Trust | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | No.of Days / 6months | Units | |
1 | 1 | Rate for providing one number suitable Grab or Clamshell dredger having suitable bucket capacity to dredge 1000Cum per day of 10 hrs (i.e from 0700Hrs to 1700Hrs) along with barge hopper capacity of at least 1000Cum and necessary crew for operation for carrying out maintenance dredging alongside/ in front of berths and other areas in order to achieve (-)4.0 mtrs to (-) 21.00 mtrs with reference to CD without damaging the existing structures, fenders etc. and side casting the dredged materials at deeper water areas away from berth face including Mobilization & De- mobilization, Tugs, routine boat, fuel escalation and hire charges of all plant & equipment, man power, materials and consumables, fuel, lube oil, Port / Customs formalities, Port entry passes etc inclusive of all taxes, levies, tools, tackles etc., except GST.\n(Operation hours includes shifting, positioning and operations of dredger etc.and excludes the dumping operation of the hopper barge if any) | 60 | Per day of 10 hrs. | |
2 | 2 | Rate for extra hours of the dredger after 10 hours of working on that day if required by VPT: | 120 | Hrs |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail