Uttar Pradesh Jal Nigam-UPJN has published 15 Mld Sewage Treatment Plant And Other Related Associated Allied Appurtenant Works On Survey Design Build Operate And Transfer Basis For Kairana Town Distt Shamli. Submission Date for this Tender is 24-05-2021. Sewage Treatment Plant Tenders in Kairana Town Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 11-Jan-2021 | Revised NIT | Date | 18-01-2021 |
2 | 15-Jan-2021 | Date extend | Date | 01-02-2021 |
3 | 27-Jan-2021 | Revised DATE | Date | 17-02-2021 |
4 | 15-Feb-2021 | Revised DATE2 | Date | 08-03-2021 |
5 | 05-Mar-2021 | Revised DATE4 | Date | 08-04-2021 |
6 | 05-Mar-2021 | Revised DATE4 | Date | 08-04-2021 |
7 | 01-Apr-2021 | Revised DATE5 | Date | 10-05-2021 |
8 | 28-Apr-2021 | Revised Corrigendum 6 | Other | 10-05-2021 |
9 | 03-May-2021 | Corrigendum 7 | Other | 10-05-2021 |
10 | 07-May-2021 | Corrigendum 8 | Date | 24-05-2021 |
Name of Work: 15 MLD Sewage Treatment Plant (SBR Type), MPS, TES, I&D of drain and other related associated/ allied appurtenant works for Kairana Town, Distt. Shamli Under Namami Gange programme. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Survey, Investigation, Design, Construction, Supply & Erection of Equipment, Civil, Electro-Mechanical and Instrumentation Control with Works, including Testing, Commissioning of 15 MLD STP (SBR Technology) for Kairana Town with 25 KLD Septage Reciving Station. The scope of work also includes providing all materials, labour, T&P etc. and construction of substation building, Construction of administrative building having fully functional testing laboratory, PLC/SCADA Room, Power generation building, blower building and other buildings required for technology proposed, conference room suitable for atleast 15 people, toilet block, drinking water cooler. All office rooms including conference room will be Air Conditioned. The scope also includes Ancillary works like (i) M-30 100 mm thick CC approach roads 3.60 m wide(as required for site) and 1.5 m wide C.C. path ways with base concrete (1:4:8), (ii) 230 mm thick 1.8 M high boundary wall around the campus with gate above ground level. Boundary Wall Shall be RCC framed with RCC Columns at 3 m interval and RCC plinth beam, (iii) Water supply arrangement, (iv) Fire fighting arrangement, (v) Land scaping, (vi) Earth filling, (vii) Apex painting on all civil works, (viii) Site development, (ix) All Required furniture, (x) Suitable Solar Power Plant for auxiliary load for STP. MPS. TES. etc.\n | BI01010001010000000000000515BI0100001113 | 1 | Job |
2 | 2 | Main Sewage Pumping Stations(MPS) and TES each 16.00 MLD Capacity (average Flow) including Construction of wet well(wet Well will be designed for peak flow), construction of Valve chamber, Any other Item/work required for completion of this work, including supply of all material, labour,T&P etc.required for proper completion of work as per\ninstructions of Engineer-in-charge. | BI01010001010000000000000515BI0100001114 | 1 | Job |
3 | 3 | Construction of Screen Channels for MPS, including supply of all material, labour,T&P etc.required for proper completion of work as per instructions of Engineer-in-charge. | BI01010001010000000000000515BI0100001115 | 1 | Job |
4 | 4 | E/M Works suitable for 15 MLD Capacity MPS | |||
5 | 4.01 | Supply, installation, testing and commissioning of Suitable Size Sluice Gates for screen channels, incoming chamber and by pass arrangement (if any) with all accessories, labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001117 | 6 | Job |
6 | 4.02 | Supply, installation, testing and commissioning of Manually cleaned coarse bar screen with perforated platform with all accessories, labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001118 | 1 | Job |
7 | 4.03 | Supply, installation, testing and commissioning of Mechanically cleaned coarse bar screen with all accessories, labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001119 | 1 | Job |
8 | 4.04 | Supply, installation, testing and commissioning of Non clog sewage Submersible Pumping Plants of 1/4 of peak flow (P/4) with guide rail system and all accessories, labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001120 | 6 | Set |
9 | 4.05 | Supply of Non clog sewage Submersible Pumping Plants of 1/4 of peak flow (P/4) as Store Stand by with all accessories. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001121 | 2 | Set |
10 | 4.06 | Supply, installation, testing and commissioning of Suitable Size C.I.D.F. Main piping Valves for above pumping plants including riser pipes, delivery piping, dismantling joints, Enlarger, Tees, Bends, Duckfoot bends, distance pieces, Actuator operated Sluice Valve, Reflex Valve and other specials, nut bolts, washers, rubber packing, jointing material, other required hardware etc. with all labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001122 | 6 | Set |
11 | 4.07 | Supply, installation, testing and commissioning of Suitable size C.I.D.F. Common Header including Actuator operated sluice valves (for Delivery and By pass), Reflex Valves, dismantling joints, Tees, Bends, Distance pieces and other specials, nut bolts, washers, rubber packing, jointing material, other required hardware etc. with all labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001123 | 1 | Set |
12 | 4.08 | Painting on Pumping Plant, Main Piping Valves, Common Header etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001124 | 1 | Job |
13 | 4.09 | Supply, installation, testing and commissioning of Motor Control Panel having Incomer as per site requirement, 6 working and 1 spare outgoing for motor having Over Load Protection, Under Voltage Proection, Short Circuit Protection, Auto Phase Reversal etc with heavy duty VFD (150% over load for 60 Second at 50 degree Celcius) and 3 Auxillary feeder for miscellaneous Loads and integral APFC Panel, Automation (SCADA) Panel having redundant power supply and redundant CPU PLC (Cyber secure) with all accessories, labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. NOTE- All motorised sluice valve and other instruments as per requirement need to interface and control from the above said SCADA Panel. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001125 | 1 | Job |
14 | 4.1 | Supply, installation, testing and commissioning of direct online Electro-magnetic flowmeter with CVT, control cables and all accessories, labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001126 | 1 | Job |
15 | 4.11 | Supply, installation, testing and commissioning of Mono Rail Traveling Trolley Hoist with chain pulley block of required and adequate capacity and required lift with all accessories, labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001127 | 1 | Job |
16 | 4.12 | Supply and fixing of tools & tackles, fire extinguishers -2 Nos., electric resistance rubber sheets- as per requirement, steel chairs- 4 nos., steel almirah- 1no., fire bucket with stand- 1 set, steel tubular table- 1no., safety equipment(Gas Masks, rope, safety belt, first aid kit, oxygen cylinder etc. as recommended by CPHEEO) etc. with all accessories, labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001128 | 1 | Job |
17 | 4.13 | Survey, Design & SITC of Internal-external electrification & lighting having required Standard illumination level for panel rooms, pump house, staff quarter, campus etc. with required decorative fixtures, poles, lamps, distribution boards, wiring, points, High Mast, LED, fluorescent lamps, fans, exhaust fans, fittings etc. with all accessories, labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001129 | 1 | Job |
18 | 4.14 | Supplying and laying of Power wiring/Cabling of suitable size from Meter room to HT Panel to Transformer to LT Panel to Motor Control Center at MPS and STP Control Panel & as required anywhere including SS Junction Boxes, Cable tray etc(cable shall be buried with trenches) end termination,cable jointing, chequered plates etc. Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001130 | 1 | Job |
19 | 4.15 | Trial-run of MPS, STP, TES and other E&M Equipments for three months Complete in all respect as specified in Tender documents and as per site condition.(excluding electricity charges) Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001131 | 3 | Months |
20 | 5 | Design, Supply, Installation, Testing and Commissioning of Electro-mechanical and Instrumentation equipment and accessories suitable for TES (Treated Effluent Pumping Station) Complete in all respect as specified in Tender documents and as per site condition. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001132 | 1 | Job |
21 | 6 | Any other Electrical- Mechanical Item/Work required for proper completion of the Project. NOTE- 1. This Project is on DBOT basis so all required items/materials apart from above for completion of project shall be supplied and installed in above rates and No extra cost/Payment shall be made to the Firm. Cost of this item is included in Item 1.00 | BI01010001010000000000000515BI0100001133 | 1 | Job |
22 | 7 | Supply, Installation, Testing, Commissioning and 3 Months Trial and Run of (33/0.433)/(11/0.433) KV Electric Sub-station of suitable capacity for required total load of 15 MLD MPS, 15 MLD STP, 15 MLD TES including all other loads, Complete in all respect as specified in Tender documents and as per site condition. | BI01010001010000000000000515BI0100001134 | 1 | Job |
23 | 8 | Supply, Installation, Testing, Commissioning and 3 Months Trial and Run of Suitable capacity DG Set for MPS, STP and TES with AMF & Synchronising Panel as Alternative Power Complete in all respect as specified in Tender documents and as per site condition. | BI01010001010000000000000515BI0100001135 | 1 | Job |
24 | 9 | Supply, Installation , Testing, Commissioning and 3 Months Trial and Run of Online Continuous Effluent Monitoring System (OCEMS) for measurement of the parameters pH, COD, BOD, TSS having following range of analyzers alongwith fixtures complete in all respect as per CPCB Guidlines of STP: - PH: 0-14 BOD: 0 - 100 mg/L COD: 0 - 200 mg/L TSS: 0 - 500 mg/L Protection: IP 68 including Communication by RS 485, Panel, Sensor adopter Cable, Canopy with stand for Analyzer Display, Online Ammonical Nitrogen and Nitrogen Nitrate analyzer, Survillance system with Industrial grade IP camera alongwith PTZ feature, Night Vision, minimum 4 MP, 30x Optical Zoom with all required accessories like NVR/DVR with data storage for 01 month, Steel Poles, pole mount, junction box, mount adapter, cabling accessories etc and their connectivity to CPCB/SPCB, Amrut Directorate and U.P Jal Nigam Server at Contractor's responsibility complete in all respect at the outlet of the STP all accessories, labor, material, T&P etc. Complete in all respect as specified in Tender documents and as per site condition. | BI01010001010000000000000515BI0100001136 | 1 | Job |
25 | 10 | Implementation of Environmental Management Plan and ESHS-MSIP, as per Appendix 1 of Schedule 2 (Design Build Services) | BI01010001010000000000000515BI0100001137 | 1 | Job |
26 | 11 | Construction of MEP Building with all related works complete in all respect as per tender document & as per site condition. | BI01010001010000000000000515BI0100001138 | 1 | Job |
27 | 12 | Construction of Metering room & HT panel Room with all related works complete in all respect as per tender document & as per site condition. | BI01010001010000000000000515BI0100001139 | 1 | Job |
28 | 13 | Construction of Transformer yard with mild steel grill around it with barbed wire, with all related works complete in all respect as per tender document & as per site condition. | BI01010001010000000000000515BI0100001140 | 1 | Job |
29 | 14 | Construction of platform for Diesel Generator and Control room including mild steel grill around, shed over the generators and generator foundation with all related works complete in all respect as per tender document & as per site condition. | BI01010001010000000000000515BI0100001141 | 1 | Job |
30 | 15 | Construction of Staff Quarters (Type B -5 Nos, type A-3 Nos. And Type C-01 No.) with all related Electrical & Sanitation works complete in all respect as per tender document & as per site condition. | BI01010001010000000000000515BI0100001142 | 1 | Job |
31 | 16 | I & D Works for kairana drain including Survey, Investigation, Design, Construction, Supply & Erection of Equipment, including all related appurtenant works with laying of intercepting sewer line about 300 m length, carring capacity of peak discharge (16 MLD is average discharge) as per site condition.(In normal condition, RCC NP3 pipe and in subsoil water condition, D.I class K-7 pipe will be provided) Subsoil water condition shall be assessed by the bidder before quoting the rates. | BI01010001010000000000000515BI0100001143 | 1 | Job |
32 | 17 | Laying of Effluent Pumping main from Treated Effluent Pumping Station (TES) to Yamuna River and Mamor Lake \nSurvey, Design, Supply & laying of 600 mm size D.I. K-9 Socket spigot pipes, rubber rings jointing materials and specials from store to the work lowering the same in to the trenches up to depth 0 to 1.50 m below G.L. true to alignment and gradient including barricading of sie, traffic diversion arrangement, dismantling and Reinstatement of type of roads(as per site requirement), mechanical/ manual excavation, dewatering (as per site requirement), shoring & timbering with mild steel/ wooden planks, construction of required class beddings, construction of RCC/ brick masonry circular/ rectangular or precast manholes in accordance with the provisions laid down in latest version of IS 4111 (Part 1), refilling of trenches with proper compaction including disposal of surplus earth with in 8 km radius, cost of all jointing material, testing & commissioning etc. complete including supply of all material, labour, T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001144 | 1600 | m |
33 | 18 | Operation and Maintenance cost of MPS, STP, TES, I & D Works, Pumping main with all civil, Electrical-mechanical and instrumentation works, effluent chanel, appurtment and all other allied works for 15 years as per norms of CPHEEO manual of Sewerage and Sewage Treatment (year-2013) | BI01010001010000000000000515BI0100001145 | ||
34 | 18.01 | 1st year | BI01010001010000000000000515BI0100001146 | 1 | Job |
35 | 18.02 | 2nd year | BI01010001010000000000000515BI0100001147 | 1 | Job |
36 | 18.03 | 3rd year | BI01010001010000000000000515BI0100001148 | 1 | Job |
37 | 18.04 | 4th year | BI01010001010000000000000515BI0100001149 | 1 | Job |
38 | 18.05 | 5th year | BI01010001010000000000000515BI0100001150 | 1 | Job |
39 | 18.06 | 6th year | BI01010001010000000000000515BI0100001151 | 1 | Job |
40 | 18.07 | 7th year | BI01010001010000000000000515BI0100001152 | 1 | Job |
41 | 18.08 | 8th year | BI01010001010000000000000515BI0100001153 | 1 | Job |
42 | 18.09 | 9th year | BI01010001010000000000000515BI0100001154 | 1 | Job |
43 | 18.1 | 10th year | BI01010001010000000000000515BI0100001155 | 1 | Job |
44 | 18.11 | 11th year | BI01010001010000000000000515BI0100001156 | 1 | Job |
45 | 18.12 | 12th year | BI01010001010000000000000515BI0100001157 | 1 | Job |
46 | 18.13 | 13th year | BI01010001010000000000000515BI0100001158 | 1 | Job |
47 | 18.14 | 14th year | BI01010001010000000000000515BI0100001159 | 1 | Job |
48 | 18.15 | 15th year | BI01010001010000000000000515BI0100001160 | 1 | Job |
49 | 19 | Electricity and fuel charges during O&M for 15 Years: Guaranteed Energy Consumption in (KwH/MLD) for 15 MLD STP, 15 MLD TES and 15 MLD MPS. (Note:- The Bidder is required to enter Guaranteed Energy Consumption in (KwH/MLD). The figure 706275.00 is shown in the quantity column, which is the multiplication of 15 MLD- capacity of STP , 5475 days - the number of days over the 15 years, and Rs. 8.60 - the power unit rate. 706275.00=15*5475*8.60 is shown in the quantity column) | BI01010001010000000000000515BI0100001161 | 706275 | KwH/MLD |