| 1 | 1 | Dismantling the existing weathering course along with the pressed tiles and clearing the debris if any away from the site including cost of all labour, lead, lift, etc., complete as directed by the Engineer at site. | Item Code / 1 | 14 | Sq.m. |
|---|
| 2 | 2 | Dismantling the existing RCC roof slab and carefully stacking the retrieved materials if anyt useful for re-use and clearing the debris if any away from the site including cost of all labour, lead, lift, etc., complete as directed by the Engineer at site. | Item Code / 2 | 2 | Cu.m. |
|---|
| 3 | 3 | Dismantling the existing Doors & Windows including removal of frames, hinges and fastening and carefully stacking materials useful for re-use and clearing the debris if any away from the site including cost of all labour, lead, lift, etc., complete as directed by the Engineer at site. | Item Code / 3 | 7 | Sq.m. |
|---|
| 4 | 4 | Dismantling the existing Brick wall in cement / lime mortar and clearing the debris away from the site including cost of all labour, lead, lift, etc., complete as directed by the Engineer at site. | Item Code / 4 | 20 | Cu.m. |
|---|
| 5 | 5 | Dismantling the existing PCC Flooring Concrete and carefully stacking the retrieved materials if any useful for re-use and clearing the debris away from the site including cost of all labour, lead, lift, etc., complete as directed by the Engineer at site. | Item Code / 5 | 2 | Cu.m. |
|---|
| 6 | 6 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2 m in hard stiff clay, stiff black cotton soil, hard red earth, shale, murram, gravel, stony earth and earth mixed with small size boulders including cost of all labour, T&P, Transporting the excavated earth by haed load lead upto 100 m, including unloading in low level places of SS premises, etc., complete as directed by the Engineers at site. | Item Code / 6 | 160 | Cu.m |
|---|
| 7 | 7 | Filling with filling sand complying with standard specification for filling watering and compaction in layers for filling in foundation and basement including the cost of all labour, lead, lift, T&P etc., complete as directed by the Engineers at site. | Item Code / 7 | 20 | Cu.m |
|---|
| 8 | 8 | Providing Cement Concrete 1 : 4 : 8 using 40 mm HBG metal for levelling Concrete including the cost of all materials, lead, lift, labour, T&P etc., complete as directed by the Engineers at site. | Item Code / 8 | 20 | Cu.m |
|---|
| 9 | 9 | Providing RCC 1:1.5:3 using 12 to 20mm HBG metal for raft, plinth and wall concrete including form work, shuttering etc , cost of all materials, lead, lift, labour, centering charges, T&P etc., complete as directed by the Engineer at site but excluding the cost of steel reinforcement. | Item Code / 9 | 70 | Cu.m |
|---|
| 10 | 10 | Providing Cement Concrete 1 : 3 : 6 using 12 to 20 mm HBG metal including the cost of all materials, lead, lift, labour, T&P etc., complete as directed by the Engineers at site. | Item Code / 10 | 45 | Cu.m |
|---|
| 11 | 11 | Supplying, fabricating, placing and tying in position RTS / MS rods for reinforcement in RCC works including cost of all materials, straightening, cutting, bending, tying as per the standard specification and drawing, all lead, lift, etc., complete as directed by the Engineers at site | Item Code / 11 | 6000 | Kgs. |
|---|
| 12 | 12 | Supplying, fabricating, placing and tying in position Rail [ 90 lbs rail ] for Transformer including cost of all materials, straightening, cutting, and fixing in position as per the standard specification and drawing, all lead, lift, etc., complete as directed by the Engineers at site | Item Code / 12 | 320 | Kgs. |
|---|
| 13 | 13 | Providing Special Plastering with C.M. 1:3, 12 mm thick for plinth side wall and cable duct side wall, and all concrete surface including the cost of all materials, lead, lift, labour, T&P, scaffolding charge, etc., complete as directed by the Engineers at site. | Item Code / 13 | 330 | Sq.m |
|---|
| 14 | 14 | Colour washing the interior and exterior wall surface using approved good quality Acrylic Emulsion paint two coats over a coat of wall primer. Before painting the wall surface should be properly cleaned and the wall surface should be applied the approved quality wall putty neatly,[ patch work only ] etc, including cost of all materials, lead, lift, labour, scaffolding charge, etc., complete as directed by the Engineer at site. | Item Code / 14 | 330 | Sq.m |
|---|
| 15 | 15 | Providing R .C .C . 1 : 1.5 : 3. using 12 to 20 mm HBG metal for Cover Slab including the cost of all materials, lead, lift, labour, Centring charges, T&P etc., complete as directed by the Engineers at site but excluding the cost of Steel reinforcement. | Item Code / 15 | 10 | Cu.m |
|---|
| 16 | 16 | SGST PERCENTAGE IN FIGURES | Item Code / 16 | 1 | nos |
|---|
| 17 | 17 | CGST PERCENTAGE IN FIGURES | Item Code / 17 | 1 | nos |
|---|