Punjab State Power Corporation Limited-PSTCL has published Annual Overhauling Of Boiler Air Preheaters And Its Auxiliaries Of 1X210 Mw Unit 5 At Ggsstp Roopnagar. Submission Date for this Tender is 29-01-2021. Boiler Supply Tenders in SE/HQ GGSSTP Roopnagar Punjab. Bidders can get complete Tender details and download the document.
Name of Work:Annual overhauling of Boiler, Airpreheaters and its auxiliaries of 1X210 M.W. unit- 5 at GGSSTP Roopnagar. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | 1.1 LUMP SUM RATE for Annual overhauling of Boiler as per scope of work item no.1 of PART-III(A).\nNote:- Above scope of work includes welding of 500 nos. HP joints HP joints welded more/less than 500 nos. will be paid /recovered @ at sr. no.1.2 below. \n + 1.2 Rate for extra H.P. joint for tube size 44.5 to 76.1 mm dia of any thickness for the purpose of extra payment/ recovery. (Total amount for 1.1 to 1.2 from price breakup mentionerd here) | item1 | 1 | As per price breakup sheet |
2 | 2 | LUMP SUM RATE for Annual overhauling of wind box and its assemblies and pent house as per scope of work part-III (B). \nNote;- Above scope of work includes repair/ replacement of roof skin casing as detailed in scope of work upto 75 sq. mtr. area. \n | item2 | 1 | As per price breakup sheet |
3 | 3 | 3.1 LUMP SUM RATE for Annual overhauling of Airpreheaters as per scope of work PART-III(C).\nNote:- Above scope of work includes replacement of 80 no. Heating elements & 40 sq. mtr. of the duct & hoppers. Heating elements replaced more / less than 80 nos. will be paid / recovered @ at sr.no.3.2 below \n + 3.2 Rate for extra heating element replacement for the purpose of extra payment / recovery. + 3.3 Replacement of support bearing of APH as per detailed scope of work in item 1 of PART-III (D). +\n3.4 Replacement of set of pins of airpreheater rotor as per detail scope of work in item 2 of PART-III (D) (one set contain 346 pins in one APH) + 3.5 Replacement of expansion bellows of airpreheater out let primary air duct as per item 3(i) of scope of work Part-III(D) + \n3.6 Replacement of Expansion Bellow of Secondary air duct as per item 3(ii) of scope of work Part- III(D) \n + 3.7 Replacement of Expansion Bellow of Flue Gas duct as per item 3(iii) of scope of work Part- III(D). (Total amount for 3.1 to 3.7 from price breakup mentioned here) | item3 | 1 | As per price breakup sheet |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail