| 1 | 1 | Labour for boaring through any type of soll etc complete. \nFor depth up to250m for Top \nEnlargement of 300mm dia.(up to 50m)\n(i) First 50m.\n\n\n\n | | 50 | M |
|---|
| 2 | 2 | (ii) Next 50m. | | 50 | M |
|---|
| 3 | 3 | (iii) Next 50m. | | 50 | M |
|---|
| 4 | 4 | (iv) Rest 100m.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017\nP-51.Item-2.c(i-iv). | | 100 | M |
|---|
| 5 | 5 | Supply of ERWMS black pipe of approved make (heavy quality)........not less than 8mm thickness.\n(a) 300mm dia internal.\n\n | | 48.8 | M |
|---|
| 6 | 6 | (b) 200 mm dia internal.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-111.Item-17.B(i&ii). | | 126 | M |
|---|
| 7 | 7 | Supply of fibre glass reinforced Epoxy resin slotted of 1mm slot ...........as per direction of the EIC.\n200mm nominal dia.\n7.00 mm wall thickness\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-52.Item-7.c(ii).\n | | 36.6 | M |
|---|
| 8 | 8 | Supply of M.S male /female adopter of approved make & brand .......EIC 200mm dia\n P.W.D (S & P)W.C ll w.e.f 01/11/2017 .P- 52.Item-7(iii).\n | | 7 | M |
|---|
| 9 | 9 | Supply fitting & fixing heavy type bell month reducing socket.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-54.Item-17(v).\n | | 1 | NOS |
|---|
| 10 | 10 | Supply fitting & fixing G.I cap at Top\n300mm dia\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-54.Item-18(iv).\n | | 1 | NOS |
|---|
| 11 | 11 | Supply fitting & fixing M.S socket ring .\n(a)200mm dia. | | 26 | NOS |
|---|
| 12 | 12 | (b)300mm dia.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-54.Item-19(iii & iv)\n | | 7 | NOS |
|---|
| 13 | 13 | Welding in M.S Structural work with gas or electric Continuous weld.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-111.Item- B-2(b).\n | | 4500 | CM |
|---|
| 14 | 14 | Providing 200mm centre gulde with clamp.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-56.Item-28.(j)\n | | 1 | SET |
|---|
| 15 | 15 | Geo Physical investigation of the aquifer by elector logical system with all tools ......report.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-56.Item-29.\n | | 1 | SET |
|---|
| 16 | 16 | Providing & fixing Beep Plus including..........completc.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-56.Item-26.\n | | 1 | NOS |
|---|
| 17 | 17 | Supply fitting & fixing 300mm M.S Housing clamp.............quality.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017\nP-56.Item-27.\n | | 1 | SET |
|---|
| 18 | 18 | Packing the annual space between the outside of the tube well pipes & strainers and the bore ...........complete.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017\nP-55.Item-24.\n | | 40.5 | M³ |
|---|
| 19 | 19 | Supply of E.R.W.M.S black pipe of .......standard specification, 5mm thick,150mm dia (Internal).\nP.W.D (S & P)W.C ll w.e.f 01/11/2017\nP-111.Item-17A(ii).\n | | 36.6 | M |
|---|
| 20 | 20 | Packing the annular space between the outside of the housing pipe and the paddle day .......complete. \nP.W.D (S & P)W.C ll w.e.f 01/11/2017\nP-56.Item-25.\n | | 3 | M³ |
|---|
| 21 | 21 | Washing & developing tube well with air compressor pump & Engine for eight hours.........as required.\n P.W.D (S & P)W.C ll w.e.f 01/11/2017\nP-55.Item-20.\n | | 7 | DAY |
|---|
| 22 | 22 | Collecting sample of water for bacteriological test.........as per direction.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-55.Item-23.\n | | 1 | LS |
|---|
| 23 | 23 | Removal rubbish /Earth from the working site & disposal of the same beyond the compound.....of the EIC.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-12. Item-13.\n | | 10 | M³ |
|---|
| 24 | 24 | Labour for making arrangement for showing vertically test including the cost of hire charges-etc complete.\nP.W.D (S & P)W.C ll w.e.f 01/11/2017 P-55.Item-22.\n | | 1 | LS |
|---|
| 25 | 25 | Coating of Epoxy resin Araldite GY 257 & hardener......from chemical reaction.\nK.M.D.A(W.S)2012.P-120, Item-13.7\n | | 10 | M² |
|---|
| 26 | 26 | All types of C.I specials ........to I.S specification (a) Socket & Spigot ended. 80mm to 300 mm\n\n | | 80 | KG |
|---|
| 27 | 27 | (b)Flange socket /Spigot ended 80mm to 300 mm \nK.M.D.A(W.S)2012.P-93, Item-10.3 a(i)&b(i) | | 225 | KG |
|---|
| 28 | 28 | Lead joints C.I pipes and specials...........to I.S specification.\n 150mm dia.\nK.M.D.A(W.S)2012.P-64, Item-24 (d) (e)\n\n | | 2 | NOS |
|---|
| 29 | 29 | Centrifugally cast (pipe…………….coating class K7\n(a) 150 mm dia.\nK.M.D.A(W.S)2012.P-95, Item-B(b)\n | | 18 | M |
|---|
| 30 | 30 | Cutting of pipes for Fitting with C.I pipes ..........as per direction.\n150mm dia. \nK.M.D.A(W.S)2012.P-68, Item-2.7 c &d\n\n | | 5 | NOS |
|---|
| 31 | 31 | Flange joints to C.I/P.I pipes.... of the EIC \n200 mm dia.\n\n | | 2 | NOS |
|---|
| 32 | 32 | 150mm dia.\nK.M.D.A(W.S)2012.P-120, Item-2.6(c)(d) | | 18 | NOS |
|---|
| 33 | 33 | Withdrawing the sub. P/M set (upto 25HP) along with column pipes from the well after disconnection the all accessories for necessary Testing/checking/ repairing purpose. This item also included for nec. arrangement of chain pully blocks, tools, tackles and their transportation. Ref. : KMDA/EE(E/M0/FAWS-I/2w-128/2017-18/168 Dated 02-11-17 | | 1 | No |
|---|
| 34 | 34 | S&F straight through joint box including ferrule & other jointing materials making Joints and filling in with compound suitable for the following aluminum conductor underground PVC insulated cable of 1.1KV Grade as required. Ref. KMDA,P-40,Sl.1.1 | | 2 | nos |
|---|
| 35 | 35 | Transportation charges for taking the P/M set to the workshop/site where the rectification work will be done as per direction of EIC (from site to workshop to site) Ref. KMWSA/EE/FAWS-II/Elec./Spot/EMQ-65/13-14/126 Dt.02-12-13 | | 3 | nos |
|---|
| 36 | 36 | S&D at site (10) 163.9 mm outside dia and 150 mm inside dia meter 5.4 mm wall thickness 3.1 meter 100 mm long ERW column pipe. Ref: KMWSA/EE(M)/FAWS-I/Q-78(E) OF 2008-09 | | 2 | nos |
|---|
| 37 | 37 | S&D of submersible copper cable of 3 core 6 sq.mm 1100V grade flat cable Mk. Finolex. Ref. W.O. No EE(M)/FAWS-1/2W-207/8-9/432 dt.18-03-2009. | | 95 | Mtr. |
|---|
| 38 | 38 | S&D site/store of sub pumping machinery directly coupled with 3 Ph. 400V A.C 2900 RPM net winding type sub motor model no. BPHA/384/2B-HBC 203, head 30M,15 to 20HP , Mk. KSB or equiv. Ref. KMDA/EE(E/M/FAWS-I/2w-107/2017-18/130 dt. 21-02-18 | | 1 | no |
|---|
| 39 | 39 | S&F Well Cover MS with bolt nuts clamps etc. and necessary drilled holes. Ref. KMDA,P-7,Sl.S9 | | 1 | nos |
|---|
| 40 | 40 | Installation of pumping machinery with valve, pipe & specials short piece,depth gauge, Pressure guage including hoisting of column pipe, making all electrical and water line inter-Connection complete as per direction including supply of necessary materials as required forthe work. \nRef. KMDA/EE(E/M)/FAWS-I/2w-128/2017-18/168 dated 02-11-17 \n | | 1 | no |
|---|
| 41 | 41 | Dismantling all types of plain cement concrete……..directed. Up to 150 mm thick. Ref: P.W.D (Bldg) Sch. -2017, page -10 It- 2(a) | | 0.5 | M3 |
|---|
| 42 | 42 | Earth work in excavation in trenches .................of the E.I.C a) Upto 1.5 M below G.L PWD,Bldg sch-2017, P-1,Item - 2(a) | | 47.4 | M3 |
|---|
| 43 | 43 | Hire and labour charges 75 mm dia bamboo railing …………timber. Railing with 3 rows. Ref: P.W.D (Bldg) Sch. -2014, page -220, It- 35(a)(i) | | 15 | M |
|---|
| 44 | 44 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm............. complete. Ref: P.W.D (Bldg) Sch. -2017, page -2, It- 4(a) | | 4 | M3 |
|---|
| 45 | 45 | Lowering and type D.I pipes………….of the E.I.C. KMDA(WS)2012, P-63, IT-2.2.b,c&d (b) 150 mm dia. | | 18 | M |
|---|
| 46 | 46 | Rubber gasket joints to D.I pipes……of the E.I.C. KMDA(WS)2012, P-66, IT-2.5b,c&d,e,f(b) 150 mm dia. | | 2 | Each |
|---|
| 47 | 47 | Lowering fitting and fixing all types of valves………of the E.I.C. (b) 150 mm dia. KMDA(WS)2012’, P-81, IT-5.2, b,d,e,f.g | | 2 | Each |
|---|
| 48 | 48 | C.I. Sluice Valve cast iron double flanged …………..I.S 1538:1993 (b) 150 mm dia.KMDA(WS)2012’, P-99, IT-10.7, ii,iv,v,vi,vii | | 1 | Each |
|---|
| 49 | 49 | Dismantling all types of masonry …………………as directed.PWD(B),2017, P-10 It-2(a). | | 1 | M3 |
|---|
| 50 | 50 | Dewatering by pumps .........of the E.I.C. KMDA(WS)2012’, P-119, IT-13.1 | | 200 | HP/HR |
|---|
| 51 | 51 | Providing lighting arrangements…………….etc complete. Rate approved by HMC | | 1 | Night |
|---|
| 52 | 52 | Supplying including cost of installation of C.I Mechanical compression ………………C.I/D.I pipes. (e) 150 mm dia. [Ref:-K.M.D.A (ws)2012,Page-123,It-13.25]b,d,e,f,g | | 4 | EACH |
|---|
| 53 | 53 | Earth Work in filling in foundation trenches…………from excavation KMDA(WS)2012’, P-61, IT-1.2 | | 32.26 | M3 |
|---|
| 54 | 54 | GST 12% | | 1 | LS |
|---|
| 55 | 55 | Labour wellfare Cess 1% | | 1 | LS |
|---|