| 1 | 1 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | 1 | 50 | No |
|---|
| 2 | 2 | Loading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle). | 2 | 3 | No |
|---|
| 3 | 3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | 3 | 14 | Trip |
|---|
| 4 | 4 | Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km). | 4 | 70 | km |
|---|
| 5 | 5 | Drilling hole of various sizes on existing Channel/Cross Arm. | 5 | 75 | No |
|---|
| 6 | 6 | Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. | 6 | 15 | No |
|---|
| 7 | 7 | Cutting Channel/Cross Arm/Angle Iron into two pieces. | 7 | 2 | No |
|---|
| 8 | 8 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | 8 | 38 | No |
|---|
| 9 | 9 | Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | 9 | 3 | No |
|---|
| 10 | 10 | Additional rate for providing one disc set on any type of HT pole for making cut point. | 10 | 33 | No |
|---|
| 11 | 11 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | 11 | 5 | No |
|---|
| 12 | 12 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | 12 | 58 | No |
|---|
| 13 | 13 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. | 13 | 1 | No |
|---|
| 14 | 14 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. | 14 | 1 | No |
|---|
| 15 | 15 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 15 | 108 | No |
|---|
| 16 | 16 | Additional rate for excavation of Pit for 'A' type pole in Laterite. | 16 | 3 | No |
|---|
| 17 | 17 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. | 17 | 1.7 | km |
|---|
| 18 | 18 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. | 18 | 5 | No |
|---|
| 19 | 19 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | 19 | 41 | No |
|---|
| 20 | 20 | Fitting one set AB switch and giving connection | 20 | 3 | No |
|---|
| 21 | 21 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). | 21 | 17 | km/ km |
|---|
| 22 | 22 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. | 22 | 2 | No |
|---|
| 23 | 23 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | 23 | 16 | No |
|---|
| 24 | 24 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials. | 24 | 10 | No |
|---|
| 25 | 25 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | 25 | 9 | No |
|---|
| 26 | 26 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | 26 | 10 | No |
|---|
| 27 | 27 | Fitting one Additional 2.4m Channel cross arm in existing single pole incl. conveyance of materials. | 27 | 7 | No |
|---|
| 28 | 28 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 28 | 5 | No |
|---|
| 29 | 29 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 29 | 42 | No |
|---|
| 30 | 30 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. | 30 | 1 | No |
|---|
| 31 | 31 | Dismantling one section fuse | 31 | 10 | No |
|---|
| 32 | 32 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole. | 32 | 54 | No |
|---|
| 33 | 33 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | 33 | 12 | No |
|---|
| 34 | 34 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | 34 | 46 | No |
|---|
| 35 | 35 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. | 35 | 64 | No |
|---|
| 36 | 36 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. | 36 | 4 | No |
|---|
| 37 | 37 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. | 37 | 10 | No |
|---|
| 38 | 38 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. | 38 | 12 | No |
|---|
| 39 | 39 | Dismantling one 2x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole and reconnecting. | 39 | 1 | No |
|---|
| 40 | 40 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting of trunks/branches, removing the root completely and stacking. | 40 | 6 | No |
|---|
| 41 | 41 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. | 41 | 53 | No |
|---|
| 42 | 42 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). | 42 | 13 | No |
|---|
| 43 | 43 | Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc. | 43 | 3 | No |
|---|