National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Tender For Consultancy Services For Preparation Of Detailed Project Report For 2 Lane Road From Tetwal ( Kashmir ) To Drass ( Ladakh ) In The Ut Of Jammu And Kashmir And Ladakh. Submission Date for this Tender is 27-01-2021. Detail Project Report Tenders in Jammu and Kashmir Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 15-Jan-2021 | Amendment No. 1 | Date | 27-01-2021 |
Name of the Project: Consultancy Services for Preparation of Detailed Project Report for 2 laning with/without paved shoulder from Tetwal (Kashmir) to Drass (Ladakh) in the UT of Jammu & Kashmir and Ladakh | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1.01 | Remuneration for Local Staff (including per diem allowance)\n | BI01010001010000000000000515BI0100001113 | ||
2 | 1.02 | PROFESSIONAL Staff | BI01010001010000000000000515BI0100001114 | ||
3 | 1.03 | Team Leader cum Senior Highway Engineer | BI01010001010000000000000515BI0100001115 | 8 | Month |
4 | 1.04 | Senior Tunnel Expert | BI01010001010000000000000515BI0100001116 | 6 | Month |
5 | 1.05 | Tunnel Design Expert | BI01010001010000000000000515BI0100001117 | 4 | Month |
6 | 1.06 | Senior Highway cum Pavement Engineer | BI01010001010000000000000515BI0100001118 | 8 | Month |
7 | 1.07 | Senior Geotechnical Engineer | BI01010001010000000000000515BI0100001119 | 8 | Month |
8 | 1.08 | Other Professional Staff | BI01010001010000000000000515BI0100001120 | ||
9 | 1.09 | Senior E&M Expert | BI01010001010000000000000515BI0100001121 | 2 | Month |
10 | 1.1 | Bridge/Structural Engineer | BI01010001010000000000000515BI0100001122 | 6 | Month |
11 | 1.11 | Senior Geologist | BI01010001010000000000000515BI0100001123 | 4 | Month |
12 | 1.12 | Senior Survey Engineer | BI01010001010000000000000515BI0100001124 | 8 | Month |
13 | 1.13 | Environmental Specialist | BI01010001010000000000000515BI0100001125 | 2 | Month |
14 | 1.14 | Material Engineer | BI01010001010000000000000515BI0100001126 | 4 | Month |
15 | 1.15 | Quantity Surveyor/Documentation Expert | BI01010001010000000000000515BI0100001127 | 8 | Month |
16 | 1.16 | Land Acquisition Expert | BI01010001010000000000000515BI0100001128 | 3 | Month |
17 | 1.17 | Sub-Professional Staff: \n | BI01010001010000000000000515BI0100001129 | ||
18 | 1.18 | Sub-Professional Staff - Team -1\n | BI01010001010000000000000515BI0100001130 | ||
19 | 1.19 | Highway cum Pavement Engineer - 1 | BI01010001010000000000000515BI0100001131 | 6 | Month |
20 | 1.2 | Survey Engineer - 1 | BI01010001010000000000000515BI0100001132 | 6 | Month |
21 | 1.21 | Material Engineer - 1 | BI01010001010000000000000515BI0100001133 | 6 | Month |
22 | 1.22 | Geologist/Geotechnical Engineer - 1 | BI01010001010000000000000515BI0100001134 | 6 | Month |
23 | 1.23 | Quantity Surveyor - 1 | BI01010001010000000000000515BI0100001135 | 6 | Month |
24 | 1.24 | Sub-Professional Staff - Team -2\n | BI01010001010000000000000515BI0100001136 | ||
25 | 1.25 | Highway cum Pavement Engineer - 2 | BI01010001010000000000000515BI0100001137 | 6 | Month |
26 | 1.26 | Survey Engineer - 2 | BI01010001010000000000000515BI0100001138 | 6 | Month |
27 | 1.27 | Material Engineer - 2 | BI01010001010000000000000515BI0100001139 | 6 | Month |
28 | 1.28 | Geologist/Geotechnical Engineer - 2 | BI01010001010000000000000515BI0100001140 | 6 | Month |
29 | 1.29 | Quantity Surveyor - 2 | BI01010001010000000000000515BI0100001141 | 6 | Month |
30 | 1.3 | Sub-Professional Staff - Team -3 | BI01010001010000000000000515BI0100001142 | ||
31 | 1.31 | Highway cum Pavement Engineer - 3 | BI01010001010000000000000515BI0100001143 | 6 | Month |
32 | 1.32 | Survey Engineer - 3 | BI01010001010000000000000515BI0100001144 | 6 | Month |
33 | 1.33 | Material Engineer - 3 | BI01010001010000000000000515BI0100001145 | 6 | Month |
34 | 1.34 | Geologist/Geotechnical Engineer - 3 | BI01010001010000000000000515BI0100001146 | 6 | Month |
35 | 1.35 | Quantity Surveyor - 3 | BI01010001010000000000000515BI0100001147 | 6 | Month |
36 | 1.36 | Support Staff (Fixed Rates)\n | BI01010001010000000000000515BI0100001148 | ||
37 | 1.37 | Office Manager (1 No.) | BI01010001010000000000000515BI0100001149 | 8 | Nos |
38 | 1.38 | Typist (4 No.) | BI01010001010000000000000515BI0100001150 | 24 | Nos |
39 | 1.39 | Office Boy (4 No.) | BI01010001010000000000000515BI0100001151 | 24 | Nos |
40 | 1.4 | Watchman (3 No.) | BI01010001010000000000000515BI0100001152 | 24 | Nos |
41 | 1.41 | Transportation (Fixed costs) | BI01010001010000000000000515BI0100001153 | ||
42 | 1.42 | The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (5 Vehicle for 8months each) | BI01010001010000000000000515BI0100001154 | 40 | Month |
43 | 1.43 | Duty Travel to Site (Fixed Costs) | BI01010001010000000000000515BI0100001155 | ||
44 | 1.44 | All Trips | BI01010001010000000000000515BI0100001156 | 1 | LS |
45 | 1.45 | Office Rent (Fixed Costs) | BI01010001010000000000000515BI0100001157 | ||
46 | 1.46 | Main Office : The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services. | BI01010001010000000000000515BI0100001158 | 8 | Months |
47 | 1.47 | Sub-Office (03 Nos.) : The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services. | BI01010001010000000000000515BI0100001159 | 24 | Months |
48 | 1.48 | Office Supplies, Utilities and Communication for all offices Costs) | BI01010001010000000000000515BI0100001160 | ||
49 | 1.49 | Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication | BI01010001010000000000000515BI0100001161 | 8 | Months |
50 | 1.5 | Office Furniture and Equipment for all offices (Fixed costs) | BI01010001010000000000000515BI0100001162 | ||
51 | 1.51 | Office Furniture and Equipment | BI01010001010000000000000515BI0100001163 | 1 | LS |
52 | 1.52 | Reports and Document (Fixed costs) | BI01010001010000000000000515BI0100001164 | ||
53 | 1.53 | All Reports and documents as per RFP in required number of sets | BI01010001010000000000000515BI0100001165 | 1 | Nos |
54 | 1.54 | Survey and Investigation | BI01010001010000000000000515BI0100001166 | ||
55 | 1.55 | A. Topographical Survey (Fixed Rate) | BI01010001010000000000000515BI0100001167 | ||
56 | 1.56 | Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision. | BI01010001010000000000000515BI0100001168 | 1 | LS |
57 | 1.57 | B. Investigation (Fixed cost) | BI01010001010000000000000515BI0100001169 | ||
58 | 1.58 | All investigations/surveys including Road and Bridge Inventory, FWD Test and Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies, Land Acquisition Studies, etc. | BI01010001010000000000000515BI0100001170 | 1 | LS |
59 | 1.59 | Net Work Survey and GPR | BI01010001010000000000000515BI0100001171 | ||
60 | 1.6 | Net work Survey of the existing Highways as a\nrepository for civil work as per directions from\nAuthority. | BI01010001010000000000000515BI0100001172 | 1 | LS |
61 | 1.61 | GPR Survey for detection of under ground utilities | BI01010001010000000000000515BI0100001173 | 1 | LS |
62 | 1.62 | Sub-soil Investigation & Other Works | BI01010001010000000000000515BI0100001174 | ||
63 | 1.63 | Sub-Soil Investigation | BI01010001010000000000000515BI0100001175 | ||
64 | 1.64 | a) Boring in all type of soils (other than hard rock) | BI01010001010000000000000515BI0100001176 | 3000 | Metre |
65 | 1.65 | b) Boring in hard rock | BI01010001010000000000000515BI0100001177 | 1500 | Metre |
66 | 1.66 | Cost of supply and fixing Boundary Pillars | BI01010001010000000000000515BI0100001178 | ||
67 | 1.67 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. | BI01010001010000000000000515BI0100001179 | 1 | LS |
68 | 1.68 | Land Acquisition Team including support staff and logistics/transportation for 04 Teams | BI01010001010000000000000515BI0100001180 | ||
69 | 1.69 | A. Land acquisition Team including support staff | BI01010001010000000000000515BI0100001181 | ||
70 | 1.7 | Ex-Land Revenue Inspector/Officer or equivalent (04 nos) | BI01010001010000000000000515BI0100001182 | 12 | Months |
71 | 1.71 | Ex-Kanoongo/ Girdawar or equivalent (04 nos) | BI01010001010000000000000515BI0100001183 | 12 | Months |
72 | 1.72 | Ex-Patwari or equivalent (04 nos) | BI01010001010000000000000515BI0100001184 | 12 | Months |
73 | 1.73 | Typist (04 nos) | BI01010001010000000000000515BI0100001185 | 12 | Months |
74 | 1.74 | Peon (04 nos) | BI01010001010000000000000515BI0100001186 | 12 | Months |
75 | 1.75 | B. Logistics for Land acquisition Team | BI01010001010000000000000515BI0100001187 | ||
76 | 1.76 | Computer including necessary peripherals (04 sets) | BI01010001010000000000000515BI0100001188 | 12 | Months |
77 | 1.77 | Printers (04 nos.) | BI01010001010000000000000515BI0100001189 | 12 | Months |
78 | 1.78 | Vehicles (Bolero or equivalent) with monthly running limit of 4000 km\n(04 nos)\n | BI01010001010000000000000515BI0100001190 | 12 | Months |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail