}

Assistance In Major Shutdown/ Breakdown/ Mechanical Maintenance Works Of Belt Conveyors Of Bunker And Surface Area Of New Chp On As And When Required Basis At Dipka Expansion Project, Dipka Expansion Project, Dipka Area-Chhattisgarh

South Eastern Coalfields Limited-SECL has published Assistance In Major Shutdown/ Breakdown/ Mechanical Maintenance Works Of Belt Conveyors Of Bunker And Surface Area Of New Chp On As And When Required Basis At Dipka Expansion Project. Submission Date for this Tender is 07-01-2021. Conveyors and Accessories Tenders in Dipka Expansion Project, Dipka Area Chhattisgarh. Bidders can get complete Tender details and download the document.




Tender Notice

26335306
Assistance In Major Shutdown/ Breakdown/ Mechanical Maintenance Works Of Belt Conveyors Of Bunker And Surface Area Of New Chp On As And When Required Basis At Dipka Expansion Project
Open Tender
Indian
Chhattisgarh
Dipka Expansion Project, Dipka Area
07-01-2021

Tender Details

Assistance In Major Shutdown / Breakdown / Mechanical Maintenance Works Of Belt Conveyors Of Bunker And Surface Area Of New Chp On As And When Required Basis At Dipka Expansion Project

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 71.62 Lakhs /-

BOQ Items

Name of the Work / Contract No:
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Dismantling/ dis-assembling/ Handling Job in major shutdown/ breakdown/ mechanical maintenance works: Dismantling/ lowering of counter-weights, dismounting of idlers and idler frames, pulling of damaged/ existing steel cord/ Nylon-Nylon belt, dismantling and dis-assembling of damaged assembly/sub-assembly, pulleys, roilling elements, drive units, conveyor take-up units etc. and other allied works at various locations of Bunker abd Surface Area of New CHP BI01010001010000000000000515BI0100001113 301 Te.
2 2 Assmebling/ installation/ handling job n major shutdown/ breakdown/ mechanical maintenance works: Handling of counter-weights, mounting of idlers and idler frames, laying/ placing/ positioning of new steel cord/ Nylon-Nylon belt, re-installation/ re-erection, setting of new/ repaired assembly/ sub-assembly, pulleys, roilling elements, drive units, conveyor take-up units etc. and other allied works at various locations of Bunker abd Surface Area of New CHP BI01010001010000000000000515BI0100001114 301 Te.
3 3 Note: 1). The work will be taken up as and when required basis on a very short notice subjected to the availability of shutdown of circuit. 2. The welding electrode, industrial gas, other consumables will be provided by the Department. 3. For installation of drive units/ other sub-assembling desired preparation should be done. 4. Work should be cariied out as per existing design. 5. The repairing/ maintenance work carried out on site will be as per instruction of Engineer In-charge. 6. All tools, tackles and safety standards to engaged personnel will be provided by the Contractor.
4 4 Total impact of GST for the purpose of CTC BI01010001010000000000000515BI0100001129 1 Nos
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail