| 1 | 1 | Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | BI01010001010000000000000515BI0100001113 | 25.69 | cum |
|---|
| 2 | 2 | Supplying and filling in plinth, under floor, foundations etc. with sand(fine) from selected quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. -(Foundation) | BI01010001010000000000000515BI0100001114 | 7.275 | cum |
|---|
| 3 | 3 | Providing and laying dry flat brick flooring in required pattern complete. | BI01010001010000000000000515BI0100001115 | 18.002 | sqm |
|---|
| 4 | 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering All work upto plinth level 1:3:6 (1 cement : 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001116 | 3.225 | cum |
|---|
| 5 | 5 | Removing mortar from brick and cleaning bricks including stacking bricks and disposal rubbish with all lifts and upto a lead of 50 m etc complete as per direction of the Engineer-in-charge. In cement mortar. | BI01010001010000000000000515BI0100001117 | 1500 | each |
|---|
| 6 | 6 | First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). | BI01010001010000000000000515BI0100001118 | 12.0193 | cum |
|---|
| 7 | 7 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of\nall materials as required complete:-\nIn cement mortar 1:4 ( 1 cement : 4 fine sand ). | BI01010001010000000000000515BI0100001119 | 3.52 | sqm |
|---|
| 8 | 8 | Providing, hoisting and fixing upto floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like including the cost of required centring, shuttering, finishing smooth with 6mm thick cement plaster 1:3 (1cement : 3 fine sand) on exposed surfaces complete, but excluding cost of reinforcement with cement concrete 1:2:4 (1cement : 2 fine sand : 4 graded stone aggregate 20mm nominal size). | BI01010001010000000000000515BI0100001120 | 1.215 | cum |
|---|
| 9 | 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level.\nThermo-Mechanically Treated bars of grade Fe-500D or more | BI01010001010000000000000515BI0100001121 | 121.5 | kg |
|---|
| 10 | 10 | 12 mm cement plaster in single layer including cost of materials required and finishing even and smooth and curing complete. In cement mortar 1: 5 (1 cement : 5 fine sand) | BI01010001010000000000000515BI0100001122 | 82.55 | sqm |
|---|
| 11 | 11 | Neat cement punning | BI01010001010000000000000515BI0100001123 | 82.55 | sqm |
|---|
| 12 | 12 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level:\n1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001125 | 21.87 | cum |
|---|