Annual Maintenance Contract For The Existing Eht 230 Kv And 110 Kv Lines Of Pugalur Lines Sub Division In Trichy Operation Circle
Tender Value
Ref. Documents
Estimated cost
Bid Submission
05 Jan 2021
0 days left
EMD
18000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pugalur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Annual Maintenance Contract For The Existing Eht 230 Kv And 110 Kv Lines Of Pugalur Lines Sub Division In Trichy Operation Circle
BOQ
| Name of the work: Annual Maintenance Contract for the existing EHT 230 KV & 110 KV Lines of of Pugalur Lines Sub Division in Trichy Operation Circle for the period of 240 days. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Labour Charges for | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | Conducting periodical line patrol & checking tower members, insulators, jumpers, hardware fittings & all other accessires, and identifying the weak spots to carry out the rectification works periodically by Ground line patrol when the line is in energised condition including all labour, lead, lift, etc., complete. | BI01010001010000000000000515BI0100001113 | 1640 | KM |
| 3 | 1.02 | Conducting special line patrol for tripping & checking insulators, jumpers, hardware fittings & all other accessires & identifying the weak spots to carry out the rectification works by availing Line Clear including all labour lead, lift, etc., complete. | BI01010001010000000000000515BI0100001114 | 600 | KM |
| 4 | 1.03 | Conducting special line patrol for breakdown & checking insulators, jumpers, hardware fittings & all other accessires by climbing the towers & identifying the weak spots to carry out the rectification works by availing Line Clear including all labour, lead, lift, transport etc., complete. | BI01010001010000000000000515BI0100001115 | 270 | KM |
| 5 | 1.04 | Conducting Pre monsoon checking of tower members, insulators, jumpers, hardware fittings & all other accessires by climbing the towers & identifying the weak spots to carry out the rectification works periodically by availing Line Clear including all labour, lead, lift, etc., complete. | BI01010001010000000000000515BI0100001116 | 340 | KM |
| 6 | 1.05 | Clearing Light Jungle | BI01010001010000000000000515BI0100001117 | 8000 | Nos |
| 7 | 1.06 | Tree cutting with cost of all labour,lead,lift for all kind of trees etc.,complete.(Casurina & Euquiliptus). | BI01010001010000000000000515BI0100001118 | 800 | m2 |
| 8 | 1.07 | PCC (1:2:4) using 20mm HBG stone for Muffing & Coping with form work including cost of all materils,curing,lead,lift,etc.,complete | BI01010001010000000000000515BI0100001119 | 38 | m3 |
| 9 | 1.08 | Plastering with CM1:3,12mm thick for coing portion of tower leg including cost of all materils,labour, lead, lift, curing etc.complete | BI01010001010000000000000515BI0100001120 | 350 | m2 |
| 10 | 1.09 | Replacement of 14 units of tension insulators with fittings, including cost of all,labour,lead,lift,etc., complete as per standard specification | BI01010001010000000000000515BI0100001121 | 4 | sets |
| 11 | 1.1 | Replacment of 13 units of suspension insulators with fittings, transporting from stores to site including, labour, lead, lift, etc., complete as per standard specification. | BI01010001010000000000000515BI0100001122 | 6 | sets |
| 12 | 1.11 | Replacment of 8 units of tension insulators with fittings, transporting from stores to site including , labour, lead,lift,etc., complete as per standard specification. | BI01010001010000000000000515BI0100001123 | 6 | sets |
| 13 | 1.12 | Replacment of 7 units of suspension insulators with fittings, transporting from stores to site including , labour, lead,lift,etc., complete as per standard specification. | BI01010001010000000000000515BI0100001124 | 10 | sets |
| 14 | 1.13 | Providing mid span joints for Zebra conductor by availing LC including charges for lowering the conductor, providing jointing & re-stringing with all labour, lead, lift etc., complete as directed by the Engineer at site. | BI01010001010000000000000515BI0100001125 | 4 | Nos |
| 15 | 1.14 | Providing mid span joints for Panther conductor by availing LC including charges for lowering the conductor, providing jointing & re-stringing with all labour, lead, lift etc., complete as directed by the Engineer at site. | BI01010001010000000000000515BI0100001126 | 7 | Nos |
| 16 | 1.15 | Rectifying/Replacing the defective 230 kV jumpers which have been identified by the patrolling gang & providing new jumpers including charges for providing temporary earthing at works spot making arrangements at towers for rectification/ replacement of defective jumpers with new jumbers, removing temporary earthing from works spot after completion of works with all labour, lead. lift,etc., complete, as per the instructions of the Engineer in charge of the line. | BI01010001010000000000000515BI0100001127 | 14 | Nos |
| 17 | 1.16 | Rectifying/Replacing the defective 110 kV jumpers which have been identified by the patrolling gang & providing new jumpers including charges for providing temporary earthing at works spot making arrangements at towers for rectification/ replacement of defective jumpers with new jumbers, removing temporary earthing from works spot after completion of works with all labour, lead. lift,etc., complete, as per the instructions of the Engineer in charge of the line. | BI01010001010000000000000515BI0100001128 | 17 | Nos |
| 18 | 1.17 | Providing 230 kV Repair sleeve for conductor by availing LC including charges for lowering the conductor, providing jointing & re-stringing complete, as per the instructions of the Engineer in charge of the line. | BI01010001010000000000000515BI0100001129 | 6 | Nos |
| 19 | 1.18 | Providing 110 kV Repair sleeve for conductor by availing LC including charges for lowering the conductor, providing jointing & re-stringing complete, as per the instructions of the Engineer in charge of the line. | BI01010001010000000000000515BI0100001130 | 7 | Nos |
AI Tender Summary
Tender Timeline
Dec 18, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedJan 05, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJan 06, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender