}

Breakdown Maintenance Of Travelling Trippers , Various Gear Boxes , Belt Feeders , Vibro Feeders And Vibrating Screen Breakdown Maintenance Of Travelling Trippers , Various Gear Boxes , Belt Feeders , Vibro Feeders And Vibrating Screen Installed In , CHP 3X210MW, ATPS, Anpara-Uttar Pradesh

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Breakdown Maintenance Of Travelling Trippers , Various Gear Boxes , Belt Feeders , Vibro Feeders And Vibrating Screen Breakdown Maintenance Of Travelling Trippers , Various Gear Boxes , Belt Feeders , Vibro Feeders And Vibrating Screen Installed In . Submission Date for this Tender is 20-01-2021. Feeder Pillar Tenders in CHP 3X210MW, ATPS, Anpara Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

26292061
Breakdown Maintenance Of Travelling Trippers , Various Gear Boxes , Belt Feeders , Vibro Feeders And Vibrating Screen Breakdown Maintenance Of Travelling Trippers , Various Gear Boxes , Belt Feeders , Vibro Feeders And Vibrating Screen Installed In
Open Tender
Indian
Uttar Pradesh
CHP 3X210MW, ATPS, Anpara
20-01-2021

Tender Details

Breakdown Maintenance Of Travelling Trippers , Various Gear Boxes , Belt Feeders , Vibro Feeders And Vibrating Screen Breakdown Maintenance Of Travelling Trippers , Various Gear Boxes , Belt Feeders , Vibro Feeders And Vibrating Screen Installed In Chp , 3X210mw , Atps , Anpara

Key Value

Document Fees
INR 590 /-
EMD
INR 24000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Breakdown maintenance of Travelling Trippers, various Gear boxes, Belt feeders, Vibro feeders and Vibrating screen installed in CHP,3x210MW, ATPS, Anpara.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 TRAVELLING TRIPPER (02 nos.)
2 1.01 Replacement of damaged/ distorted transmission wheel of tripper BI01010001010000000000000515BI0100001113 4 Job
3 1.02 Replacement of damaged bearing of tripper carriage shaft. BI01010001010000000000000515BI0100001114 2 Job
4 1.03 Replacement of damaged Plummer block of tripper carriage shaft. BI01010001010000000000000515BI0100001115 2 Job
5 1.04 Attending oil leakage of gar box by providing gasket etc. BI01010001010000000000000515BI0100001116 1 Job
6 1.05 Repairing of main drive chain link BI01010001010000000000000515BI0100001117 2 Job
7 1.06 Replacement of main drive chain link BI01010001010000000000000515BI0100001118 1 Job
8 1.07 Replacement of drive chain of cable reeling mechanism. BI01010001010000000000000515BI0100001119 2 Job
9 1.08 Repairing of driven chain of cable reeling mechanism. BI01010001010000000000000515BI0100001120 2 Job
10 1.09 Repairing of driven teeth of main drive/ driven sprockets by welding and grinding BI01010001010000000000000515BI0100001121 1 Job
11 1.1 Repairing of drive / driven teeth of cable reeling mechanism BI01010001010000000000000515BI0100001122 30 Job
12 1.11 Replacement of sprockets drive/ driven of cable reeling mechanism BI01010001010000000000000515BI0100001123 4 Job
13 1.12 Re-alignment of sprockets drive / driven of cable reeling mechanism BI01010001010000000000000515BI0100001124 10 Job
14 1.13 Re-alignment of main drive of travelling tripper i.e., motor gear box, drive and driven sprocket BI01010001010000000000000515BI0100001125 15 Job
15 1.14 Removal of fouling of tripper wheel with structure BI01010001010000000000000515BI0100001126 2 Job
16 1.15 Strengthening of tripper structure whenever required by providing additional angle, channel and ribs etc. BI01010001010000000000000515BI0100001127 1 Job
17 1.16 Replacement of damaged bibby coupling along with proper alignment BI01010001010000000000000515BI0100001128 1 Job
18 1.17 Replacement of brake shoe liner BI01010001010000000000000515BI0100001129 2 Job
19 1.18 Removal of jamming of cable guide roller assembly BI01010001010000000000000515BI0100001130 4 Job
20 1.19 Checking of re-alignment and leveling of rail track of tripper. BI01010001010000000000000515BI0100001131 10 Job
21 1.2 Replacement / Re-fixing of rail scrapper BI01010001010000000000000515BI0100001132 2 Job
22 1.21 Re-alignment of bunker sealing belt by adjusting roller and tension of belt. BI01010001010000000000000515BI0100001133 6 Job
23 1.22 Straightening of vertical post of tripper rail by providing stiffeners etc. BI01010001010000000000000515BI0100001134 40 Job
24 1.23 Replacement of damaged bearing / Plummer block of rollers of bunker sealing belt. BI01010001010000000000000515BI0100001135 1 Job
25 1.24 Replacement of brake assembly mechanism BI01010001010000000000000515BI0100001136 2 Job
26 1.25 Repairing of gear box body of tripper by grinding & welding BI01010001010000000000000515BI0100001137 1 Job
27 1.26 Repairing of guards & Hand railing of tripper BI01010001010000000000000515BI0100001138 2 Job
28 1.27 Replacement of complete gear box by new one/ by taken out gear box from other tripper BI01010001010000000000000515BI0100001139 2 Job
29 1.28 Replacement of transmission shaft BI01010001010000000000000515BI0100001140 1 Job
30 1.29 Providing of stiffeners in distorted transmission wheel by cutting and welding BI01010001010000000000000515BI0100001141 3 Job
31 1.3 Replacement / repairing of shaft of bunker sealing belt roller by cutting & welding BI01010001010000000000000515BI0100001142 3 Job
32 1.31 Repairing of shaft of cable reeling drum by welding, grinding and making hole for lock in shaft. BI01010001010000000000000515BI0100001143 4 Job
33 1.32 Repairing of brake shoe liner BI01010001010000000000000515BI0100001144 4 Job
34 1.33 Repairing of tripper brake drum by welding and grinding BI01010001010000000000000515BI0100001145 2 Job
35 1.34 Revisioning of bearing, CRD sprocket assembly BI01010001010000000000000515BI0100001146 1 Job
36 1.35 Tightening of check nut of Plummer block of TT shaft. BI01010001010000000000000515BI0100001147 4 Job
37 1.36 Re-welding and grinding of stiffeners of TT Wheel. BI01010001010000000000000515BI0100001148 20 Job
38 1.37 Replacement of bunker sealing belt rollers of tripper BI01010001010000000000000515BI0100001149 4 Job
39 1.38 Replacement of bent / damaged ISMC of size 200 mm of carriage drive Plummer block base frame after jacking of TT by cutting, grinding & welding etc. BI01010001010000000000000515BI0100001150 3 Job
40 1.39 Replacement of spring of bibby coupling BI01010001010000000000000515BI0100001151 2 Job
41 2 GEAR BOXES (conveyor system, crushers)
42 2.01 Replacement of gear box unit by new / taken out from other equipment BI01010001010000000000000515BI0100001152 3 Job
43 2.02 Repairing of gear box body by grinding and welding. BI01010001010000000000000515BI0100001153 1 Job
44 2.03 Replacement of damaged bearing of input shaft / intermediate shafts/ output shaft by dismantling the complete gear assembly and its re-alignment with driven equipment and motor also. BI01010001010000000000000515BI0100001154 4 Job
45 2.04 Replacement of Input shaft / intermediate shafts / output shaft by dismantling the complete gear box assembly and its re-alignment with driven equipment and motor also. BI01010001010000000000000515BI0100001155 2 Job
46 2.05 Replacement of oil seals of input / output shaft of gear box by dismantling the complete gear box assembly and its re-alignment with driven equipment and motor also. BI01010001010000000000000515BI0100001156 7 Job
47 2.06 Overhauling of gear boxes of conveyor system, belt feeders & primary crushers. This involves opening of gear box cover, cleaning, minor repairs, checking of bearings, re-assembly, alignment & trial run. This will also include alignment of gear box with motor. BI01010001010000000000000515BI0100001157 15 Job
48 2.07 Attending oil leakage from gear box by providing gasket etc. BI01010001010000000000000515BI0100001158 2 Job
49 2.08 Opening of gear box upper housing for checking of input shaft bearing and checking nut of gear box BI01010001010000000000000515BI0100001159 10 Job
50 2.09 Replacement of damaged and distorted jack bolt of gear box by cutting and welding. BI01010001010000000000000515BI0100001160 10 Job
51 2.1 Changing of gear box assembly from left hand to right hand and vice –versa. BI01010001010000000000000515BI0100001161 3 Job
52 2.11 Removal and re-fixing of matching gear fitted into intermediate shaft. BI01010001010000000000000515BI0100001162 2 Job
53 2.12 Removal & Refixing of bearings of input shaft of gear box for repairing of housing, check nut and making thread. BI01010001010000000000000515BI0100001163 1 Job
54 2.13 Replacement of upper and lower housing of gear box with new one or by repaired one. BI01010001010000000000000515BI0100001164 2 Job
55 2.14 Removal and re-fixing of coupling fitted in input shaft of gear box. BI01010001010000000000000515BI0100001165 1 Job
56 3 VIBRATING SCREEN (4nos.)
57 3.01 Replacement of damaged supporting springs BI01010001010000000000000515BI0100001166 2 Job
58 3.02 Replacement of damaged bottom deck screen cloth BI01010001010000000000000515BI0100001167 3 Job
59 3.03 Replacement of damaged oil seals of bearings BI01010001010000000000000515BI0100001168 10 Job
60 3.04 Replacement of damaged bearing of drive shaft BI01010001010000000000000515BI0100001169 6 Job
61 3.05 Repairing of back cover plates by welding & cutting etc. BI01010001010000000000000515BI0100001170 4 Job
62 3.06 Re-fixing of detached back cover plates. BI01010001010000000000000515BI0100001171 2 Job
63 3.07 Checking & re-alignment of vibrating screen & motor BI01010001010000000000000515BI0100001172 12 Job
64 3.08 Leveling of vibrating screen by providing / removing packing etc. BI01010001010000000000000515BI0100001173 6 Job
65 3.09 Re-adjustment of stroke of vibrating screen by removing / adding counter screen weights BI01010001010000000000000515BI0100001174 1 Job
66 3.1 Replacement of damaged top deck mesh by welding / cutting BI01010001010000000000000515BI0100001175 1 Job
67 3.11 Repairing of damaged top deck mesh by welding / cutting. BI01010001010000000000000515BI0100001176 60 Job
68 3.12 Replacement of damaged bottom deck mesh by welding / cutting BI01010001010000000000000515BI0100001177 8 Job
69 3.13 Fabrication & fixing of holding down channel for bottom deck mesh BI01010001010000000000000515BI0100001178 1 Job
70 3.14 Elimination of any abnormal sound from vibrating screen. BI01010001010000000000000515BI0100001179 7 Job
71 3.15 Replacement of damaged sealing rubber BI01010001010000000000000515BI0100001180 2 Job
72 3.16 Attending leakage of grease from bearing housing by providing gasket etc. BI01010001010000000000000515BI0100001181 2 Job
73 3.17 Replacement of main shaft of vibrating screen by new one/ repaired one. BI01010001010000000000000515BI0100001182 2 Job
74 3.18 Repositioning, alignment and welding of spring supporting suspension shaft after dismantling hood etc. if reqd. BI01010001010000000000000515BI0100001183 2 Job
75 3.19 Repairing / repositioning of hood of vibrating screen by welding / cutting BI01010001010000000000000515BI0100001184 2 Job
76 3.2 Torque setting of all the H.T. bolts by torqe wrench at specified torque including bolts of screen mesh panels. BI01010001010000000000000515BI0100001185 40 Job
77 3.21 Replacement of damaged screen bar by cutting and welding BI01010001010000000000000515BI0100001186 1 Job
78 3.22 Repairing of damaged bar by welding BI01010001010000000000000515BI0100001187 20 Job
79 3.23 Replacement / repairing of damaged canopy of oil chamber by welding & strengthening of screen BI01010001010000000000000515BI0100001188 4 Job
80 3.24 Repairing of oil chamber leakage by grinding, welding BI01010001010000000000000515BI0100001189 10 Job
81 3.25 Attending oil leakage of inspection pipe of screen BI01010001010000000000000515BI0100001190 8 Job
82 3.26 Replacement / repairing of clit base of motor for proper alignment BI01010001010000000000000515BI0100001191 8 Job
83 3.27 Replacement of bearing housing of screen BI01010001010000000000000515BI0100001192 6 Job
84 3.28 Replacement of inspection pipe line of vibrating screen BI01010001010000000000000515BI0100001193 2 Job
85 3.29 Replacement of oil chamber in V.S. by new or by repaired one. BI01010001010000000000000515BI0100001194 1 Job
86 4 VIBRO FEEDERS (4nos. )
87 4.01 Replacement of damaged supporting spring. BI01010001010000000000000515BI0100001195 1 Job
88 4.02 Replacement of damaged gasket of oil chamber BI01010001010000000000000515BI0100001196 1 Job
89 4.03 Replacement of damaged bearing by new one BI01010001010000000000000515BI0100001197 1 Job
90 4.04 Re-adjustment of stroke of vibro feeder by changing drive pulley of motor BI01010001010000000000000515BI0100001198 1 Job
91 4.05 Leveling of vibro feeder by providing / removing packing below supporting springs bed. BI01010001010000000000000515BI0100001199 6 Job
92 4.06 Checking and re-alignment of motor with vibro feeder. BI01010001010000000000000515BI0100001200 30 Job
93 4.07 Replacement of damaged drive/ driven gears. BI01010001010000000000000515BI0100001201 1 Job
94 4.08 Replacement of damaged drive / driven shaft. BI01010001010000000000000515BI0100001202 1 Job
95 4.09 Replacement of Vibrator assembly after taking out from other vibro feeders. BI01010001010000000000000515BI0100001203 1 Job
96 4.1 Replacement of V-Belt pulley of motor whenever required. BI01010001010000000000000515BI0100001204 1 Job
97 4.11 Torque setting of all the HT bolts by torque wrench at specified torque. BI01010001010000000000000515BI0100001205 20 Job
98 4.12 Replacement of Pin bush / Plummer block of motor base frame by cutting & welding. BI01010001010000000000000515BI0100001206 2 Job
99 4.13 Replacement / Repairing of cracked motor base frame after cutting, grinding & welding etc. BI01010001010000000000000515BI0100001207 3 Job
100 5 BELT FEEDERS (08nos.)
101 5.01 Replacement of damaged takeup screw by new one after cutting and welding (size 40 x 60 mm) BI01010001010000000000000515BI0100001208 1 Job
102 5.02 Checking, re-alignment of complete drive unit i.e. motor, gear box and drive pulley. BI01010001010000000000000515BI0100001209 7 Job
103 6 FLUID COUPLING
104 6.1 Replacement of damaged driving(resilient plate) of fluid coupling.
105 6.11 Up to280KW BI01010001010000000000000515BI0100001210 2 job/plate
106 6.12 Above 280KW to 400KW BI01010001010000000000000515BI0100001211 2 job/plate
107 6.13 Above 400KW to 800KW BI01010001010000000000000515BI0100001212 2 job/plate
108 6.2 Replacement of defective/damaged multidisc of fluid coupling
109 6.21 Up to280KW BI01010001010000000000000515BI0100001213 4 job/MD
110 6.22 Above 280KW to 400KW BI01010001010000000000000515BI0100001214 4 job/MDc
111 6.23 Above 400KW to 800KW BI01010001010000000000000515BI0100001215 4 job/MDc
112 6.3 Replacement of defective/worn-out fluid coupling by new one/overhauled one
113 6.31 up to100KW BI01010001010000000000000515BI0100001216 3 job/FC
114 6.32 Above 100KW to 280KW BI01010001010000000000000515BI0100001217 3 job/FC
115 6.33 Above 280KW BI01010001010000000000000515BI0100001218 3 job/FC
116 6.4 Replacement of defective/worn-out fluid coupling by taking out coupling from equipment
117 6.41 up to 100KW BI01010001010000000000000515BI0100001219 3 job/FC
118 6.42 Above 100KW to 280KW BI01010001010000000000000515BI0100001220 3 job/FC
119 6.43 Above 280KW BI01010001010000000000000515BI0100001221 3 job/FC
120 6.5 Replacement of Oil seals/O-rings of fluid coupling by taking out the coupling, dismantling, reassembly and alignment
121 6.51 up to 100KW 3 job/FC
122 6.52 Above 100KW to 280KW BI01010001010000000000000515BI0100001222 3 job/FC
123 6.53 Above 280KW BI01010001010000000000000515BI0100001223 3 job/FC
124 6.6 Attending minor oil leakage from various fluid coupling BI01010001010000000000000515BI0100001224 20 job/FC
125 6.7 Replacement of Bearing of fluid coupling by taking out the complete fluid coupling, dismantling, reassembly & alignment
126 6.71 up to 100KW BI01010001010000000000000515BI0100001225 2 Job/Brg
127 6.72 Above 100KW to 280KW BI01010001010000000000000515BI0100001226 2 Job/Brg
128 6.73 Above 280KW BI01010001010000000000000515BI0100001227 2 Job/Brg
129 7 6.6KV/0.4KV MOTOR ALIGNMENT
130 7.01 Realignment of gear-box unit assembly with drive unit and trial run up to 50KW. BI01010001010000000000000515BI0100001228 15 Job/Gr box
131 7.02 Realignment of gear-box unit assembly with drive unit and trial run up to 100KW. BI01010001010000000000000515BI0100001229 15 Job/Gr box
132 7.03 Realignment of gear-box unit assembly with drive unit and trial run up to 280KW. BI01010001010000000000000515BI0100001230 10 Job/Gr box
133 7.04 Realignment of gear-box unit assembly with drive unit and trial run above 280KW. BI01010001010000000000000515BI0100001231 10 Job/Gr box
134 7.05 Alignment of the crusher with motor. BI01010001010000000000000515BI0100001232 10 Job/Gr box
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail