| 1 | 1 | Excavation in trenches, not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 Sqm on plan and not exceeding 1.5 mtr in depth and getting out in hard and dense soil, complete all as specified and directed. (Size of pit 0.50m x 0.50m x 0.50m). | | 150 | Cum |
|---|
| 2 | 2 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25Cm, complete all as specified and directed. | | 3 | Cum |
|---|
| 3 | 3 | Removing excavated materials/ soils, not exceeding 50mtrs and depositing where directed at a level not exceeding 1.50mtrs, complete all as specified and directed. | | 147 | Cum |
|---|
| 4 | 4 | Supply of farm yard manure (FYM), sand and good soil (Quantity of FYM 40 kg per pit, sand 5 Kg per pit and soil as required per pit as per direction of Horticulture Deptt Kangra at Dharamshala) complete all as directed.\nNote:- (i) Density of manure considered at 500 Kg/Cum\n (ii) Density of sand considered at 1600 Kg/Cum | BI01010001010000000000000515BI0100001125 | 147 | Cum |
|---|
| 5 | 5 | Supplying of insecticides Chloropyriphos 8ml/Ltr water i.e. 40 ml/Ltr water per pit as per direction of Horiculture Deptt Kangra at Dharamshala complete all as directed. | BI01010001010000000000000515BI0100001129 | 147 | Litre |
|---|
| 6 | 6 | Mixing of sand, farm yard manure, earth and insecticide diluted with water and returning filling, ramming the mix into pit including levelling and well ramming complete all as directed . | | 147 | Cum |
|---|
| 7 | 7 | Supply and plantation of doob grass with salexon No 1 grass by dibbling root method all as detailed below and as specified and maintenance of the ground till the grass forms a thick lawn face from weeds and fit for\nNote:- (a) Ploughing of whole site in soft /ordinary soil up to depth of 20 cm and revoving all the unwanted material such as\n(b) Dressing and levelling the soil\n (i) Manure: Old cow dung or okhla sludge at the rate of 2.25 cubic feet for \n 10 Sqm.\n (ii) Fertilizers :- (aa) Neem kholi @ 2 kg per 10 Sqm\n (bb) Benemeal @ 1 kg for 10 Sqm\n (iii) DA (16.42) @ 0.15 kg for 10 Sqm \n (iv) BHC dust 10% or pin dance dust @ 0.15 kg for 10 Sqm\n (v) Weedicide @ 0.01 for 10 Sqm Note:- The manure and fertilizers to a \n required to be mised evenly upto maximum depth of 15 cm. \n(c) Fine dressing of tup soil after mixing of manure and fertilizers to a required slope.\n(d) Watering of the area after fine dressing of soil after putting water upto 10 to 15 cm deep,\n(e) Final dressing of top surface of soil to required slope and gradient towards th manholes.\n | | 2000 | Sqm |
|---|
| 8 | 8 | Supply and planting of permanent live Plants/ tree of following variety including shifting transporting of plants/tree to desired location all as directed by Engr-in-charge/AGE (I) :\n(Sapling should be healthy grown up with good root system and minimum height from ground level as decided by AGE (I). | | | |
|---|
| 9 | 8.01 | Bamboo | BI01010001010000000000000515BI0100001113 | 220 | Each |
|---|
| 10 | 8.02 | Morpankhi (Thuja orientls) | BI01010001010000000000000515BI0100001114 | 205 | Each |
|---|
| 11 | 8.03 | Yellow Duranta/ Heena hedge | BI01010001010000000000000515BI0100001115 | 1575 | Each |
|---|
| 12 | 8.04 | Hydrangea | BI01010001010000000000000515BI0100001116 | 168 | Each |
|---|
| 13 | 8.05 | Night Jasmine | BI01010001010000000000000515BI0100001117 | 1020 | Each |
|---|
| 14 | 8.06 | Lily | BI01010001010000000000000515BI0100001118 | 110 | Each |
|---|
| 15 | 8.07 | Rose | BI01010001010000000000000515BI0100001119 | 70 | Each |
|---|
| 16 | 8.08 | Hibiscus | BI01010001010000000000000515BI0100001120 | 75 | Each |
|---|
| 17 | 8.09 | Peach Tree | BI01010001010000000000000515BI0100001121 | 28 | Each |
|---|
| 18 | 8.1 | Plum Tree | BI01010001010000000000000515BI0100001122 | 86 | Each |
|---|
| 19 | 8.11 | Pine tree | | 20 | Each |
|---|
| 20 | 8.12 | Lime baramasi | | 10 | Each |
|---|
| 21 | 8.13 | Kagzi lime | | 10 | Each |
|---|
| 22 | 8.14 | Ashoka tree | | 50 | Each |
|---|
| 23 | 8.15 | Lichi | | 10 | Each |
|---|
| 24 | 8.16 | Guava | | 10 | Each |
|---|
| 25 | 9 | Chequered cement concrete coloured tiles, homogenious texture glossy finished , chemically coated machine pressed 30 cm x 30cm x 25mm thick set, jointed and pointed in near cement slurry in floor with gray cement and pigment and including 20 mm thick cement screed in cement mortar 1:4 over and including 75mm thick PCC M-10 (Nominal Mix) type C-2, using 40mm graded crushed stone aggregate complete all as specified and directed. Shade/Colour of tile shall be approved by the GE. | | 650 | Sqm |
|---|
| 26 | 10 | Surface excavation not exceeding 30cm deep and averaging 15 cm deep and getting out in hard/dense soil complete all as specified and directed. | | 650 | Sqm |
|---|
| 27 | 11 | PCC 1:3:6 (nominal mix) type C-2 (using 40mm graded crushed stone aggregates) as in foundation filling and mass concrete complete all as specified and directed. | | 0.5 | Cum |
|---|
| 28 | 12 | Walling of random rubble stone masonry brought upto course well bonded bedded and soilidly hearted built in CM 1:6, complete all as specified and directed. | | 17 | Cum |
|---|
| 29 | 13 | Raised pointing to random or polygonal rubble, uncoursed or brought upto courses in cement mortar 1:4, complete all as specified. | | 3 | X Sqm |
|---|
| 30 | 14 | G I tubing medium grade of 15 mm bore with all fittings and fixtures fixed to wall and ceiling or laid in floor/trenches complete all as specified and directed. | | 135 | RM |
|---|
| 31 | 15 | G I tubing medium grade of 20 mm bore with all fittings and fixtures fixed to wall and ceiling or laid in floor /trenches complete all as specified and directed. | | 19 | RM |
|---|
| 32 | 16 | Stop valves cast copper alloy, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions for 15mm bore iron pipe or for unions and fixed in repairs complete, all as specified. | | 4 | Each |
|---|
| 33 | 17 | Stop valves cast copper alloy, screwed down, high pressure, with crutch or butterfly handle, screwed both ends for iron pipe or for unions for 20mm bore iron pipe or for unions and fixed in repairs complete, all as specified. | | 4 | Each |
|---|
| 34 | 18 | Bib tap, cast copper alloy ,chromium plated, fancy type , screwed for iron pipe or for brass ferrule of 15 mm bore complete all as specified and directed. | | 6 | Each |
|---|
| 35 | 19 | Gun metal globe or gate valve with iron wheel head, screwed both ends for iron pipe and fixed bore dia of pipe 20 mm complete all as specified and directed. | | 6 | Each |
|---|
| 36 | 20 | Automatic garden sprinkle (ISI Mark) , brass alloy for iron pipe or for brass ferrule of 15 mm bore complete all as specified and directed. | | 6 | Each |
|---|
| 37 | 21 | Rotational moulded polyethylene water storage tank 1000 Ltrs capacity four layered (ISI Marked) cylinderical vertical with closed top, hoisted and fixed in position with ball brass valve, high pressure with PVC float valve 20mm dia with polythene float and fly nut, tank nipples with check nuts and washers complete and making connections with existing water supply line complete all as specified.\n | | 4 | Each |
|---|
| 38 | 22 | Complete maintenance of planted trees and shrubs (Hedges) items covered under phase-I including hoeing, weeding, pruning, removal of garden rubbish, spraying of water, insecticides, pesticides and applying manure vermin-compost, neem cake & micro nutrients etc as per standard procedure and as directed by Engr-in-charge/ AGE(I), protecting the trees and shrubs, keeping good health of plants so as to keep the plant live in entire period of 12 months and replacing the dead trees and shrubs with the size as per time grown new live trees and shrubs (with in 48 hrs) etc and make all necessary arrangement to keep the plant live and healthy for entire period of 12 months starting from completion of phase-I.\nNote:-(i) Manpower to be deployed with a team of 02 Nos experienced gardener/mali and 02 Nos helper in a shift of 08 hrs per day including necessary tools and plants (T&P) per day (Except Sunday & holiday) for the period of 12 months starting from completion of phase-I\n(ii) Attendance register shall be maintained by contractor and put up to Engr-in-charge & GE for their inspection. | | 12 | Month |
|---|