Central Railway-CR has published Repairs Of Bed Plate Of Ulhas Bridge (Up & Dn.) At Kms. 57/26-32 On Kyn-Igp Section Of Mumbai Division.. Submission Date for this Tender is 20-01-2021. Bridge Work Tenders in Maharashtra. Bidders can get complete Tender details and download the document.
0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
0 | S.No. | Item Code | Item Qty | Qty Unit | Unit Rate | Basic Value | Escl.(%) | Amount | Bidding\rUnit |
1 | Schedule 1-MS Items Part A | 13656972.75 | Above/\rBelow/Par | ||||||
2 | 1 | 031024 | 1.00 | cum | 1743.95 | 1743.95 | AT Par | 1743.95 | |
3 | Description:- Providing and laying cement concrete, up to plinth in retaining walls, walls (any thickness) including\rattached plasters, columns, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed\rblocks, anchor blocks, plain window sills, fillets etc, excluding the cost of cement and of shuttering, centering.\r1:1.5:3 (1cement : 1.5 sand : 3 graded stone aggregate 20mm nominal size) | ||||||||
4 | 2 | 033061 | 0.40 | Tonne | 6049.00 | 2419.60 | AT Par | 2419.60 | |
5 | Description:- Supply and using cement at worksite : OPC 43 grade | ||||||||
6 | 3 | 222220 | 48.00 | Each\rPlate | 5261.40 | 252547.20 | AT Par | 252547.20 | |
7 | Description:- Dismantling of existing bed plate from existing bed block by cutting & removal of HD bolts and nuts\rwith all tools, plants, machinery scaffolding, labour and other materials and shiting it at one end of the bridge\rduring traffic block. | ||||||||
8 | 4 | 211231 | 11610.00 | Kg | 1154.20 | 13400262.00 | AT Par | 13400262.00 | |
9 | Description:- Supply, fabrication and erection of bed plate of approved sizes in exact position over bed block on\rpier/abutments by giving full and even bearing, setting them on the layer of free flow non-shrinkable grouting\rcompound, scrapping or chipping of bed block, if required, fabrication and fixing of HD bolts of suitable sizes\ralongwith nuts, washers etc., drilling holes of required size, grouting of holes by epoxy mortar after fixing HD\rbolts. Total work to be done during traffic block Upto 12.2 m clear span |