| 1 | 0 | M&O | | | |
|---|
| 2 | 1 | Maintenance & operation of Electrical supply & Distribution system of MRS 11 KV Sub Sation of IRDE in three shifts, each shift of 08 hours including sundays and holidays,shift commencing from 0600 Hrs to 1400 Hrs, from 1400 to 2200 Hrs & 2200 Hrs to 0600 Hrs per day (i.e. three shifts in a day) by employing one ITI/5 year experience qualified Electrician (semi skilled) in each shift for entire system comprising of 11 KV HT VCB 400/630 Amps - 09 No's,Transfomer 11/0.433KVA,630 KVA -01 No's,GOD of cap - 12 No',Capacitor banks and their connected LT Panel boards, Change over switchs & Voltage stabilizers etc. installed inside and out side of MRS 11KVA Sub Stn of IRDE including repair/rectification of fault developed in and around electric system and equipment installed at MRS Yard and upkeep the electric installation operational & in working conditions ,maintain day to day record of activitieson log sheet etc. complete all as specified and directed by Engr-in-Charge. (incl notes mentioned in srl No 2.01 to 2.03 here in after)\n | | 1002 | PER SHIFT |
|---|
| 3 | 2 | Maintenance & operation of Electrical supply & Distribution system of MRS 11 KV Sub Sation of DEAL in three shifts, each shift of 08 hours including sundays and holidays,shift commencing from 0600 Hrs to 1400 Hrs, from 1400 to 2200 Hrs & 2200 Hrs to 0600 Hrs per day (i.e. three shifts in a day) by employing one ITI/ 05 years experience qualified Electrician (semi skilled) in each shift for entire system comprising of 11 KV HT VCB400/630 Amps - 09 No's,Transfomer 11/0.433KV,630 KVA -01 No's, 400 KVA -01 No's & 400 KVA -01 No's ,GOD of cap - 12 No',Capacitor banks and their connected LT Panel boards, Change over switchs & Voltage stabilizers etc. installed inside and out side of MRS 11KVA Sub Stn and DG Set of capacity 1x125 KVA and 1x 250 KVA installed at 11KV MRS area of DEAL including repair/rectification of fault developed in and around electric system and equipment installed at MRS and upkeep the electric installation operational & in working conditions ,maintain day to day record of activities on log sheet etc. complete all as specified and directed by Engr-in-Charge. (including notes mentioned in srl No 2.01 to 2.03 here in after)\n | | 1002 | PER SHIFT |
|---|
| 4 | 2.01 | Note for item No.01 & 02:- (i) Carefully monitoring and operation of 11 KV take over point at IRDE /DEAL and also carefully monitoring and operation of all the GOD's in the 11 KV MRS yard.\n (ii) Carefully monitoring and operation of outdoor/indoor control panel and all 11 KV VCB's, and HT/LT panels, change over switch, incoming ACB/MCCB to connected load in the above area. \n (iii) Monitoring of battery charging bank for DC supply to numbers of relay and motors of VCB to ensure tripping. \n(iv) Carefully monitoring and operation of capacitor bank and to ensure that power factor shall not be less than 0.97\n (v) To monitor distribution transformer installed in MRS.\n(vi) To switch ON/OFF the security lights at MRS Yard and their complex as per time schedule fixed by Engineer-in-Charge. (vii) In case of any major fault in the equipments which is beyond the control of the operator, he will immediately intimate the same to the Engineer-in-Charge/JE . (viii) The operator shall monitor and maintain records of load/power factor etc. \n(ix) The operator shall attend all the complaints telephonically and maintain records in detail and submit complete details to Engineer-in-Charge/JEs for resolution, urgent complaints if any will immediately be intimated to Engineer-in-Charge/JEs \n(x) The operator shall carefully monitor and operate all HT/LT panels, change over switch, GODO's incoming/outgoing ACB/MCCB to connected load in the above area. | | | |
|---|
| 5 | 2.02 | Notes for item No.01 & 02 contd :- \n(i) The stationary required for maintenance of records shall be made available by the contractor. \n(ii) Trimming of tree branches at regular intervals to maintain minimum clearance of 2 metere on both sides of 11 KV OH line in MRS Yard including maintain area in & around the installation neat & clean including repair/ rectification of DO fuses/jumpers/ACSR conductor with in on KM radius area of MRS. (iii). The rate quoted is deemed to be inclusive of the cost of log book and shut down register and cost of T &P for maint work, and minor consumables such as DO fuses, ACSR conductor jumper, PVC insulation tape, screws,Washers, Nails, Teflon tape, fuse wire, clips etc for day to day maintenance and repairs. (iv). The rate quoted is deemed to be inclusive of providing mobile communication system for each shift i.e. one with onduty electrician so that the complaints can be lodged and feed back can be obtained. \n(v). The contractor has to supply uniform to their employees for wearing during the working hours. The unit rate is deemed to include for the uniform.The pattern of the uniform shall be as decided by the Engineer-in-charge. \n(vi). The rate is deemed to be inclusive to maintain in & arround the installation neat, clean & trimming of tree. (vii). The rate is deemed to be inclusive to maintenace of records such as HT/LT shut down/ break down record etc as directed. (viii). The fuel for running of DG set will be issued by the Dept & the rate quoted is deemed to be inclusive for collection of fuel from POL store yard. | | | |
|---|
| 6 | 2.04 | General Notes for contract :- Rate quoted by the contractor shall deemed to be inclusive of following :-\n(1) Workers wage per person (a) Semi Skilled - Notified minimum wages as on bid submission end date\n(2) Employees state insurance @ 4.00% (employer contribution 3.25% & employee contribution 0.75%) on wages as per existing rules.\n(3)EPF, EPS, EDLIS and administrative charges @ 13% on wages as per existing rules. \n(4) Bonus @8.33% as per existing rules.\n(5) Contractor's over head and profit\n(6) LWC @ 1% on 1 to 5 above as per existing rules\n(7) GST @ 18% on 1 to 5 above as per existing rules. NOTE : -(i) In case the rates quoted by tenderer are less than the notified minimum wages as on bid submission end date including all statutory provisions such as EPF,GST,ESIC ,Bonus and LWC etc as applicable, his tender will be treated as Non- Bonafide and will not be considered for Acceptance. (ii) Total amount of contract as shown in Col 6 are (=) AT PAR the notified minimum wages as on Publish date of tender. The contractors will be quoted their rates in percentage on (+) ABOVE SIDE .The percentage rate quoted as (=) AT PAR and (-) MINUS SIDE, will be treated as Non- Bonafide and will not be considered for Acceptance and rejected during finical evaluation. | | | |
|---|