| 1 | 1 | Supply of 1st class picked Jhama Bricks(Traditional) at work site. | | 6986.56 | nos |
|---|
| 2 | 2 | Supply of Portland Cement at work site. | | 84.4153 | tonne |
|---|
| 3 | 3 | Supply of Stone Aggregate(single size): 20 mm nominal size at work site. | | 97.1409 | cum |
|---|
| 4 | 4 | Supply of Stone Aggregate(single size): 10 mm nominal size at work site. | | 44.8118 | cum |
|---|
| 5 | 5 | Supply of Stone Aggregate below 40 mm nominal size at work site. | | 141.953 | cum |
|---|
| 6 | 6 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) at work site. | | 141.953 | cum |
|---|
| 7 | 7 | Supply of coarse sand at work site. | | 95.9329 | cum |
|---|
| 8 | 8 | Hire charges of Shuttering plank (25mm-30mm thick) without Prop including all fittings at work site | | 1260.84 | Sqm |
|---|
| 9 | 9 | Supply of GI wire at work site. | | 128.164 | kg |
|---|
| 10 | 10 | Supply of Tor Steel Rods/HYSD bars/TMT bars (SAIL/TATA/RINL) (Fe415/Fe500/Fe500D conforms to IS:\n1786) at work site. | | 12816.4 | kg |
|---|
| 11 | 11 | Loading, unloading and stacking by Manual Means of Steel at work site | | 12.8164 | tonne |
|---|
| 12 | 12 | Supply of 1st class traditional bricks at work site. | | 31677 | nos |
|---|
| 13 | 13 | Supply of medium sand at work site. | | 35.6268 | cum |
|---|
| 14 | 14 | Supply of Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. at work site. | | 57.15 | Qtl |
|---|
| 15 | 15 | Supply of 1.5 mm thick ms sheet at work site. | | 30 | Sqm |
|---|
| 16 | 16 | Supply of Water thinnable cement primer for interior wall surface, having VOC content less than 50 gms/litre at work site. | | 178.134 | Liter |
|---|
| 17 | 17 | Supply of Coconut rope at work site. | | 6.25 | kg |
|---|
| 18 | 18 | Supply of Lime dust at work site. | | 7.5 | kg |
|---|
| 19 | 19 | Supply of Neem khol or other Oil seed cake at work site. | | 1964.75 | kg |
|---|
| 20 | 20 | Supply of Bone dust at work site. | | 1964.75 | kg |
|---|
| 21 | 21 | Supply of Neem oil 10000 ppm at work site. | | 78.59 | Liter |
|---|
| 22 | 22 | Supply of Bio Pesticidesat at work site. | | 78.59 | Liter |
|---|
| 23 | 23 | Supply of Bio Fungicides at work site. | | 78.59 | kg |
|---|
| 24 | 24 | Supply of Chloropyriphos 50% EC at work site. | | 157.18 | Liter |
|---|
| 25 | 25 | Supply of G & Y Dwarf/ Coconut Saplings From Seed at work site. | | 440 | nos |
|---|
| 26 | 26 | Supply of Duranto Hedge Cutting at work site. | | 15278 | nos |
|---|
| 27 | 27 | Supply of Red oxide Zinc chromate primer at work site. | | 54.5771 | Liter |
|---|
| 28 | 28 | Supply of Synthetic enamel paint, having VOC ( Volatile Organic Compound content less than 150 gm/liitre at work site. | | 98.9326 | Liter |
|---|
| 29 | 29 | Display Board | | 1 | nos |
|---|