| 1 | 1 | Replacement of Damaged/Corroded pole 7.5/8 m | | | |
|---|
| 2 | 1.01 | Dismantling of 7.5/8m poles | item1 | 30 | E |
|---|
| 3 | 1.02 | EXCAVATION OF PITS (Manual/Machine) for 7.5/8m pole (1.25 X 0.6 X 1.5M) | item2 | 30 | Per / Pit |
|---|
| 4 | 1.03 | 7.5/8 Mtr poles/Loading | item3 | 30 | E |
|---|
| 5 | 1.04 | 7.5 /8 Mtr poles/Un Loading | item4 | 30 | E |
|---|
| 6 | 1.05 | Transport of 7.5 Mtrs/8.0 Mtr of polesincluding R.S J oist and Rail poles using Bullock Cart | | | |
|---|
| 7 | 1.06 | a.upto 8.0 km | item6 | 30 | LS |
|---|
| 8 | 1.07 | b. Above additional 1.0 KM or part there of by using Bullock cart (Certified by AEE) | item7 | 100 | Per Km |
|---|
| 9 | 1.08 | Erection of 7.5/8 Mtr Poles | item8 | 30 | E |
|---|
| 10 | 1.09 | Fixing of LT Three Phase cross arm | item9 | 30 | each |
|---|
| 11 | 1.1 | Releasing of LT Three Phase cross arm | item14 | 30 | each |
|---|
| 12 | 1.11 | Fixing of Single Phase Cross arm | item15 | 30 | each |
|---|
| 13 | 1.12 | Releasing of Single Phas Cross arm | item16 | 30 | each |
|---|
| 14 | 1.13 | Fixing of LT/HT TI Fitting | item17 | 15 | each |
|---|
| 15 | 1.14 | Releasing of LT/HT TI Fitting | item18 | 15 | each |
|---|
| 16 | 1.15 | Fixing of LT Pin Insulator | item19 | 90 | each |
|---|
| 17 | 1.16 | Releasing of LT Pin Insulator | item20 | 90 | each |
|---|
| 18 | 1.17 | Fixing of LT Shackle Insulator | item11 | 90 | each |
|---|
| 19 | 1.18 | Releasing of LT Shackle Insulator | item12 | 90 | each |
|---|
| 20 | 2 | Replacement of Damaged/Corroded pole 9.14 m/RSJ/Tubular Poles | | | |
|---|
| 21 | 2.01 | Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles | item14 | 10 | E |
|---|
| 22 | 2.02 | EXCAVATION OF PITS (Manual/Machine) for 9.14 Mtr Poles /9.0 Mtr PSC Poles/ All Metal\npoles(1.25x06x1.83M) | item15 | 10 | Per / Pit |
|---|
| 23 | 2.03 | 9.0 Mtr 400Kg/300KG / R.S.Joist /Tubular Poles upto 9.14 Mtr/ Square type pole (for\nsingle pole mound structure)/Loading | item16 | 10 | E |
|---|
| 24 | 2.04 | 9.0 Mtr 400Kg/300KG / R.S.Joist /Tubular Poles upto 9.14 Mtr/ Square type pole (for\nsingle pole mounted structure)/Un Loading | item17 | 10 | E |
|---|
| 25 | 2.05 | Fixing of 3 1/2 V Cross arm | item18 | 10 | each |
|---|
| 26 | 2.06 | Releasing of 3 1/2 V Cross arm | item19 | 10 | each |
|---|
| 27 | 2.07 | Fixing of 4 1/2 V Cross arm | item20 | 10 | each |
|---|
| 28 | 2.08 | Releasing of 4 1/2 V Cross arm | item21 | 10 | each |
|---|
| 29 | 2.09 | Fixing of 5 V Cross arm | item22 | 10 | each |
|---|
| 30 | 2.1 | Releasing of 5 V Cross arm | item23 | 10 | each |
|---|
| 31 | 2.11 | Fixing of tapping channel / Guarding \"X\" Arm | item24 | 5 | E |
|---|
| 32 | 2.12 | Releasing of tapping channel / Guarding \"X\" Arm | item25 | 5 | E |
|---|
| 33 | 2.13 | Fixing of 11/22KV Pin Insulator | item26 | 30 | Each |
|---|
| 34 | 2.14 | Releasing of 11/22KV Pin Insulator | item27 | 30 | each |
|---|
| 35 | 2.15 | Fixing of 22KV / 11 kv Strain Disc | item28 | 18 | Each |
|---|
| 36 | 2.16 | Releasing of 22KV / 11 kv Strain Disc | item28 | 18 | each |
|---|
| 37 | 3 | Set right the leaning of pole | | | |
|---|
| 38 | 3.01 | Set right the leaning of pole in HT / LT Cut point location | item28 | 16 | loc |
|---|
| 39 | 3.02 | Set right the leaning of pole in HT / LT Pin point location | item28 | 21 | loc |
|---|
| 40 | 4 | GUARDING ARRANGMENTS HT/LT | | | |
|---|
| 41 | 4.01 | Flat guarding | item28 | 5 | Span |
|---|
| 42 | 4.02 | Rearrangement of HT Lines for providing of Guarding\narrangements | item28 | 5 | Span |
|---|
| 43 | 4.03 | Rearrangement of LT Lines for providing of Guarding\narrangements | item28 | 5 | Span |
|---|
| 44 | 5 | Resagging of lines for all sizes cut point location (Low sag rectification) | | | |
|---|
| 45 | 5.01 | a.Up to 7/2.59 mm ACSR including PVC cable upto 25sqmm | item28 | 12 | Km |
|---|
| 46 | 5.02 | b. 7/3.15&7/3.35 mm ACSR including PVC cable above\n25sqmm | item28 | 10 | Km |
|---|
| 47 | 6 | CONCRETING (INCLUDING , JELLY, SAND,Cement ETC.,\nsupplied by the Contractor) | | | |
|---|
| 48 | 6.01 | Clearing of Tree branches of coconut tree | item28 | 50 | Per tree |
|---|
| 49 | 6.02 | Clearing of Tree branches of Neem, Tamerind, country etc | item28 | 50 | Per tree |
|---|
| 50 | 6.03 | Clearing of Branches/ Trees with Bul Dozer / Leveling of Ground etc... | item28 | 10 | Per Hour |
|---|
| 51 | 7 | Replacement of detoriated earth pipe only | item28 | 40 | E |
|---|
| 52 | 8 | BREAKDOWN | | | |
|---|
| 53 | 8.01 | Labour can be engaged for the following works due to non availability of sufficient staff in presence of Foreman/LI | | | |
|---|
| 54 | 8.02 | a.Ground patrolling of HT lines during breakdown / routine patrolling | item28 | 20 | Km |
|---|
| 55 | 8.03 | b.Rectification of conductor snapping in HT line pin point | item28 | 20 | Per Span |
|---|
| 56 | 8.04 | b.Rectification of conductor snapping in HT line\ncut point | item28 | 20 | Per Span |
|---|
| 57 | 8.05 | c.Rectification of conductor snapping in LT line pin point | item28 | 25 | Per Span |
|---|
| 58 | 8.06 | c.Rectification of conductor snapping in LT line cut point | item28 | 20 | Per Span |
|---|
| 59 | 8.07 | d.Replacement of flashover HT pin insulator / LAS including jumpering, binding and transporting of required materials. | item28 | 30 | Loc |
|---|
| 60 | 8.08 | e.Replacement of flashover strain disc and PT insulator / LAS including jumpering, binding and transporting of required materials. | item28 | 30 | Loc |
|---|
| 61 | 8.09 | f.Inspection of HT Insulator / Disc / PT insulator pole to pole during breakdown / routine and premonsoon inspection. | item28 | 30 | Loc |
|---|
| 62 | 9 | Painting | | | |
|---|
| 63 | 9.01 | Painting of pole (Distemper) | item28 | 20 | Set |
|---|
| 64 | 9.02 | Painting of Metal structure (Red Oxide) | item28 | 5 | Struc |
|---|
| 65 | 9.03 | Painting of Metal structure (Aluminium 2coats) | item28 | 5 | Struc |
|---|