Maintenance And Repair To Water Supply Distribution System At Ward No . 43 , 44 And 45 In Zone No . 3 , Excavation For Foundation / Pipe Trenches In Earth , Soils Of All Types , Sand , Gravel And Soft Murum , Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc Comp . Lift 0 To 1 . 50 M Mjp / Dsr / 2019-20 / Page No . 33 I . No . 1 , Excavation For Foundation / Pipe Trenches In Hard Murum And Boulders , W . B . M . Road Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc Comp . Lift 0 To 1 . 50 M Mjp / Dsr / 2019-2020 / Page No . 33 I . No . 3 , Excavation For Foundation / Pipe Trenches In Soft Rock And Old Cement And Lime Masonry Foundation Asphalt Road By All Means Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc Comp . Lift 0 To 1 . 50 M Mjp / Dsr / 2019-2020 / Page No . 33 I . No . 5 , Excavation For Foundation / Pipe Trenches In Hard Rock And Concrete Road By Chiselling , Wedging , Line Drilling By Mechanical Means Or By All Means Other Than Blasting Including Trimming And Levelling The Bed , Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc Comp . Lift 0 To 1 . 50 M Mjp / Dsr / 2019-2020 / Page No . 34 I . No . 7 , Providing And Supplying Asbestos Cement Pressure Pipes Manufactured And Tested As Per Iso-160 Standards Of Following Class And Diameter In Standard Lengths Including Cost Of All Taxes ( Central And Local ) , Insurance , Railway Freight , Inspection Charges , Unloading From Railway Wagon , Loading Into Truck , Transporting To Departmental Store / Site , Unloading , Stacking Etc . Complete Mjp / Dsr / 2012-2013 / Page No . 57 . I . No . 1 , A ) Class 15 ( Test Pressure 1 . 5 Mpa ) , 80Mm , 100Mm , 150Mm , 200Mm , Lowering , Laying And Jointing With Cid Joints , A . C . Pressure Pipes And Ci Or Ms Specials Of Following Class And Diameters Including Conveyance From Stores To Site Of Works , Cost Of Labour And Material , Giving Satisfactory Hydraulic Testing , Etc . As Per Isi Code , Etc . Complete But Excluding Cost Of C . I . D . Joints , Nut Bolts , Rubber Rings . Mjp / Dsr / 2012-2013 / P . No . 59 I . No . 4 ( A ) , A ) Class 15 ( Test Pressure 1 . 5 Mpa ) , 80Mm , 100Mm , 150Mm , 200Mm , Providing D . I . Pipes ( Push On Joints Pressure Pipes Of Di Of Following Class And Diameters Confirming To The Is Specification Inclusive Cost Of Jointing Materials ( Rubber Gasket Of Epdm Quality ) Excluding Gst Levied By Goi & Gom In All Respect Including Third Party Inspection Charges Of Tpi Agency Approved By Mjp Including Transit Insurance , Railway Freight , Unloading From Railway Wagon , Loading Into Truck , Transportation To Departmental Store / Site Of Work , Unloading , Stacking Etc . Complete As Directed By Engineer Incharge . ( Is-8329:2000 For Pipes & Is-158:1969 & Is-12820:1989 Or Latest Edition / Revision With Amendments For Rubber Gasket . ) Di K-7 Grade Mjp / Dsr / 2019-2020 / Page No . 59 I . No . 3 , 100 Mm , 150 Mm , Lowering , Laying And Jointing With Sbr Rubber Gaskets C . I . & D . I . Pipes Of Various Classes With Ci / Ms Specials Of Following Diameters In Proper Position , Grade And Alignment As Directed By Engineer-In-Charge Including Conveyance Of Material From Stores To Site Of Work , Excluding Cost Of Jointing Materials And Rubber Rings , Including Labour , Etc Complete . Note: Only Sbr Rubber Gaskets To Be Used As Per Is- 5382 / 12820 Mjp / Dsr / 2019-2020 / Page No . 58 I . No . 2 ( A ) , 100 Mm , 150 Mm , Cutting And Champhering Of Pipes Of Following Diameters Including Cost Of All Materials And Labour Involved , Etc . Complete As Directed By Engineer-In-Charge . ( For All Class Of Pipes ) Mjp / Dsr / 2019-2020 / Page No . 136 I . No . 20 , 100 Mm , 150 Mm , 200 Mm , Providing And Supplying C . I . Detachable Joints Suitable For A . C . Pressure Pipes Manufactured As Per Is- 1538 / 1993 Standards Of Following Class And Dimeter Including Cost Of Insurance , Railway Freight , Inspection Charges , Unloading From Railway Wagon , Loading Into Truck , Transporting To Departmental Store , Unloading , Stacking And Cost Of Rubber Rings , Nut Bolts , Excluding Gst Levied By Goi & Gom In All Respect Etc . Complete . Mjp / Dsr / 2019-2020 / Page No . 64 I . No . 13 , Class 10 / 15 , 80 Mm , 100 Mm , 150 Mm , 200 Mm , Providing And Supplying I . S . I . Mark Rubber Gasket Suitable For C . I . Or D . I . Pipe Of All Class For Tyton Joints Including Inspection Charges , Transportation Upto Departmental Stores Excluding Gst Levied By Goi & Gom In All Respect Etc . Complete . Mjp / Dsr / 2019-2020 / Page No . 137 I . No . 21 ( A ) , 100Mm , 150Mm , 200Mm , Checking & Repairing Private Water Connection And Reconnecting The Same Etc Complete , Disconnection Of Unauthorised Private Water Connection Etc . Complete . , Providing Double Flanged Sluice Valves Confirming To Is- 2906 / 14846 Including Worm Gear Arrangements As Per Test Pressure , Stainless Steel Spindle , Caps , Including Inspection Charges , Transportation Upto Departmental Store , Unloading , Stacking Excluding Gst Levied By Goi & Gom In All Respect Etc . Complete . Pn-1 . 0 ( Without Bypass Arrangement ) Mjp / Dsr / 2019-2020 / Page No . 127 I . No . 2 ( A ) , 80 Mm , 100 Mm , 150 Mm , Lowering Laying And Jointing In Position Following C . I . D / F Reflux Valves , Butterfly Valves And Sluice Valves Including Cost Of All Labour , Jointing Material , Including Nut Bolts And Giving Satisfactory Hydraulic Testing , Etc Complete . Sluice Valves Mjp / Dsr / 2019-2020 / Page No . 130 I . No . 4 , 80 Mm , 100 Mm , 150 Mm , Removing Existing Cross Connection And Remaking The Same Etc Complete ( 70% Rate Of Making Cross Connection . ) Mjp / Dsr / 2019-2020 / Page No . 47 . I . No . 10 , 100 Mm , 150 Mm , 200 Mm , Removing And Refixing The Half Body Of Sluice Valves Including Excavation , Refilling , Cost Of Rubber Packing , Nut Bolts , With Gate , Gland Rope , Repair By Welding Etc Complete ( 70 % Rate Of Laying Sluice Valves ) Mjp / Dsr / 2019-2020 / Page No . 130 I . No . 4 , 80 Mm , 100 Mm , 150 Mm , 200 Mm , 250 Mm , 300 Mm , 350 Mm , 400 Mm , Providing And Supplying S . S . Spindle Rod As Per Standard Specifications And Suitable For Sluice Valves Etc Complete . ( As Per Market Rate ) , 80 Mm , 100 Mm , 150 Mm , 200 Mm , Providing And Supplying Gun Metal Check Nut Of Following Diameter Of Sluice Valves As Per Standard Specificatio