Power Government Departments Closing in 0 days TDR #26204202

Annual Rate Contract For Maintenance Of Boiler Pressure Parts Of Stage I And Stage Ii , Btps Under B And A Dept . , Btps , Wbpdcl Annual Rate Contract For Maintenance Of Boiler Pressure Parts Of Stage I And Stage Ii , Btps Under B And A Dept .

Issued by Government Departments · Bandel Thermal Power Station, Hooghly, West Bengal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
08 Jan 2021
0 days left
EMD
50000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bandel Thermal Power Station, Hooghly → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Annual Rate Contract For Maintenance Of Boiler Pressure Parts Of Stage I And Stage Ii , Btps Under B And A Dept . , Btps , Wbpdcl Annual Rate Contract For Maintenance Of Boiler Pressure Parts Of Stage I And Stage Ii , Btps Under B And A Dept . , Btps , Wbpdcl , Maintenence Of Boiler Pr . Parts Stage I Unit Capacity 60Mwx2 , Economiser Tube Joint Tube Od 51 Mm , Thickness 4 . 8 Mm , Material: Sa 210 Gr . C Or Equivalent , Insert At Furnace Wall , Goose Neck S-Pannel & Roof Tube ( 1 Insert = 02 Nos . Joint ) Tube Od: 63 . 5 Mm To 69 . 9 Mm , Thickness From 5 . 1 To 6 . 3 Mm , Material: Sa 210 Gr . A Or Equivalent , Joint At Saturated Screen Roof & Side Wall , Screen Tube , Primary Superheater Tube , Secondary Superheater Tube . ( Od: 63 . 5 Mm , Thickness: 5 Mm Upto 6 . 9 Mm , Material: Sa213t11 Or Equivalnt ) , Insert At Furnace Wall , Goose Neck S-Pannel & Roof Tube ( 1 Insert = 02 Nos . Joint ) Tube Od: 63 . 5 Mm To 69 . 9 Mm , Thickness From 5 . 1 To 6 . 3 Mm , Material: Sa 210 Gr . A Or Equivalent , Joint At Saturated Screen Roof & Side Wall , Screen Tube , Primary Superheater Tube , Secondary Superheater Tube . ( Od: 63 . 5 Mm , Thickness: 5 Mm Upto 6 . 9 Mm , Material: Sa213t11 Or Equivalnt ) , Insert At Furnace Wall , Goose Neck S-Pannel & Roof Tube ( 1 Insert = 02 Nos . Joint ) Tube Od: 63 . 5 Mm To 69 . 9 Mm , Thickness From 5 . 1 To 6 . 3 Mm , Material: Sa 210 Gr . A Or Equivalent , Joint At Saturated Screen Roof & Side Wall , Screen Tube , Primary Superheater Tube , Secondary Superheater Tube . ( Od: 63 . 5 Mm , Thickness: 5 Mm Upto 6 . 9 Mm , Material: Sa213t11 Or Equivalnt ) , Maintenence Of Boiler Pr . Parts Stage Ii Unit Capacity 215 Mwx1 , Lp Water Cleaning Economizer Zone , Psh & Prh , Joint For Lnsertion Of Water Wall Tube , Cage Rear Wall Below Main Cavity & Baffle Wall Tube Below Main Cavity , Size: 63 . 5X5 . 4 , Mat: Bs3059 / 45S2 Or 5A210gr . C , Insertion Joint For Division Wall Tube Size: 82 . 5X7 , Mat: Bs3059 / 45S2; Or Sa210gr . C , Joint For Lnsertion Of Furnace Roof , Cage Rear Wall & Baffle Wall Tube Above Main Cavity , Size: 63 . 5X4 . 8 , Mat: Bs3059 / 620S2 Or Sa213t11 , Joint For Insertion Of Economiser Tube Size: 38 . 1X3 . 6 , Mat: Bs3o59 / 45S2 Or Sa210gr . C , Insertion Joint Of Psh Bottom & Middle Size:57 . 1X6 , Mat: Bs3059 / 620S2 Or Sa213t11 , Joint For Insertion Of Psh Top Bank Tube Tube , Size: 63 . 5X3 . 6 , Mat: Bs3059 / 33S2 Or Sa210gr . C , Insertion Joint Of Prh Bottom & Middle Size: 57X3 . 2 , Mat: Bs3059 / 620S2 Or Sa213t11 , Joint For Lnsertion Of Prh Top Bank Tube Size: 57X3 . 2 , Mat: Bs3059 / 620S2 Or Sa213t11 , Joint For Lnsertion Of Plsh And Fsh Inlet Tube , Size: 44 . 5X7 , Mat: Sa213t22 , Joint For Lnsertion Of Fsh & Frh Tube Size: 50 . 8X3 . 6 , Mat: Sa213t91 , Economiser / Psh / Prh Coil Lifting , Inspection Repairing And Fitting With Proper Alignment ( If Required For Preventive Inspection Beyond The Leakage Area ) , Platen Sh , Fsh , Frh Coil Pulling Inspection And Proper Alignment Of Coil And Panel With Clit And Support Welding , Second Pass Scaffolding Per 6 Meter , Common Work For Stage I & Ii , Stress Relieving , Radiography , Lremoval And Refitting Of Refractory , Replacement Of High Pressure Valve Size Upto 2 , Replacement Of High Pressure Line ( 1 / 2 To 4 ) ( Unit Of 01 Number Includes Two Joints ) , Deinsulation & Insulation With Cladding Of Wall , Casing And Pipe And Other Area Of Boiler , Hp Valve Welding From 50 Nb Upto 100 Nb Pipe , Hp Valve Gland Packing Replacement Upto 6 , Hp Valve Servicing Including Gland Packing & Bonnet Seal Replacement Upto 4 , D-Metering Of Boiler Tube At Any Area Of Boiler For Thickness Measurement ( Minimum Survey 150 Nos . / Day ) , Minimum Mobilization Charge If Total Executed Job Value Less Than Rs . 15000 . 00 , Vertical Scaffolding For Approaching Roof Tube / Wall Reheater / Mrh / Platen / Division Panel ( Per 6 Meter Vertical ) For Stage I & For Approaching Furnace / Roof Tube / Pendent Reheater / Platen / Fsh & Division Panel ( Per 6 Meter Vertical ) For Stage Ii , Horizontal Scaffolding For Approaching Platen Sh / Divisional Wall / Scw / Roof Tubes / Furnace ( Per 6 Meter Horizontal ) For Stage I & For Approaching Rh / Platen Sh / Final Sh / Divisional Panel / Scw / Roof Tubes / Furnace ( Per 6 Meter Horizontal ) For Stage Ii , Guard Tube And Guard Plate Removal , Fabrication And Fitting , Build Up In Eroded Tubes As Per Requirement , Repairing Of Skin Casing , Fabrication Of Bends Of Any Degree Of Any Boiler Tube , Fitting And Welding Of Tube Attachment Wherever Require , Membrane Strip Fitting & Welding , Fabrication And Erection Of Steel Items By Ms Plate / Ms Angle / Ms Channel / I Beam Etc . , Boiler Metal Temp Tc & Mounting Replace , Thermowell Replacement In Hp Line , Gst

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 31-Dec-2020 Extension of Dates Date 08-Jan-2021

BOQ

Sub. :Annual Rate Contract for maintenance of Boiler Pressure Parts of Stage-I and Stage-II, BTPS under B&A Dept., BTPS, WBPDCL
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Maintenence of Boiler Pr. Parts Stage I\nUnit capacity 60MWx2\n
21.01ECONOMISER TUBE JOINT\nTube OD 51 mm, Thickness 4. 8 mm, Material: SA 210 GR. C or equivalent\n\n\nBI01010001010000000000000515BI010000111315NUMBER
31.02INSERT AT FURNACE WALL, GOOSE NECK\nS-PANNEL & ROOF TUBE (1 insert = 02 nos. joint) Tube OD:\n63. 5 mm TO 69. 9 mm, Thickness from 5. 1 to 6. 3 mm, Material: SA 210 GR. A or equivalent\nBI01010001010000000000000515BI010000111415NUMBER
41.03JOINT AT SATURATED SCREEN\nROOF & SIDE WALL, SCREEN TUBE, PRIMARY SUPERHEATER TUBE, SECONDARY SUPERHEATER TUBE. (OD: 63. 5 mm, Thickness: 5 mm upto 6. 9 mm, Material: SA213T11 OR EQUIVALNT)\nBI01010001010000000000000515BI01000011157NUMBER
51.04INSERT AT FURNACE WALL, GOOSE NECK\nS-PANNEL & ROOF TUBE (1 insert = 02 nos. joint) Tube OD:\n63. 5 mm TO 69. 9 mm, Thickness from 5. 1 to 6. 3 mm, Material: SA 210 GR. A or equivalent\nBI01010001010000000000000515BI01000011167NUMBER
61.05JOINT AT SATURATED SCREEN\nROOF & SIDE WALL, SCREEN TUBE, PRIMARY SUPERHEATER TUBE, SECONDARY SUPERHEATER TUBE. (OD: 63. 5 mm, Thickness: 5 mm upto 6. 9 mm, Material: SA213T11 OR EQUIVALNT)\nBI01010001010000000000000515BI01000011175NUMBER
71.06INSERT AT FURNACE WALL, GOOSE NECK\nS-PANNEL & ROOF TUBE (1 insert = 02 nos. joint) Tube OD:\n63. 5 mm TO 69. 9 mm, Thickness from 5. 1 to 6. 3 mm, Material: SA 210 GR. A or equivalent\nBI01010001010000000000000515BI01000011183NUMBER
81.07JOINT AT SATURATED SCREEN\nROOF & SIDE WALL, SCREEN TUBE, PRIMARY SUPERHEATER TUBE, SECONDARY SUPERHEATER TUBE. (OD: 63. 5 mm, Thickness: 5 mm upto 6. 9 mm, Material: SA213T11 OR EQUIVALNT)\nBI01010001010000000000000515BI01000011196NUMBER
92Maintenence of Boiler Pr. parts Stage II\nUnit capacity 215 MWx1\nBI01010001010000000000000515BI0100001122
102.01LP water Cleaning\nEconomizer Zone, PSH & PRH\nBI01010001010000000000000515BI01000011231LUMPSUM
112.02Joint for lnsertion of water wall tube,\ncage rear wall below main cavity & baffle wall tube below main cavity, Size: 63. 5X5. 4, Mat: BS3059/45S2 or 5A210Gr. C\nBI01010001010000000000000515BI010000112440NUMBER
122.03Insertion joint for division wall tube\nSize: 82. 5X7, Mat: BS3059/45S2; or SA210Gr. C\n\nBI01010001010000000000000515BI010000112510NUMBER
132.04Joint for lnsertion of furnace roof,\ncage rear wall & baffle wall tube above main cavity, Size:\n63. 5X4. 8, Mat: BS3059/620S2 or SA213T11\nBI01010001010000000000000515BI010000112620NUMBER
142.05Joint for Insertion of economiser tube\nSize: 38. 1X3. 6, Mat: BS3O59/45S2 or SA210Gr. C\n\nBI01010001010000000000000515BI010000112770NUMBER
152.06Insertion joint of PSH bottom & middle\nSize:57. 1X6, Mat: BS3059/620S2 or SA213T11\nBI01010001010000000000000515BI010000112860NUMBER
162.07Joint for Insertion of PSH top bank tube\ntube, Size: 63. 5X3. 6, Mat: BS3059/33S2 or\nSA210Gr. C\nBI01010001010000000000000515BI010000112920NUMBER
172.08Insertion joint of PRH bottom & middle\nSize: 57X3. 2, Mat: BS3059/620S2 or SA213T11\nBI01010001010000000000000515BI010000113020NUMBER
182.09Joint for lnsertion of PRH top bank tube\nSize: 57X3. 2, Mat: BS3059/620S2 or SA213T11\nBI01010001010000000000000515BI01000011318NUMBER
192.1Joint for lnsertion of PLSH and FSH inlet tube, Size: 44. 5X7, Mat: SA213T22\nBI01010001010000000000000515BI010000113210NUMBER
202.11Joint for lnsertion of FSH & FRH tube\nSize: 50. 8X3. 6, Mat: SA213T91\n\nBI01010001010000000000000515BI010000113310NUMBER
212.12Economiser/PSH/PRH coil lifting,\ninspection repairing and fitting with proper alignment (if required for preventive inspection beyond the leakage area)\n\nBI01010001010000000000000515BI010000113410NUMBER
222.13Platen SH, FSH, FRH coil pulling\ninspection and proper alignment of coil and panel with clit and support welding\n\nBI01010001010000000000000515BI01000011357NUMBER
232.14Second pass scaffolding Per 6 Meter\nBI01010001010000000000000515BI01000011364NUMBER
243Common work for Stage I & IIBI01010001010000000000000515BI0100001137
253.01Stress RelievingBI01010001010000000000000515BI01000011385DAYS
263.02Radiography\nBI01010001010000000000000515BI01000011397DAYS
273.03LRemoval and refitting of refractory\nBI01010001010000000000000515BI01000011407TONNE
283.04Replacement of high pressure valve size upto 2''\n\n\nBI01010001010000000000000515BI01000011415NUMBER
293.05Replacement of high pressure line\n(1/2'' to 4'' ) (Unit of 01 \"Number\" includes two joints)\n\nBI01010001010000000000000515BI010000114210NUMBER
303.06Deinsulation & insulation with cladding\nof wall, casing and pipe and other area of boiler\n\nBI01010001010000000000000515BI0100001143100SQUARE METER
313.07HP Valve Welding from 50 NB upto 100 NB\npipe\n\nBI01010001010000000000000515BI01000011442NUMBER
323.08HP valve gland packing replacement\nupto 6\"\n\nBI01010001010000000000000515BI01000011457NUMBER
333.09HP valve servicing\nincluding gland packing & bonnet seal replacement upto 4\"\n\nBI01010001010000000000000515BI01000011464NUMBER
343.1D-metering of boiler tube\nat any area of boiler for thickness measurement (minimum survey 150 nos. /day)\n\nBI01010001010000000000000515BI01000011478DAYS
353.11Minimum mobilization charge\nif total executed job value less than Rs. 15000. 00\n\nBI01010001010000000000000515BI01000011484NUMBER
363.12Vertical scaffolding\nfor approaching Roof Tube/ Wall Reheater/ MRH/ Platen/ Division panel (Per 6 Meter Vertical) for Stage I & for approaching Furnace/ Roof Tube/ Pendent Reheater/ Platen/FSH & Division panel (Per 6 Meter Vertical) for Stage II\n\nBI01010001010000000000000515BI010000114912NUMBER
373.13Horizontal scaffolding for approaching Platen SH/ Divisional wall/ SCW/ Roof Tubes/Furnace (Per 6 Meter horizontal) for Stage I & for approaching RH/ platen SH / Final SH / Divisional Panel/SCW/ Roof Tubes/ Furnace (per 6 meter horizontal)for Stage II\nBI01010001010000000000000515BI01000011508NUMBER
383.14Guard Tube and Guard Plate\nRemoval, Fabrication and Fitting\nBI01010001010000000000000515BI010000115170NUMBER
393.15Build up in eroded Tubes\nas per requirement\n\nBI01010001010000000000000515BI010000115250SQUARE INCH
403.16Repairing of skin casing\nBI01010001010000000000000515BI010000115370METER
413.17Fabrication of bends of any degree\nof any boiler tube\n\nBI01010001010000000000000515BI010000115420NUMBER
423.18Fitting and welding of tube attachment\nwherever require\n\nBI01010001010000000000000515BI010000115580NUMBER
433.19Membrane strip fitting & welding\nBI01010001010000000000000515BI0100001156200METER
443.2Fabrication and erection of Steel items\nby MS plate/ MS Angle/ MS channel/ I Beam etc.\n\nBI01010001010000000000000515BI01000011572TONNE
453.21Boiler metal temp TC & mounting replace\nBI01010001010000000000000515BI01000011584NUMBER
463.22Thermowell replacement in HP line\n\nBI01010001010000000000000515BI01000011592NUMBER
474GSTBI01010001010000000000000515BI01000011981PERCENTAGE

AI Tender Summary

OUR REF NO 26204202
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 08-01-2021
Authority
Authority Name West Bengal Power Development Corporation Limited
Work Description Annual Rate Contract For Maintenance Of Boiler Pressure Parts Of Stage I And Stage Ii , Btps Under B And A Dept . , Btps , Wbpdcl Annual Rate Contract For Maintenance Of Boiler Pressure Parts Of Stage I And Stage Ii , Btps Under B And A Dept . , Btps , Wbpdcl , Maintenence Of Boiler Pr . Parts Stage I Unit Capacity 60Mwx2 , Economiser Tube Joint Tube Od 51 Mm , Thickness 4 . 8 Mm , Material: Sa 210 Gr . C Or Equivalent , Insert At Furnace Wall , Goose Neck S-Pannel & Roof Tube ( 1 Insert = 02 Nos . Joint ) Tube Od: 63 . 5 Mm To 69 . 9 Mm , Thickness From 5 . 1 To 6 . 3 Mm , Material: Sa 210 Gr . A Or Equivalent , Joint At Saturated Screen Roof & Side Wall , Screen Tube , Primary Superheater Tube , Secondary Superheater Tube . ( Od: 63 . 5 Mm , Thickness: 5 Mm Upto 6 . 9 Mm , Material: Sa213t11 Or Equivalnt ) , Insert At Furnace Wall , Goose Neck S-Pannel & Roof Tube ( 1 Insert = 02 Nos . Joint ) Tube Od: 63 . 5 Mm To 69 . 9 Mm , Thickness From 5 . 1 To 6 . 3 Mm , Material: Sa 210 Gr . A Or Equivalent , Joint At Saturated Screen Roof & Side Wall , Screen Tube , Primary Superheater Tube , Secondary Superheater Tube . ( Od: 63 . 5 Mm , Thickness: 5 Mm Upto 6 . 9 Mm , Material: Sa213t11 Or Equivalnt ) , Insert At Furnace Wall , Goose Neck S-Pannel & Roof Tube ( 1 Insert = 02 Nos . Joint ) Tube Od: 63 . 5 Mm To 69 . 9 Mm , Thickness From 5 . 1 To 6 . 3 Mm , Material: Sa 210 Gr . A Or Equivalent , Joint At Saturated Screen Roof & Side Wall , Screen Tube , Primary Superheater Tube , Secondary Superheater Tube . ( Od: 63 . 5 Mm , Thickness: 5 Mm Upto 6 . 9 Mm , Material: Sa213t11 Or Equivalnt ) , Maintenence Of Boiler Pr . Parts Stage Ii Unit Capacity 215 Mwx1 , Lp Water Cleaning Economizer Zone , Psh & Prh , Joint For Lnsertion Of Water Wall Tube , Cage Rear Wall Below Main Cavity & Baffle Wall Tube Below Main Cavity , Size: 63 . 5X5 . 4 , Mat: Bs3059 / 45S2 Or 5A210gr . C , Insertion Joint For Division Wall Tube Size: 82 . 5X7 , Mat: Bs3059 / 45S2; Or Sa210gr . C , Joint For Lnsertion Of Furnace Roof , Cage Rear Wall & Baffle Wall Tube Above Main Cavity , Size: 63 . 5X4 . 8 , Mat: Bs3059 / 620S2 Or Sa213t11 , Joint For Insertion Of Economiser Tube Size: 38 . 1X3 . 6 , Mat: Bs3o59 / 45S2 Or Sa210gr . C , Insertion Joint Of Psh Bottom & Middle Size:57 . 1X6 , Mat: Bs3059 / 620S2 Or Sa213t11 , Joint For Insertion Of Psh Top Bank Tube Tube , Size: 63 . 5X3 . 6 , Mat: Bs3059 / 33S2 Or Sa210gr . C , Insertion Joint Of Prh Bottom & Middle Size: 57X3 . 2 , Mat: Bs3059 / 620S2 Or Sa213t11 , Joint For Lnsertion Of Prh Top Bank Tube Size: 57X3 . 2 , Mat: Bs3059 / 620S2 Or Sa213t11 , Joint For Lnsertion Of Plsh And Fsh Inlet Tube , Size: 44 . 5X7 , Mat: Sa213t22 , Joint For Lnsertion Of Fsh & Frh Tube Size: 50 . 8X3 . 6 , Mat: Sa213t91 , Economiser / Psh / Prh Coil Lifting , Inspection Repairing And Fitting With Proper Alignment ( If Required For Preventive Inspection Beyond The Leakage Area ) , Platen Sh , Fsh , Frh Coil Pulling Inspection And Proper Alignment Of Coil And Panel With Clit And Support Welding , Second Pass Scaffolding Per 6 Meter , Common Work For Stage I & Ii , Stress Relieving , Radiography , Lremoval And Refitting Of Refractory , Replacement Of High Pressure Valve Size Upto 2 , Replacement Of High Pressure Line ( 1 / 2 To 4 ) ( Unit Of 01 Number Includes Two Joints ) , Deinsulation & Insulation With Cladding Of Wall , Casing And Pipe And Other Area Of Boiler , Hp Valve Welding From 50 Nb Upto 100 Nb Pipe , Hp Valve Gland Packing Replacement Upto 6 , Hp Valve Servicing Including Gland Packing & Bonnet Seal Replacement Upto 4 , D-Metering Of Boiler Tube At Any Area Of Boiler For Thickness Measurement ( Minimum Survey 150 Nos . / Day ) , Minimum Mobilization Charge If Total Executed Job Value Less Than Rs . 15000 . 00 , Vertical Scaffolding For Approaching Roof Tube / Wall Reheater / Mrh / Platen / Division Panel ( Per 6 Meter Vertical ) For Stage I & For Approaching Furnace / Roof Tube / Pendent Reheater / Platen / Fsh & Division Panel ( Per 6 Meter Vertical ) For Stage Ii , Horizontal Scaffolding For Approaching Platen Sh / Divisional Wall / Scw / Roof Tubes / Furnace ( Per 6 Meter Horizontal ) For Stage I & For Approaching Rh / Platen Sh / Final Sh / Divisional Panel / Scw / Roof Tubes / Furnace ( Per 6 Meter Horizontal ) For Stage Ii , Guard Tube And Guard Plate Removal , Fabrication And Fitting , Build Up In Eroded Tubes As Per Requirement , Repairing Of Skin Casing , Fabrication Of Bends Of Any Degree Of Any Boiler Tube , Fitting And Welding Of Tube Attachment Wherever Require , Membrane Strip Fitting & Welding , Fabrication And Erection Of Steel Items By Ms Plate / Ms Angle / Ms Channel / I Beam Etc . , Boiler Metal Temp Tc & Mounting Replace , Thermowell Replacement In Hp Line , Gst
Basic Detail
Tender No WBPDCL/BTPS/NIT/E1820/20-21
Bidding Type Tender
Location
City Bandel Thermal Power Station, Hooghly
State West Bengal
Key Dates
Publish Date 31 Dec 2020
Submission Date 08 Jan 2021
Open Date 11 Jan 2021
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 50000
Exemption Not Available
Document List
Tendernotice_1.pdf
CE69DF3B-B692-4CA3-A2CD-99C85FF4B160.html
BOQ_577717.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 31, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 08, 2021
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 08, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 11, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

html

CE69DF3B-B692-4CA3-A2CD-99C85FF4B160.html

xls

BOQ_577717.xls

TenderDetail
Loading tenders