Integral Coach Factory-ICF has published Longitudinal Beam Assembly For Kolkata Metro 3Ph Mc & Tc Under Frames. Submission Date for this Tender is 15-12-2020. Traction Motor Tenders in Tamil Nadu. Bidders can get complete Tender details and download the document.
0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | |
---|---|---|---|---|---|---|---|---|---|---|
0 | S.No. | PL Code\r(Group) | Item Type\rGST(Y/N) | Stock /\rNonStock | Ordering | Consider\rFor Eval | Approving\rAgency | Inspection\rAgency | Currency\rAllowed | Estimated\rRate |
1 | 1 | 36110050 | Goods (Y) | Stock | --- | Yes | RITES | INR | ||
2 | Description :LONGITUDINAL BEAM ASSEMBLY FOR KOLKATA METRO 3PH MC & TC UNDER FRAMES\rTO DRG.NO. MRM/TC-1-1-002 ALT " c " COL.I------- Special Condition : DESIGN OF KOLKATA METRO\rCOACHES WITH FULLY SUSPENDED TRACTION MOTORS MAY UNDERGO MINOR CHANGES AS PER\rTHE PROPULSION SYSTEM. HENCE, DRAWINGS TO BE FOLLOWED SHOULD BE CONFIRMED WITH\rICF BEFORE TAKING UP MANUFACTURING. - SHRINKAGE ALLOWANCE HAS BEEN CONSIDERED IN\rTHE TOLERANCE GIVEN FOR LENGTH AND SUITABLY PACKED. | |||||||||
3 | Consignee | Shell Depot | Tamil Nadu | 22.00 Numbers |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail