Extension Of Spf Building , H . O . Campus , Bhubaneswar
Tender Value
14.77 Lakhs
Estimated cost
Bid Submission
30 Dec 2020
0 days left
EMD
15000
Bank guarantee accepted
Document Fee
7080
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Bhubaneswar → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Extension Of Spf Building , H . O . Campus , Bhubaneswar
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-Dec-2020 | Due Date Extended | Admin Corrigendum Date Extend | 30-Dec-2020 |
BOQ
| Name of Work: EXTENSION OF SPF BUILDING (2ND FLOOR) AT H.O., BHUBANESWAR | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Reinforced Cement Concrete of M-20 Grade using 20 mm and down grade black CB hard Granite chipsincluding hoisting, laying , centering and shuttering etc all complete in First floor | |||
| 2 | 2 | a. For Columns and beams | 9.89 | cum | |
| 3 | 3 | b. For lintel | 2.28 | cum | |
| 4 | 4 | c. For roof slab | 19.17 | cum | |
| 5 | 5 | d. For Chajja/ Sunshade | 1.3 | cum | |
| 6 | 6 | Supplying HYSD bar reinforcement including cutting, straightening, bending, binding, tying the grills, placing in position including cost of binding wire, transportation, etc. all complete in Second floor | 35.93 | Qtl | |
| 7 | 7 | Brick work with Fly Ash bricks having crushing strength 75 Kg/sqm with dimensional tolerance 2% in cement mortar 1:6 in 2nd floor | 50.12 | cum | |
| 8 | 8 | 16mm thick Cement plastering in CM 1:6 in Second floor | 312.83 | Sqm | |
| 9 | 9 | 12mm thick Cement plastering in CM 1:4 for outside surface | 385.24 | Sqm | |
| 10 | 10 | Fixing of Ceramic floor tiles in floorson thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigments to match the colour of tile including rubbing, polishing all complete including cost of tiles for Second floor(toilet) | 11.07 | Sqm | |
| 11 | 11 | Fixing of Ceramic wall tiles in dado, skirting, etc on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigments to match the colour of tile including rubbing, polishing all complete including cost of tiles in Second floor(toilet) | 36.61 | Sqm | |
| 12 | 12 | Supplying, fitting, fixing vitrified tile in floors of size 600mmx600mm of approved make with application of polymer modified cement based water resistant adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved quality including cost of all materials, labour, T&P etc required for work in Second floor. | 133.99 | Sqm | |
| 13 | 13 | Supplying, fitting, fixing vitrified wall tile in dado, skirting, risers , walls over 12mm thick plaster 1:3 with application of polymer modified cement based water resistant adhesive bed of required thickness of 10mm and filling joints with epoxy grout of approved quality including cost of all materials, labour, T&P etc required for work in Second floor | 7.69 | Sqm | |
| 14 | 14 | Priming 1 coat over plastered surface S.Floor | 698.08 | Sqm | |
| 15 | 15 | Distempering 2 coats with distemper of approved shade on new work over 1 coat of wall primer including cost of distemper/ primer in Second floor | 471.82 | Sqm | |
| 16 | 16 | Providing and applying two coats weather coat of approved make and colour to exterior plastered surface over a coat of cement primer of approved quality as per manufacturers specification etc. complete including preparing the surface smooth to receive the paint with all labour, cost, transportation, scaffolding, T&P etc as per direction of engineer - in charge in Second floor. | 243.25 | Sqm | |
| 17 | 17 | Supplying, fitting, fixing of windows (sliding Type) made up aluminium section 151 - 154, 151-155 as window frame section,section no 151-155, 151--153 and 151-167 as shutter frame with 5mm black glass as pannel fitted with rubber beading,including locking arrangement incuding all fitting, cost of materials, taxes, labour, T&P etc complete as per the direction of engineers-in charge. | 17 | Sqm | |
| 18 | 18 | M.S grill for windows and ventilators incuding fitting, fixing, painting all complete for second floor | 366 | Kg | |
| 19 | 19 | Providing,fitting, fixing of Al door with OEL anidised Al door section of 9202 as vertical member,9201 as top member,and 9200 as bottom and middle member and 6 mm plain glass in top portion with 12mm thick prelaminated board in bottom portion fixed on door frame by means of tappered clip no 4660 and the frame to be completed by by means of jointing angles No 1855 including all cost, labour,T&P,hire charges of drilling machine, labour charges etc. complete in First Floor. | 11.38 | Sqm | |
| 20 | 20 | Providing and fixing of 50mm dia SS pipe as hand rail with 32mm x 32mm x2mm square pipe grouted to RCC as per drawing and design including cost of all materials, labour, coveyance, royalities, scaffolding , sundries, tools and plants all complete as per the direction of engineer in charge in first floor | 20 | Mtr. | |
| 21 | 21 | Supplying, fitting, fixing of FRP shutter with choukath as per standard drawing,fitting and fixing of the same in position with galvanised IS marked steel butt hinges fitting approved ISI marked anodised Aluminium fittings including supplying, fitting and fixing of hinged cleats, sand blocks, etc complete as per specification and direction of Engineer in charge with all materials, transportations, taxes, and conveyances etc all complete in Second floor. | 3.9 | Sqm | |
| 22 | 22 | Providing and fixing of fixed ventilator made up of M.S angle 20x20x5mm as outer members and 15x15x5 M.S Tee section as intermediate member and 5 mm glass panels fixed to the frame with beadingt, The sections are to be cut to length, with corner brackets and frames are to be fixed by concrete/ masonry walls by means of self expanding screws and glass to be used of 5mm reflective with all taxes completein Second Floor. | 60 | Sqm | |
| 23 | 23 | 2.5 cm thick grading concrete 1:2:2 on roof slab | 152.46 | sqm | |
| 24 | 24 | Add for electrical installation work | 1 | LS | |
| 25 | 25 | Add for electrical installation work PH and Sanitary Fittings | 1 | LS |
AI Tender Summary
Tender Timeline
Dec 29, 2020
11:30 IST
Tender Published
Tender notice published.
Completed
Dec 30, 2020
18:00 IST
Corrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedDec 30, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 31, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender