Delhi Jal Board-DJB has published Installing And Commissioning Of Horizontal Split Casing Pumps At Aravali Apartment Bps And 6 Block Kalkaji Bps .. Submission Date for this Tender is 14-12-2020. Pump Supply Tenders in EXECUTIVE ENGINEER (EM) WS SOUTH-I Delhi. Bidders can get complete Tender details and download the document.
Name of Work: Installing and commissioning of horizontal split casing pumps at Aravali Apartment BPS and 6 Block Kalkaji BPS. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1.01 | Dismantling of old/damaged centrifugal pump from the foundation by cutting of nut and bolts with the help of gas cutter and heavy labour with tools & tackles and removing of gap piece , sluice valve from suction and delivery side after fixing the blind flange in both suction and delivery side. | item1 | 2 | Jobs. |
2 | 2 | Supply of MS base frame suitable for pump set to be installed. | item2 | 2 | Nos. |
3 | 2.99 | Providing and fixing Blind flange on both suction and delivery line of 150 mm(1 No.), 125 mm (1 No.) and 100 mm (2 Nos.) size. | item3 | 4 | Nos. |
4 | 3.98 | Providing and fixing both side flange MS reducer 150mm/ 125 mm to modify suction and delivery line as per site requirement. | item4 | 1 | Jobs. |
5 | 4.97 | Providing and fixing both side flange MS reducer 125mm/ 100 mm to modify suction and delivery line as per site requirement. | item5 | 2 | Jobs. |
6 | 5.96 | Fixing of Base Frame with the help of new nut bolts. | item6 | 2 | Jobs. |
7 | 6.95 | Fixing of new pump with old motor using nut bolts etc. complete. | item7 | 2 | Jobs. |
8 | 7.94 | Fixing of new pump set on the new base frame I/C grouting of base frame with the help of anchor bolts after making the necessary alteration in the pump foundation to make the proper alignment testing the pump ON No Load and ON Full Load. | item8 | 2 | Jobs. |