| 1 | 1 | Supply of empty cement bags in good condition.[Ref : P.W.D.(Rds.), Page -325, Item-18,28] | | 300 | %Nos |
|---|
| 2 | 2 | Labour for filling up cement bags with sand and placing them up in position including tying and sewing mouth (cost of thread included) and all incidental charges complete but excluding cost of sand and sunny bags. [Ref : P.W.D.(Rds.), Page -325, Item-18,29] | | 300 | %Nos |
|---|
| 3 | 3 | Supply of silver sand.[Ref : P.W.D. (Bld.), Page – 300, Item-6.(d )] | | 9 | M3 |
|---|
| 4 | 4 | Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineer in-Charge.[Ref : P.W.D.(S&P), Page-100, It. – 28] | | 85 | Cum. |
|---|
| 5 | 5 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth [Ref: P.W.D (Bldg) 2017, Page - 15, Item.- 8] | | 125 | M3 |
|---|
| 6 | 6 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar [Ref : P.W.D.(Bldg) 2017, Page-189 , Item No. 1.i.(c)] | | 790 | M2 |
|---|
| 7 | 7 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.[Ref : P.W.D.(Bldg) 2017, Page- 192, Item No. 15] | | 790 | M2 |
|---|
| 8 | 8 | Dewatering by pumps including all leads, lifts and making all arrangements of disposal , where continuous flow of water from a source other than natural or ground water in encountered in case of emergency maintenance works related to leakage, breakage and making wet connections. [Ref : K.M.D.A. (Water supply) 2015, Page-82, It. -6.1] | | 450 | Hpr |
|---|
| 9 | 9 | GST 12% | | 1 | LS |
|---|
| 10 | 10 | Labour wellfare Cess 1% | | 1 | LS |
|---|