Catalyst And Adsorbent Replacement In Plant-205 ( Hgu ) And 206 ( Nht-Ccru ) Reactors / Psa Adsorbers During Refinery-Iii M And I Shutdown 2021 At Cpcl Manali, CPCL - Manali, Chennai-Tamil Nadu

Chennai Petroleum Corporation Limited-CPCL has published Catalyst And Adsorbent Replacement In Plant-205 ( Hgu ) And 206 ( Nht-Ccru ) Reactors / Psa Adsorbers During Refinery-Iii M And I Shutdown 2021 At Cpcl Manali. Submission Date for this Tender is 08-01-2021. Reactor Tenders in CPCL - Manali, Chennai Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

26158084
Corrigendum : Catalyst And Adsorbent Replacement In Plant-205 ( Hgu ) And 206 ( Nht-Ccru ) Reactors / Psa Adsorbers During Refinery-Iii M And I Shutdown 2021 At Cpcl Manali
Open Tender
Indian
Tamil Nadu
CPCL - Manali, Chennai
08-01-2021

Tender Details

Catalyst And Adsorbent Replacement In Plant-205 ( Hgu ) And 206 ( Nht-Ccru ) Reactors / Psa Adsorbers During Refinery-Iii M And I Shutdown 2021 At Cpcl Manali , Part-A Catalyst Replacement - Sor , Plant-205 Adsorbent Replacement , Carryout Complete Adsorbent Replacement In Psa Adsorbers ( 205-C-24A , B , C , D , E , F , G , H , I , J , K&L ( 12 Vessels ) ) At Normal Atmosphere Condition As Per The Enclosed Scope Of Work , Detailed Work Pacakge , Uop Unloding / Loading Procedures And Scope Of Supply And All Other Attachments . , Mobilisation And Demobilisation Charges For Equipments , Tools & Tackles For Plant -205 Adosrbent Replacement In 12 Vessels . , Plant-206 Reactor Catalyst Replacement Carryout Complete Replacement Of Catalyst In Plant-206 ( Ccru ) Reactors As Per The Enclosed Scope Of Work , Detailed Work Pacakge And Scope Of Supply , Catalyst Unloading / Loading Procedures And All Annexures . , Carryout Complete Replacement Of Catalyst In 206-R-01 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-02 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-03 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-04 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-05 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-110 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-201 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Adsorbent In 206-X-201-Ad-101A & 101B As Per The Enclsoed Scope Of Work And Other Attachments . , Carryout Complete Replacement Of Adsorbent In 206-X-202-Ad-101A &101B As Per The Enclsoed Scope Of Work And Other Attachments . , Carryout Complete Replacement Of Adsorbent In 206-C-14A & 14B As Per The Enclsoed Scope Of Work And Other Attachments . , Carryout Complete Replacement Of Adsorbent In 206-C-142A & 142B As Per The Enclsoed Scope Of Work And Other Attachments . , Carryout Complete Replacement Of Adsorbent In 206-C-06B As Per The Enclsoed Scope Of Work And Other Attachments . , Mobilisation And Demobilisation Charges For Equipments , Tools & Tackles For Plant -206 Reacctors Catalyst / Adosrbent Replacement . , Part-B Unit Rate Sor , Blinding And De-Blinding The Job Includes Collection & Transportation Of Required Quantity Of Materials Like Blinds , Gaskets , Fasteners , Etc . , From Owners Storage Point , Loosening & Tightening Of Studs ( Cold / Gas Cutting If Required ) , Wedge Opening , Cleaning Of Flanges , Insertions And Removal Of Blind & Gaskets , Providing New Gaskets After Removal Of Blinds , Overhauling Of Fasteners Using Oil , Replacing The Defective Studs / Nuts To Ensure Zero Leak Of Joints Including Hot Bolting . The Job Also Includes Supplying Of All Types Of Tools & Tackles , Lifting Arrangements Like Chain Pulley Blocks , Machineries , All Consumables And Labour To Complete The Job In All Respects , Transportation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions . , Blinding And Deblinding For 150# & 300# Ratings: , Blinding & Deblinding - Size Upto 1-1/2 Inch Dia . , Blinding & Deblinding - Size 2 Inch Dia . To 5 Inch Dia . , Blinding & Deblinding - Size 6 Inch Dia . To 10 Inch Dia . , Blinding & Deblinding - Size 12 Inch Dia . To 16 Inch Dia . , Blinding & Deblinding - Size 18 Inch Dia . To 24 Inch Dia . , Blinding And Deblinding For 600# & 900# Ratings: , Blinding & Deblinding - Size Upto 1-1/2 Inch Dia . , Blinding & Deblinding - Size 2 Inch Dia . To 5 Inch Dia . , Blinding & Deblinding - Size 6 Inch Dia . To 10 Inch Dia . , Blinding & Deblinding - Size 12 Inch Dia . To 16 Inch Dia . , Blinding & Deblinding - Size 18 Inch Dia . To 24 Inch Dia . , Supply , Erection & Dismantling Of Steel Scaffolding- For External Purpose - Insulation Removal , Thickness Gauging , Ndt Jobs The Job Includes Transportaiton Of Scaffolding Materials In Contractors Scope Of Supply , Erection Of Scaffolding At Site Covering The Areas Specified Including Providing Vertical Posts Of Pipes At Inter Distance Of 1 . 5M And Horizontal Numbers At A Inter Distance Of 0 . 5 To 0 . 75 Meter , Providing Rods At Corners To Give Sufficient Strength To The Structure , Placing The Wooden / Steel Planks / Frp Gratings On Top For Making Sufficient Area . Dismantling Scaffolding After Completion Of Job And Returning The Scaffolding Material To Specified Place Including All Tools , Tackles , Consumables , Labours And Contractors Supervision As Directed By The Engineer-In-Charge . Note: I ) For Measurement In Sqm : 2 ( Length + Width ) X Height Area Covered By The Scaffolding Is To Be Taken . Ii ) Scaffolding Measurement To Be Done By Breaking The Height Into Parts As Per Height Slab Mentioned Below And Adopting Respective Rates Against Mentioned Height Slabs . , Supply , Scaffolding Erection & Dismantling ( External ) , Up To 6M Height , Above 6 M Up To 10 M Height , Above 10 M Up To 20 M Height , Above 20 M Up To 30 M Height , Buffing Of Weld Joints Job Involves Buffing And Cleaning Of Total Weld Area Of The Reactor / Vessel / Column Etc , Using Power Brush , Thejob Has To Be Completed In All Respect To The Entire Satisfaction Of The Engineer-In-Charge ( Each Length Of Buffing Will Be Up To Width Of 150 Mm ) . Necessaty Buffing Tools/ Machineries And Consumables Are In Contractors Scope . Note: ( 1 ) For Weld Seam Buffing The Width Of Buffing Shall Be 150Mm ( I . E ) 75Mm On Both Sides Of The Weld Seam . , Power Tool Cleaning / Buffing To Sspc - Sp-2 / St3 Standards - 150 Mm Width Of Weld Seams / Haz . , Dye Penetration Test For Weld Joints Carryout Dp Test Of The Critical Weld Joints , New / Old Rtj Gakets / Rtj Gasket Seating Surface Areas As Per Cpcl Inspection Advice . Performance Of Dye Penetration Test Including Supply Of All Necessary Materials , Penetrant , Developer Etc , Along With All Equipments , Labour For Carrying Out The Work As Per Specification And Direction Of Engineer-In-Charge At All Elevations . Test Has To Be Carried Out In All Metallurgy The Test Has To Carry Out On All Schedule . , Dp Test Of Weld Joints ( One Unit Ea = One Inch Length ) , Opening & Boxing Up Of Manways / Covers ( Only For The Hoppers , Lift Pot , Drum ) The Job Involves Opening Of Manways , Covers By De-Bolting ( Cold / Gas Cutting If Required ) , Cleaning The Manways / Covers , Servicing Of Bolts , Replacing Defective Bolts / Nuts And Finally Boxing Up With Proper Gasket / Packing To Ensure Zero Leak Of Joints Including Hot Bolting . The Job Also Involves To & Fro Transporatation Of Gaskets , Studbolts , Packings , Etc . , Between The Work Site And The Owners Storage Point . The Job Also Includes Supplying Of All Types Of Tools & Tackles , Lifting Arrangements Like Chain Pulley Blocks , Suitable Slings / Belts , Etc . , Machineries , All Consumables And Labour To Complete The Job In All Respects , Transportation Of Material From Owners Storage Point To The Work Site & Unused Materials Back To The Storage Point And Dumping The Generated Scrap Material To The Designated Place As Per Eic Instructions . , Opening & Boxing Up Of Manways / Covers - Flanges , Rating - 150 # And 300 # , Rating - 600 # And 900 # , Inside Cleaning . ( Only For The Hoppers ,

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 28-Dec-2020 Corrigendum No 1 - Catalyst and adsorbent replacement in Plant-205 (HGU) and 206 (NHT-CCRU) reactors / PSA adsorbers during Refinery-III M and I Shutdown 2021 at CPCL Manali Other 05-01-2021
2 30-Dec-2020 Corrigendum No.2 for Catalyst and adsorbent replacement in Plant-205 (HGU) and 206 (NHT-CCRU) reactors / PSA adsorbers during Refinery-III M and I Shutdown 2021 at CPCL Manali Other 05-01-2021
3 05-Jan-2021 Corrigendum No.3 for Catalyst and adsorbent replacement in Plant-205 (HGU) and 206 (NHT-CCRU) reactors / PSA adsorbers during Refinery-III M and I Shutdown 2021 at CPCL Manali Date 08-01-2021

Key Value

Document Fees
Refer document
EMD
INR 183000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Catalyst and adsorbent replacement in Plant-205 (HGU) & 206 (NHT-CCRU) reactors / PSA adsorbers during Refinery-III M&I Shutdown 2021 at CPCL-Manali
Sl. No. Item Description Item Code / Make Quantity Units
1 10 Part-A Catalyst Replacement - SOR Item 00010
2 10.01 Plant-205 Adsorbent Replacement Item 10.20
3 10.02 Carryout Complete Adsorbent replacement in PSA adsorbers ( 205-C-24A,B,C ,D,E,F,G,H,I,J,K&L(12 vessels) ) at normal atmosphere condition as per the enclosed scope of work, detailed work pacakge,UOP unloding / loading procedures and scope of supply and all other attachments. Item 10.30 208 TON
4 10.03 Mobilisation and Demobilisation charges for Equipments, Tools & Tackles for Plant -205 adosrbent replacement in 12 vessels. Item 10.40 1 LS
5 10.04 Plant-206 Reactor Catalyst Replacement \nCarryout complete replacement of catalyst in Plant-206 (CCRU) Reactors as per the enclosed scope of work, detailed work pacakge and scope of supply, catalyst unloading / loading procedures and all annexures. Item 10.50
6 10.05 Carryout Complete replacement of catalyst in 206-R-01 as per the enclsoed scope of work and other attachments including video graphy requirement. Item 10.60 5.7 M3
7 10.06 Carryout Complete replacement of catalyst in 206-R-02 as per the enclsoed scope of work and other attachments including video graphy requirement. Item 10.70 14 M3
8 10.07 Carryout Complete replacement of catalyst in 206-R-03 as per the enclsoed scope of work and other attachments including video graphy requirement. Item 10.80 6.4 M3
9 10.08 Carryout Complete replacement of catalyst in 206-R-04 as per the enclsoed scope of work and other attachments including video graphy requirement. Item 10.90 12.5 M3
10 10.09 Carryout Complete replacement of catalyst in 206-R-05 as per the enclsoed scope of work and other attachments including video graphy requirement. Item 10.100 22.6 M3
11 10.1 Carryout Complete replacement of catalyst in 206-R-110 as per the enclsoed scope of work and other attachments including video graphy requirement. Item 10.110 6.4 M3
12 10.11 Carryout Complete replacement of catalyst in 206-R-201 as per the enclsoed scope of work and other attachments including video graphy requirement. Item 10.120 5.4 M3
13 10.12 Carryout Complete replacement of adsorbent in 206-X-201-AD-101A & 101B as per the enclsoed scope of work and other attachments. Item 10.130 1 TON
14 10.13 Carryout Complete replacement of adsorbent in 206-X-202-AD-101A &101B as per the enclsoed scope of work and other attachments. Item 10.140 12 TON
15 10.14 Carryout Complete replacement of adsorbent in 206-C-14A & 14B as per the enclsoed scope of work and other attachments. Item 10.150 12 TON
16 10.15 Carryout Complete replacement of adsorbent in 206-C-142A & 142B as per the enclsoed scope of work and other attachments. Item 10.160 14 TON
17 10.16 Carryout Complete replacement of adsorbent in 206-C-06B as per the enclsoed scope of work and other attachments. Item 10.170 4 TON
18 10.17 Mobilisation and Demobilisation charges for Equipments, Tools & Tackles for Plant -206 Reacctors Catalyst / adosrbent replacement. Item 10.180 1 LS
19 20 Part-B Unit Rate SOR Item 00020
20 20.01 BLINDING AND DE-BLINDING \nThe job includes collection & transportation of required quantity of materials like blinds, gaskets, fasteners, etc., from owner's storage point, loosening & tightening of studs (cold / gas cutting if required), wedge opening, cleaning of flanges, insertions and removal of blind & gaskets, providing new gaskets after removal of blinds, overhauling of fasteners using oil, replacing the defective studs / nuts to ensure zero leak of joints including hot bolting. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportation of unused materials to owner's storage point and dumping the generated scrap material to designated area as per EIC instructions. Item 20.20
21 20.02 Blinding and deblinding for 150# & 300# ratings: Item 20.30
22 20.03 Blinding & Deblinding - Size Upto 1-1/2 inch dia. Item 20.40 50 EA
23 20.04 Blinding & Deblinding - Size 2 inch dia. to 5 inch dia. Item 20.50 50 EA
24 20.05 Blinding & Deblinding - Size 6 inch dia. to 10 inch dia. Item 20.60 25 EA
25 20.06 Blinding & Deblinding - Size 12 inch dia. to 16 inch dia. Item 20.70 20 EA
26 20.07 Blinding & Deblinding - Size 18 inch dia. to 24 inch dia. Item 20.80 5 EA
27 20.08 Blinding and deblinding for 600# & 900# ratings: Item 20.90
28 20.09 Blinding & Deblinding - Size Upto 1-1/2 inch dia. Item 20.100 100 EA
29 20.1 Blinding & Deblinding - Size 2 inch dia. to 5 inch dia. Item 20.110 100 EA
30 20.11 Blinding & Deblinding - Size 6 inch dia. to 10 inch dia. Item 20.120 50 EA
31 20.12 Blinding & Deblinding - Size 12 inch dia. to 16 inch dia. Item 20.130 25 EA
32 20.13 Blinding & Deblinding - Size 18 inch dia. to 24 inch dia. Item 20.140 10 EA
33 20.14 SUPPLY, ERECTION & DISMANTLING OF STEEL SCAFFOLDING- For External purpose - Insulation removal, thickness gauging, NDT jobs The job includes transportaiton of scaffolding materials in contractors scope of supply , erection of scaffolding at site covering the areas specified including providing vertical posts of pipes at inter distance of 1.5m and horizontal numbers at a inter distance of 0.5 to 0.75 meter, providing rods at corners to give sufficient strength to the structure, placing the wooden / steel planks / FRP gratings on top for making sufficient area. Dismantling scaffolding after completion of job and returning the scaffolding material to specified place including all tools, tackles, consumables, labours and contractor's supervision as directed by the Engineer-in-charge. NOTE: i) For measurement in SQM : 2( Length + Width) x height area covered by the scaffolding is to be taken. ii) Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs. Item 20.150
34 20.15 Supply, Scaffolding Erection & Dismantling (External) Item 20.160
35 20.16 Up to 6m height Item 20.170 2500 M2
36 20.17 Above 6 m up to 10 m height Item 20.180 2700 M2
37 20.18 Above 10 m up to 20 m height Item 20.190 1500 M2
38 20.19 Above 20 m up to 30 m height Item 20.200 500 M2
39 20.2 Buffing of weld Joints Job involves buffing and cleaning of total weld area of the Reactor / vessel / column etc, using power brush, thejob has to be completed in all respect to the entire satisfaction of the Engineer-in-charge ( each length of buffing will be up to width of 150 mm). Necessaty buffing tools/ machineries and consumables are in contractor's scope. NOTE: (1) For weld seam buffing the width of buffing shall be 150mm (i.e) 75mm on both sides of the weld seam. Item 20.210
40 20.21 Power tool cleaning / Buffing to SSPC - SP-2 / St3 standards - 150 mm width of Weld seams / HAZ. Item 20.220 200 M
41 20.22 Dye Penetration test for weld joints \nCarryout DP test of the Critical weld joints, New / Old RTJ Gakets / RTJ Gasket seating surface areas as per CPCL Inspection advice. Performance of dye penetration test including supply of all necessary materials, penetrant, developer etc, along with all equipments, labour for carrying out the work as per specification and direction of engineer-in-charge at all elevations. Test has to be carried out in all metallurgy the test has to carry out on all schedule. Item 20.230
42 20.23 DP test of weld joints (One Unit EA = One Inch Length) Item 20.240 500 EA
43 20.24 OPENING & BOXING UP OF MANWAYS / COVERS (Only for the Hoppers, lift pot, Drum) The job involves opening of manways, covers by de-bolting (cold / gas cutting if required), cleaning the manways / covers, servicing of bolts, replacing defective bolts / nuts and finally boxing up with proper gasket / packing to ensure zero leak of joints including hot bolting. The job also involves to & fro transporatation of gaskets, studbolts, packings, etc., between the work site and the owner's storage point. The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, suitable slings / belts, etc., machineries, all consumables and labour to complete the job in all respects, transportation of material from owner's storage point to the work site & unused materials back to the storage point and dumping the generated scrap material to the designated place as per EIC instructions. Item 20.250
44 20.25 Opening & boxing up of Manways / covers - Flanges Item 20.260
45 20.26 Rating - 150 # and 300 # Item 20.270 100 ID
46 20.27 Rating - 600 # and 900 # Item 20.280 300 ID
47 20.28 INSIDE CLEANING. (Only for the Hoppers, lift pot, Drum) The Job involves thorough cleaning of column / vessel / tank / Drum / Hopper surfaces internally by water, air, scrapper, wire brush etc., from top to bottom including all the internals like trays, downcomers, distributors, steam coil, nozzles, etc., The job also involves provision of ladder wherever necessary to facilitate cleaning / inspection, spot cleaning by emery, removal of sludges, debris, etc. & transportation to the earmarked location. NOTE: (1) Cleaned inner surface area of the column / vessel / tank / drum shall be considered for measurement.,, (2) No additional payment for cleaning of internals like distributors, steam coil, nozzles, etc., Item 20.290
48 20.29 Inside surface cleaning Item 20.300
49 20.3 Inside cleaning of Lower/Upper Hopper, Lift pot , Surge drum, Reduction chamber. Item 20.310 100 M2
50 20.31 OPENING OF FLANGE JOINT AND REPLACEMENT OF GASKETS (Other than Blinding / Deblinding flanges) Job involves opening of all types of flanged joints, valve bonent etc., at all elevations by debolting , cold or gas cutting of fasteners, cleaning of flange face revisiting of fasteners, providing proper rating of gaskets including cutting of new gaskets, and boxing up of flange joint. This also includes necessary capping / decamping of threaded joints, area cleaning, hot bolting etc. The size of the flange is mentioned in nominal bore ( DN ). Item 20.320
51 20.32 Size up to 25 MM Item 20.330 100 EA
52 20.33 Above 25 mm to 80 mm Item 20.340 200 EA
53 20.34 Above 80 mm to 200 mm Item 20.350 50 EA
54 20.35 Above 200 mm to 350 mm Item 20.360 10 EA
55 20.36 Above 450 mm to 600 mm Item 20.370 5 EA
56 20.37 Above 600 mm to 800 mm Item 20.380 5 EA
57 20.38 Hiring of Crane, Tractor Trailer, Fork lifts \nThe contractor shall mobilise the following equipments for completion of the entrire job in all respects. The contractor shall de mobilise the equipment on completion of the job with approval from EIC. If there is any extension of days the contractor shall obtain prior approval from EIC for retaining the equipements. For the extended days the rate will be paid on pro rata basis.Entry and exist Gate passes including the operators time sheet (duly signed by CPCL in charge on daily basis ) for all the below mentioned equipments to be enclosed along with bill for processing. Item 20.390
58 20.39 Hiring of 10 Ton 20 Feet Capacity Tractor Trailer with valid operator for transportaion of New catalysts/ Adsorbent stored in drums / jumbo bags from CPCL-Manali ware hosue to Refinery-3 Plant-205,206 Site area & Shifting of the removed old Catalysts / Adsorbent from Plant area to the place as identifed by EIC with in CPCL permises. Necessary Diesel is in Contractor scope. Minimum Capacity : 10 Ton, 20 Feet on round the clock basis. No of Tractor / Trailer required : 2 nos x 30 Days =60 Days Rate is inclusive of mobilisation and demobilisation. Item 20.400 60 DAY
59 20.4 Hiring of 5 Ton Capacity Fork lift with valid operator for transportaion of New catalysts/ Adsorbent stored in drums / jumbo bags from CPCL-Manali ware hosue to Refinery-3 Plant-205, 206 Site area & Shifting of the removed old Catalysts / Adsorbent from Plant area to the place as identified by EIC with in CPCL Permises. Necessary diesel is in contractor scope Minimum capacity : 5 Ton No of Fork lift requried : 2 nos x 30 Days : 60 Days on round the clock basis Rate is inclusive of mobilisation and demobilisation. Item 20.410 60 DAY
60 20.41 Hiring of 70 Ton capacity Crane with valid operator for Fresh catalyst loading , removal / Refixing of top manway / elbow piece and other allied maintenance jobs for Catalyst Replacement in plant-205 &206. Necessary diesel is in contractor scope Minimum capacity : 70 Ton, on round the clock basis No of Crane requried : 3 nos x 20 Days : 60 Days Rate is inclusive of mobilisation and demobilisation. Item 20.420 60 DAY
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail