Catalyst And Adsorbent Replacement In Plant-205 ( Hgu ) And 206 ( Nht-Ccru ) Reactors / Psa Adsorbers During Refinery-Iii M And I Shutdown 2021 At Cpcl Manali , Part-A Catalyst Replacement - Sor , Plant-205 Adsorbent Replacement , Carryout Complete Adsorbent Replacement In Psa Adsorbers ( 205-C-24A , B , C , D , E , F , G , H , I , J , K&L ( 12 Vessels ) ) At Normal Atmosphere Condition As Per The Enclosed Scope Of Work , Detailed Work Pacakge , Uop Unloding / Loading Procedures And Scope Of Supply And All Other Attachments . , Mobilisation And Demobilisation Charges For Equipments , Tools & Tackles For Plant -205 Adosrbent Replacement In 12 Vessels . , Plant-206 Reactor Catalyst Replacement Carryout Complete Replacement Of Catalyst In Plant-206 ( Ccru ) Reactors As Per The Enclosed Scope Of Work , Detailed Work Pacakge And Scope Of Supply , Catalyst Unloading / Loading Procedures And All Annexures . , Carryout Complete Replacement Of Catalyst In 206-R-01 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-02 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-03 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-04 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-05 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-110 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Catalyst In 206-R-201 As Per The Enclsoed Scope Of Work And Other Attachments Including Video Graphy Requirement . , Carryout Complete Replacement Of Adsorbent In 206-X-201-Ad-101A & 101B As Per The Enclsoed Scope Of Work And Other Attachments . , Carryout Complete Replacement Of Adsorbent In 206-X-202-Ad-101A &101B As Per The Enclsoed Scope Of Work And Other Attachments . , Carryout Complete Replacement Of Adsorbent In 206-C-14A & 14B As Per The Enclsoed Scope Of Work And Other Attachments . , Carryout Complete Replacement Of Adsorbent In 206-C-142A & 142B As Per The Enclsoed Scope Of Work And Other Attachments . , Carryout Complete Replacement Of Adsorbent In 206-C-06B As Per The Enclsoed Scope Of Work And Other Attachments . , Mobilisation And Demobilisation Charges For Equipments , Tools & Tackles For Plant -206 Reacctors Catalyst / Adosrbent Replacement . , Part-B Unit Rate Sor , Blinding And De-Blinding The Job Includes Collection & Transportation Of Required Quantity Of Materials Like Blinds , Gaskets , Fasteners , Etc . , From Owners Storage Point , Loosening & Tightening Of Studs ( Cold / Gas Cutting If Required ) , Wedge Opening , Cleaning Of Flanges , Insertions And Removal Of Blind & Gaskets , Providing New Gaskets After Removal Of Blinds , Overhauling Of Fasteners Using Oil , Replacing The Defective Studs / Nuts To Ensure Zero Leak Of Joints Including Hot Bolting . The Job Also Includes Supplying Of All Types Of Tools & Tackles , Lifting Arrangements Like Chain Pulley Blocks , Machineries , All Consumables And Labour To Complete The Job In All Respects , Transportation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions . , Blinding And Deblinding For 150# & 300# Ratings: , Blinding & Deblinding - Size Upto 1-1/2 Inch Dia . , Blinding & Deblinding - Size 2 Inch Dia . To 5 Inch Dia . , Blinding & Deblinding - Size 6 Inch Dia . To 10 Inch Dia . , Blinding & Deblinding - Size 12 Inch Dia . To 16 Inch Dia . , Blinding & Deblinding - Size 18 Inch Dia . To 24 Inch Dia . , Blinding And Deblinding For 600# & 900# Ratings: , Blinding & Deblinding - Size Upto 1-1/2 Inch Dia . , Blinding & Deblinding - Size 2 Inch Dia . To 5 Inch Dia . , Blinding & Deblinding - Size 6 Inch Dia . To 10 Inch Dia . , Blinding & Deblinding - Size 12 Inch Dia . To 16 Inch Dia . , Blinding & Deblinding - Size 18 Inch Dia . To 24 Inch Dia . , Supply , Erection & Dismantling Of Steel Scaffolding- For External Purpose - Insulation Removal , Thickness Gauging , Ndt Jobs The Job Includes Transportaiton Of Scaffolding Materials In Contractors Scope Of Supply , Erection Of Scaffolding At Site Covering The Areas Specified Including Providing Vertical Posts Of Pipes At Inter Distance Of 1 . 5M And Horizontal Numbers At A Inter Distance Of 0 . 5 To 0 . 75 Meter , Providing Rods At Corners To Give Sufficient Strength To The Structure , Placing The Wooden / Steel Planks / Frp Gratings On Top For Making Sufficient Area . Dismantling Scaffolding After Completion Of Job And Returning The Scaffolding Material To Specified Place Including All Tools , Tackles , Consumables , Labours And Contractors Supervision As Directed By The Engineer-In-Charge . Note: I ) For Measurement In Sqm : 2 ( Length + Width ) X Height Area Covered By The Scaffolding Is To Be Taken . Ii ) Scaffolding Measurement To Be Done By Breaking The Height Into Parts As Per Height Slab Mentioned Below And Adopting Respective Rates Against Mentioned Height Slabs . , Supply , Scaffolding Erection & Dismantling ( External ) , Up To 6M Height , Above 6 M Up To 10 M Height , Above 10 M Up To 20 M Height , Above 20 M Up To 30 M Height , Buffing Of Weld Joints Job Involves Buffing And Cleaning Of Total Weld Area Of The Reactor / Vessel / Column Etc , Using Power Brush , Thejob Has To Be Completed In All Respect To The Entire Satisfaction Of The Engineer-In-Charge ( Each Length Of Buffing Will Be Up To Width Of 150 Mm ) . Necessaty Buffing Tools/ Machineries And Consumables Are In Contractors Scope . Note: ( 1 ) For Weld Seam Buffing The Width Of Buffing Shall Be 150Mm ( I . E ) 75Mm On Both Sides Of The Weld Seam . , Power Tool Cleaning / Buffing To Sspc - Sp-2 / St3 Standards - 150 Mm Width Of Weld Seams / Haz . , Dye Penetration Test For Weld Joints Carryout Dp Test Of The Critical Weld Joints , New / Old Rtj Gakets / Rtj Gasket Seating Surface Areas As Per Cpcl Inspection Advice . Performance Of Dye Penetration Test Including Supply Of All Necessary Materials , Penetrant , Developer Etc , Along With All Equipments , Labour For Carrying Out The Work As Per Specification And Direction Of Engineer-In-Charge At All Elevations . Test Has To Be Carried Out In All Metallurgy The Test Has To Carry Out On All Schedule . , Dp Test Of Weld Joints ( One Unit Ea = One Inch Length ) , Opening & Boxing Up Of Manways / Covers ( Only For The Hoppers , Lift Pot , Drum ) The Job Involves Opening Of Manways , Covers By De-Bolting ( Cold / Gas Cutting If Required ) , Cleaning The Manways / Covers , Servicing Of Bolts , Replacing Defective Bolts / Nuts And Finally Boxing Up With Proper Gasket / Packing To Ensure Zero Leak Of Joints Including Hot Bolting . The Job Also Involves To & Fro Transporatation Of Gaskets , Studbolts , Packings , Etc . , Between The Work Site And The Owners Storage Point . The Job Also Includes Supplying Of All Types Of Tools & Tackles , Lifting Arrangements Like Chain Pulley Blocks , Suitable Slings / Belts , Etc . , Machineries , All Consumables And Labour To Complete The Job In All Respects , Transportation Of Material From Owners Storage Point To The Work Site & Unused Materials Back To The Storage Point And Dumping The Generated Scrap Material To The Designated Place As Per Eic Instructions . , Opening & Boxing Up Of Manways / Covers - Flanges , Rating - 150 # And 300 # , Rating - 600 # And 900 # , Inside Cleaning . ( Only For The Hoppers ,