Housing Urban and Rular Development Government Departments Closing in 0 days TDR #26157420

Construction Of 01 ( One ) No Masonry Well ( 6 . 0 Mtr Dia ) Providing And Laying Pipe Line In C Allied Works Within The Jurisdiction Of Dws Sub Division , Damcherra

Issued by Government Departments · Damcherra, Tripura
Tender Value
16.32 Lakhs
Estimated cost
Bid Submission
24 Dec 2020
0 days left
EMD
16324
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Damcherra → Tripura
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of 01 ( One ) No Masonry Well ( 6 . 0 Mtr Dia ) Providing And Laying Pipe Line In C Allied Works Within The Jurisdiction Of Dws Sub Division , Damcherra

BOQ

Name of Work: JJM Scheme in North Tripura District during the year 2020-21/ Construction of INNOVATIVE SCHEME by amalgamation of 2(two) nos Masonry Well followed by CWR(10000 Gallon)/ SH: Construction of 01(one) no Masonry Well (6.0 Mtr dia ) and providing & laying pipe line in/c allied works within the jurisdiction of DWS Sub-Division, Damcherra/ Gr.XIII
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Earth Work :-BI01010001010000000000000515BI0100001179
22Earthwork in excavation for structures as per drawing and MoRT&H technical specifications Clause 304 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.\nI) Ordinary Soil\nA) By Manual MeansBI01010001010000000000000515BI0100001180
33I) Upto 3 m depthBI01010001010000000000000515BI0100001181122.08Cum
44ii) 3 m to 6 m depthBI01010001010000000000000515BI0100001182122.08Cum
55iii)above 6 m depthBI01010001010000000000000515BI0100001183162.77Cum
66Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.\nAll kinds of soil.\nBI01010001010000000000000515BI01000011841.081Cum
77Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil cumBI01010001010000000000000515BI010000118554.401cum
88Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.\nBI01010001010000000000000515BI01000011862.324cum
99Cement Concrete Work :-BI01010001010000000000000515BI0100001187
1010Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering \n-All work upto plinth level: \ni) 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size)BI01010001010000000000000515BI01000011882.324Cum
1111Reinforced Cement Concrete Work :-BI01010001010000000000000515BI0100001189
1212Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement\n-All work upto plinth level:BI01010001010000000000000515BI0100001190
1313i) 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)BI01010001010000000000000515BI01000011911.549Cum
1414ii)1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)BI01010001010000000000000515BI01000011921.978Cum
1515Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement\n5.3.2.2) 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)BI01010001010000000000000515BI01000011936.771Cum
1616Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement\n5.2.2) 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)BI01010001010000000000000515BI01000011942.385Cum
1717Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. \n5.20.4) Thermo-Mechanically Treated bars/ Cold twisted deformed steel barsBI01010001010000000000000515BI01000011951585.38KG
1818Centering shuttering including struttings, propping etc. and removal of form work for:BI01010001010000000000000515BI0100001196
19195.9.5.1) Lintels, beams, plinth beams, girders, bressumers and cantilevers with shuttering plyBI01010001010000000000000515BI0100001197131.67Sqm
20205.9.6.2) Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plankBI01010001010000000000000515BI010000119824.28Sqm
2121Brick Work:-BI01010001010000000000000515BI0100001199
2222First class brick work in foundation and plinth including cost of all materials as required complete\n6.1.3) In cement mortar 1:4 ( 1 cement :4 fine sand).BI01010001010000000000000515BI010000120037.421Cum
2323First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete\n6.3.3) In cement mortar 1:4 ( 1 cement : 4 fine sand)BI01010001010000000000000515BI01000012013.719Cum
2424Finishing Work:-BI01010001010000000000000515BI0100001202
252512 mm cement plaster of mix \n12.1.2) In cement mortar 1 : 4 (1 cement : 4 fine sand)BI01010001010000000000000515BI0100001203116.14Sqm
2626Extra for plastering on circular work not exceeding 6 m in radius complete. \ni) In one coatBI01010001010000000000000515BI0100001204116.14Sqm
27276 mm cement plaster of mix : \n12.4.1) In cement mortar 1 : 3 (1 cement : 3 fine sand)BI01010001010000000000000515BI010000120534.29Sqm
2828Neat cement punning.BI01010001010000000000000515BI010000120620.95Sqm
2929Miscilenious Work:-BI01010001010000000000000515BI0100001207
3030Providing & laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil & bigger size towards the wall & providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and MoRD technical specification clause 1204.3.8.BI01010001010000000000000515BI010000120843.52Cum
3131Boulder apron laid dry without wire crates.\nProviding and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and MoRT&H Technical specifications clause 2503.BI01010001010000000000000515BI01000012099.857Cum
3232Providing and fixing G.I. pipes medim class as per IS : 1239 with latest amendment complete with G.I. fittings including trenching and refilling, cutting and making good the walls etc. complete as per CPWD specification and direction of the Engineer - in - charge. \nA). External work.\nvi). 50 mm dia. nominal boreBI01010001010000000000000515BI010000121012.2m
3333Providing fitting fixing 150 nn dia pulley for lifting of water in/c necessary welding, clamping etc. as per direction of the Engineer-in-Charge.BI01010001010000000000000515BI01000012118Nos
3434Construction of surface drain 250 mm. wide, 150 mm. deep and 125 mm. side walls with 2nd class brick masonry work 1:4(1 cement: 4 river sand) on 100 mm. thick cement concrete bed of mix 1:5:10(1 cement: 5 river sand: 10 jhama aggregate 40 mm. nominal gauge) and cement concrete 1:2:4 mix (1 cement: 2 river sand sand: 4 jhama aggregate 12.5 mm. nominal gauge) in drains including finishing with 12 mm. thick cement plaster 1:3(1 cement: 3 river sand) with a floating coat of neat cement finish complete as per standard design (Earth work to be paid separately)\n\nBI01010001010000000000000515BI01000012125sqm
3535PumpMotor istallationBI01010001010000000000000515BI0100001213
3636Providing & Lowering of submerssible pump of 45 mtr. head with suitable single phase submerssible motor in/c additional 32 mtr. submerssible 3 core copper flat cable (2.5 mm size) along with 40 mm gi pipe ( medium class) both end welded with each column pipe in 3 mtrertion 900 G.I single end flange bend G.I flange short pice G.I. tailpice and 100 mm dia C.I. non-returnvalve etc complete in respect as per direction of the engineer in charge.\na) 2000 GPH capacity submerssible pump with 3 HP submerssible Motor.BI01010001010000000000000515BI01000012141nos
3737Supplying and fitting fixing of B 13 ( size width 450mmXlength 1200mmX height 850mm) fitted with 4 nos suportt of 75 mm X 75mm( 6mm thick) M.S. angle for embedding in 1:2:4 cement concrete base ( size 300 mm X 300 mm dia X600 mm) with proper locking arrangement and coated with anti corrosive main switch energy metter etc complete in all respect as per derection of the Engineer in charge.BI01010001010000000000000515BI01000012151nos
3838Supplying and fitting fixing single phase motor starter unit( with 2 pole contactor, overload relay , volty metre& amps metter) 32 amps main switch(| 220 volt) of hecvels/BCH/L&T make in KILOSK in/c necessary elctric wiring and G.I. pipe earthing etc complete as per direction of the Engineer in charge i).For 3 Hp Submersible motor.BI01010001010000000000000515BI01000012161nos
3939Providing and fitting fixing with PVC insulated 3 core flat Copper cable conforming to relevant IS code for submerssible motor with all necessary equipments and fittings as required as per specification and direction of the Engineer-in-charge.\ni. 2.50 sqmmBI01010001010000000000000515BI010000121730Mtr.
4040Trial run and commissioning of the same in all respect as per direction of the engineeri-in - Charge.BI01010001010000000000000515BI01000012181Job
4141Laying of PipelineBI01010001010000000000000515BI0100001219
4242Excavating trenches of required width for pipes, cables etc. including exacavation for sockets, dressing of sides where required, ramming of bottoms, depth upto 1500 mm(slope-1 in 200) including getting out the excavated soil and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil with all required leads as per Chapter - 2 of CPWD specification and direction of the Engineer - in - charge.\nA). For UPVC pipes in new work\na). In all kinds of soil\ni). For pipes not exceeding 90 mm diaBI01010001010000000000000515BI01000012201236Mtr
4343Providing and fixing G.I. pipes medim class as per IS : 1239 with latest amendment complete with G.I. fittings including trenching and refilling, cutting and making good the walls etc. complete as per CPWD specification and direction of the Engineer - in charge.\nA) External work.BI01010001010000000000000515BI0100001221
4444i. 40 mm dia. nominal bore\nBI01010001010000000000000515BI010000122236mtr.
4545ii. 80 mm dia. nominal bore\nBI01010001010000000000000515BI010000122336mtr.
4646Providing, fixing and laying rigid UPVC pipes conforming to IS : 4985 jointing with couplers, of same class conforming to IS : 10124 ( Pt-II ) with solvent cement conforming to IS : 14182 including testing of joints complete ( but excluding the cost of specials like bend, tees etc. which will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge.\nA.Class - 3 ( working pressure 6.0 kg / cm2)BI01010001010000000000000515BI0100001224
4747i)40 mm ODBI01010001010000000000000515BI0100001225600mtr
4848ii)50 mm ODBI01010001010000000000000515BI0100001226600mtr
4949iii) 90 mm OD\nBI01010001010000000000000515BI010000122736mtr
5050Providing and fixing C.I. sluice valves ( with cap ) complete with bolts, nuts, rubber insertions etc. ( the tail pieces if required will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge.\ni)50 mm dia A. PN - 1.0BI01010001010000000000000515BI01000012282each
5151Providing and fixing G.I. Bend /elbow in the pipe line including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge.\nBI01010001010000000000000515BI0100001229
5252a) 15 mm dia.BI01010001010000000000000515BI010000123040nos
5353b) 40 mm diaBI01010001010000000000000515BI01000012312nos
5454c) 50 mm dia.BI01010001010000000000000515BI01000012322nos
5555b) 80 mm dia.BI01010001010000000000000515BI01000012331nos
5656Providing and fixing G.I. equal Tee with the pipe line including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge.\nBI01010001010000000000000515BI0100001234
5757a) 40 x 40 x 40 mm dia.BI01010001010000000000000515BI01000012355nos
5858b) 50 x 50 x 50 mm dia.BI01010001010000000000000515BI01000012365nos
5959c) 80 x 80 x 80 mm dia\nBI01010001010000000000000515BI01000012372nos
6060Providing and fixing G.I. Unequal Tee with the pipe line including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge.\nBI01010001010000000000000515BI0100001238
6161ii) 50x50x15 mm diaBI01010001010000000000000515BI01000012395nos
6262iii) 40x40x15 mm diaBI01010001010000000000000515BI01000012405nos
6363iv) 80 x 80 x15 mm dia\nBI01010001010000000000000515BI01000012411nos
6464Providing and fixing G.I. Reducer with the pipe line including testing of joints complete as per CPWD specification and direction of the Engineer - in - charge.\nBI01010001010000000000000515BI0100001242
6565a) 50 x 40 mm dia.BI01010001010000000000000515BI01000012435nos
6666b) 80 x 50 mm dia\nBI01010001010000000000000515BI01000012441nos
6767Providing and fixing G.I. socket as per CPWD specification and direction of the Engineer - in - charge.\nBI01010001010000000000000515BI0100001245
6868iii) 15 mm dia\nBI01010001010000000000000515BI010000124640nos
6969i) 40 mm diaBI01010001010000000000000515BI01000012472nos
7070ii) 50 mm diaBI01010001010000000000000515BI01000012482nos
7171Providing and fixing G.I. union as per CPWD specification and direction of the Engineer - in - charge.\ni) 15 mm diaBI01010001010000000000000515BI010000124940nos
7272Making road crossing by horizontal boring for smooth laying of UPVC / CI / DI / GI pipes etc. of required dia complete as per specification and the direction of the Engineer-in-charge.\nB). by manual meansBI01010001010000000000000515BI010000125040Mtr.
7373Providing and laying of flexible PVC pipe (conforming to IS:7634) complete as per specification and direction of the Engineer - in - charge (cost of earth work and fittings will be paid separately). \na) 15mm diaBI01010001010000000000000515BI0100001251300Mtr.
7474Providing and fixing brass ferrule with C.I. cover conforming to IS :2692 including boring and tapping the main as per chapter 20 of CPWD specification and direction of the Engineer - in - charge.BI01010001010000000000000515BI0100001252
7575i. 10 mm nominal bore \nBI01010001010000000000000515BI010000125330nos
7676ii.15 mm nominal boreBI01010001010000000000000515BI010000125410nos
7777Providing and fixing in position Precast RCC hydrant post of size 200 x 200 mm at the bottom & 150 x 150 mm at the top and 1300 mm high ( made with cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 brick aggregate 1st class 20 mm nominal size) and steel reinforcement ( TMT bars ) 8 mm dia 1200 mm long 4 nos and 8 mm dia stirrup 9 Nos ), 500 mm shall be kept below ground level , embedding the same with in 500 x 500 x 500 mm cement concrete 1 : 5 : 10 ( 1 cement : 5 sand : 10 brick aggregate 1st class 40 mm nominal size ) including plastering the exposed surface with 12 mm thick cement mortar 1 : 3 ( 1 cement: 3 sand ) finished with a floating coat of neat cement ) including providing & embedding 15 mm dia G.I. pipe (medium class) 1250 mm long with necessary GI fittings like elbow 2 Nos, socket 1 no, nipple 300 mm long 1 no, union 1 no etc. and fitting fixing of CI long handle bib cock by welding with GI socket complete with all earth work required including refilling as per CPWD specification and direction of Engineer-in-charge.\nBI01010001010000000000000515BI01000012551Nos
7878Providing and fixing in position Precast RCC platform of size 1100 x 1100 mm x 100 mm with curb of size 50 x 50 mm keeping an opening of 100 mm long in a suitable place for draining out of water ( made with cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 brick aggregate 1st class 20 mm nominal size) and steel reinforcement ( TMT bars ) 8 Nos, 8 mm dia in both direction including plastering the exposed surface with 12 mm thick cement mortar 1 : 3 ( 1 cement: 3 sand ) finished with a floating coat of neat cement ) complete with all earth work required including refilling as per CPWD specification and direction of Engineer-in-charge.BI01010001010000000000000515BI01000012561Nos
7979Constructing masonry Chamber 90 x 90 x 100 cm, inside with brick work in cement mortar 1 : 4 ( 1 cement : 4 fine sand ) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep ( inside ) with chained lid and RCC top slab 1 : 2 : 4 mix ( 1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size ) necessary excavation foundation concrete 1 : 5 : 10 ( 1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size ) and inside plastering with cement mortar 1 : 3 ( 1 cement : 3 fine sand ) 12 mm thick finished with a floating coat of neat cement complete as per standard design, CPWD specification and direction of the Engineer - in - charge.\nA). With First class bricksBI01010001010000000000000515BI01000012572nos
8080Providing and fitting fixing PVC / plastic bib cock conforming to IS : 9763 in hydrant points at different location as per specification & direction of the Engineer-in-charge\ni. 15 mm dia PVC /plastic bib cock \nBI01010001010000000000000515BI010000125850No.
8181Providing, fixing and laying fabricated UPVC end cap conforming to IS : 10124 ( Part 4 ) with solvent cement conforming to IS : 14182 including testing of joints complete as per CPWD specification and direction of the Engineer - in charge\nBI01010001010000000000000515BI0100001259
8282i. 40 mm dia\nBI01010001010000000000000515BI01000012604nos
8383ii. 50 mm dia \nBI01010001010000000000000515BI01000012614nos

AI Tender Summary

OUR REF NO 26157420
AUTHORITY Government Departments
TENDER VALUE 16.32 Lakhs
LAST DATE 24-12-2020
Authority
Authority Name Public Works Department
Work Description Construction Of 01 ( One ) No Masonry Well ( 6 . 0 Mtr Dia ) Providing And Laying Pipe Line In C Allied Works Within The Jurisdiction Of Dws Sub Division , Damcherra
Basic Detail
Tender No 307/EE/DWS/DMN/2020-21
Bidding Type Tender
Location
City Damcherra
State Tripura
Key Dates
Publish Date 03 Dec 2020
Submission Date 24 Dec 2020
Open Date 24 Dec 2020
Finance
Tender Value 16.32 Lakhs
Tender Fee 1000
EMD 16324
Exemption Not Available
Document List
Tendernotice_1.pdf
DNIeT307.pdf
BOQ_14528.xls
08671CB9-4FE9-4676-BE68-95281CC3E4FD.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 03, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 24, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 24, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

pdf

DNIeT307.pdf

xls

BOQ_14528.xls

html

08671CB9-4FE9-4676-BE68-95281CC3E4FD.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders